2025Congratulations
When is the induction date
2025Congratulations
When is the induction date
Will they scale it up like we're doing for ghatak?
AFAIK That's the full size product.Will they scale it up like we're doing for ghatak?
I doubt it. T129 is produced under license and getting permissions, all the extra engineering, validation, testing etc. wouldn't worth it considering the license expires in 2028. Besides, TAI is developing T629 for the same class and that will use militarized TS1400.Turkey T 129 Akak attack helicopter engine ready in 2026.
We are talking about giving Pakistan 30 T129 ATAKs with domestic engines.
Seems smallAFAIK That's the full size product.
Will any Turkish member here tell me that how long is ANKA 3 UAV?
And will they scale it up?
Also do they have plans to incorporate fluidic thrust vectoring nozzle?
@rodeo
Why do you feel that way?More the days passes, they more I feel like I can define this thread in one word...
... एहसास-ऐ-कमतरी
I think it's because of Slow bureaucracy for funds approval and slow R&D.Why do you feel that way?
Specs ? Current /future engineOfficial video of it
MTOW: 12tonsSpecs ? Current /future engine