Wow ! IAF hangers manufactures LCA ?IAF hangers. Go nd check.
Wow ! IAF hangers manufactures LCA ?IAF hangers. Go nd check.
So in a thread dedicated to LCA MK1/1A one should not ask about the progress of manufacturing of jets ! So what should be discuss ? Virtues of HAL. ?@Bleh Ignore. It was specifically for his information.
@onlinpunit Yes and meteor will be fired from LCA straight for idiots asking stupid question on loop like
Aug 1 !
Where art thou Tejas FOC !
Study... contest election... win... and become defence minister to get update every second of what is moving where. U r literally spamming the thread everyday with same question.
Ok whoever we saying that were in their money.. Always thought this'll be MWF or AMCA.Nashik Plant to be revamped for production of additional Tejas - Indian Defence Research Wing
SOURCE: IDRW NEWS NETWORK State-owned plane-maker Hindustan Aeronautics Limited (HAL) is taking steps to convert its present MIG Complex located in Ojhar Township, Nasik (Maharashtra) to be used as an additional production facility for locally developed LCA-Tejas Mk1 and Mk2 program in the next...idrw.org
Ur question history speaks y u r ignored. Try adding constructive questions and post.So in a thread dedicated to LCA MK1/1A one should not ask about the progress of manufacturing of jets ! So what should be discuss ? Virtues of HAL. ?
Its being done keeping in mind MWF only. AMCA is too far ahead.Ok whoever we saying that were in their money.. Always thought this'll be MWF or AMCA.
Minimum changes in physical aspect. Hardening on few surfaces but won't be that big a deal. Composite will be increased a bit, nothing major. Radome should vary as AESA will be used. Most changes will be in EW suite. UEWS with further integration of newer missile systems but same can be armaments can be integrated with MK1 too.mk1a ll look exactly like FOC or any different .. when can we expect to see the 1st mk1a
First one will be final production spec?Minimum changes in physical aspect. Hardening on few surfaces but won't be that big a deal. Composite will be increased a bit, nothing major. Radome should vary as AESA will be used. Most changes will be in EW suite. UEWS with further integration of newer missile systems but same can be armaments can be integrated with MK1 too.
First quarter 2024 Jan-Mar.
Yes. First one rolled out by Feb-Mar 2024 should be with all integration and final specs. LSP already being modified and will be added with all EW suite modifications and other electronics upgrades by end of the year. About 2 years timeline is set for all testing to be done with even all the armaments integration.First one will be final production spec?
I don't know how testing relates to production. At what point is the decision taken to start building more aircraft?
3-4 aircraft in 2023-24 ( between Jan - March ) financial year then 16 jets per year.if I remember correctly its 8 aircraft and from 2025 it should be 16 per year.
No. That 3-4 report was based on contract signing by Oct 2020. Since it was in Feb 3-4 cant be by Mar 2024.3-4 aircraft in 2023-24 ( between Jan - March ) financial year then 16 jets per year.
It's my fault that MD of HAL gives an interview promising resumption of LCA delivery / manufacturing by july end..Ur question history speaks y u r ignored. Try adding constructive questions and post.
I will try to answer one last time. HAL MD said we will deliver. Few weeks back news came which I think u know about that IAF is not able to take delivery as Sulur base is already occupied. Most probably base where Tejas were to be shifted either not done or some other issue. So There is delay in taking delivery. After that no update is received from either sides. So there is no info. If there would have been then somebody would have posted. Asking same question again and again won't give u answer as no one on the forum works on MoD. Everyone is depending on news portal and bit of sources.It's my fault that MD of HAL gives an interview promising resumption of LCA delivery / manufacturing by july end..
But at the end of July progress is still nil..
So keep ignoring.
It is quite possible delivery might start from Feb-March 2024 but HAL will produce 16 jets /year from beginning unlike 8 jets only during March-2024 to March 2025.No. That 3-4 report was based on contract signing by Oct 2020. Since it was in Feb 3-4 cant be by Mar 2024.
When HAL's MD told you They will start delivering a lots of Tejas FOC right from July or August?It's my fault that MD of HAL gives an interview promising resumption of LCA delivery / manufacturing by july end..
But at the end of July progress is still nil..
So keep ignoring.
Possible. I read the delivery first year won't be 16 as mostly inputs r taken from first lot aircrafts. But I can be wrong on that. It was 18 trainers than 8MK1a then 16 per year from 2025 if I m right.It is quite possible delivery might start from Feb-March 2024 but HAL will produce 16 jets /year from beginning unlike 8 jets only during March-2024 to March 2025.
Keep.chewing his statement !When HAL's MD told you They will start delivering a lots of Tejas FOC right from July or August?
He meant to say.... Hopefully Supply from MSMEs will be resumed by July. So calm down yourself or meanwhile you can go to IAF office to ask when are they going to receive 4 fully built Tejas from Bangalore?
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
LCA Tejas: Photos & Footages (no text other than headings) | Military Multimedia | 87 | ||
LCA TEJAS and what makes it stand out | Knowledge Repository | 8 | ||
W | Rise of LCA Tejas Multi Role Fighter Aircraft | Indian Air Force | 23 | |
C | LRUs or parts of LCA Tejas Made and designed in India | Indian Air Force | 16 |