True. And the real maturity of our aerospace industry will be revealed when the LCA Mk2 comes out. While yes we are trying to build 5th gen aircrafts and naval aircrafts, the near term goal is to take our industry to a point where we can design and build a Gripen-E class of aircraft without much fuss. Thats where our own industry, and the ability to integrate niche technologies from abroad (until we make them here) comes into play.Bich india makes all of the fuselage (except the radome & engine, that's imported)... Other than that the refueling probe, HMDS, radar & ejection seat are still imported.
Those are the low use high-end stuff, ie, they require a considerably high amount of money in the R&D compared to more parts/subsystems (like radar that we've now developed).
That's exactly why we've importing engines & radars until now!By the same logic we are wasting money developing engines as we can buy them off the shelf as in the case of Tejas, same goes for Uttam AESA radar (we can get ToT for EL/M-2052) or DARE EW warfare suite (we can get ToT for EL/M-8222 jammer and its Eco-system) and the list goes on.
Not the entire refuelling probe is imported, only nose tip of the probe is imported. This is said by Grp Capt HVT sir.Bich india makes all of the fuselage (except the radome & engine, that's imported)... Other than that the refueling probe, HMDS, radar & ejection seat are still imported.
Those are the low use high-end stuff, ie, they require a considerably high amount of money in the R&D compared to more parts/subsystems (like radar that we've now developed).
Heck chonks imported these components for long enough , and hmd is not too much capital intensive as much as radome , hud is costly endeavor but it can be ditched as many are doing it .That's exactly why we've importing engines & radars until now!
Now we are in a position to have developed our own radar & then jammer, someday later engine... work on desi ejection seat is ongoing. And HMDS & HUD will happen last, when everything else is done.
That's what I'm trying to explain whyHeck chonks imported these components for long enough , and hmd is not too much capital intensive as much as radome , hud is costly endeavor but it can be ditched as many are doing it .
It's for tejas?@Bleh @Spitfire9 @Dark Sorrow I thought I remembered news regarding this. Check these.
RADOME TECHNOLOGY - CSIR - NAL
www.nal.res.in
No, its for AMCAIt's for tejas?
We were importing engines & radars until now because our projects failed to deliver products with expected performance. We are not because importing was cheap as inferred by your statement.That's exactly why we've importing engines & radars until now!
A genuine request to all fellow members to refrain use of word desi for Indian projects as it downgrades the product image as some cheap Indian makeshift product. Especially in current times when we are attempting to inroads in defence export. PR and image plays very important role in today's world and words like desi are counterproductive to our product's image.desi ejection seat is ongoing
The word desi should be prohibited it should be made in IndiaWe were importing engines & radars until now because our projects failed to deliver products with expected performance. We are not because importing was cheap as inferred by your statement.
Both Kaveri and MMR projects failed hence we had to source engine from GE and radar from Elta Systems.
The whole point of project like Tejas is to cultivate and develop local eco-system. Buying parts off the shelf won't help with that.
A genuine request to all fellow members to refrain use of word desi for Indian projects as it downgrades the product image as some cheap Indian makeshift product. Especially in current times when we are attempting to inroads in defence export. PR and image plays very important role in today's world and words like desi are counterproductive to our product's image.
Astra, observatories, Jaguars, AMCA and future programs. Even for Tejas MK1a I remember seeing image of Radome being tested but unable to find dt.It's for tejas?
Ya'll Nibbiars you dalal.Billa is the customer
IAF hangers. Go nd check.Aug 1 !
Where art thou Tejas FOC !
HAL hangers you meanIAF hangers. Go nd check.
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
LCA Tejas: Photos & Footages (no text other than headings) | Military Multimedia | 87 | ||
LCA TEJAS and what makes it stand out | Knowledge Repository | 8 | ||
W | Rise of LCA Tejas Multi Role Fighter Aircraft | Indian Air Force | 23 | |
C | LRUs or parts of LCA Tejas Made and designed in India | Indian Air Force | 16 |