pmaitra
New Member
- Joined
- Mar 10, 2009
- Messages
- 33,262
- Likes
- 19,600
Good to see you posting after a long hiatus.Kaveri is a good engine, the corrupt bloks out in MES probably have taken a huge kick back to consider the American engine. Even for asking a road contract people have to pay the CE at least 10% commission, that's the same as aiadmk going rate for road contract, 10% upfront in cash that is.
With so much corruption everyone from Russians to Pakistanis have lobbies inside our military. Kick backs are generally the norm. There is no reason LCA is not yet inducted except the international arms dealers have payed of the top. If it's open knowledge that the divisional CE takes 10% commission to award works and everyone in the MES knows about it then getting kick backs from deals is no big deal. Russians pay well and that's why we buy more MKIs.
Kaveri won't be allowed to see the light of day, if this was China they would have strapped it on by now and Climed it to be better than f-104.
I don't think GE F-404 needed kickbacks to be considered for the LCA. It is indeed a capable turbine, and did serve LCA well, if the recent demonstration in Bahrain is any indication. We need to worry about kickbacks when we have something as good as the GE F-404 and despite that, GE F-404 is picked.