- Joined
- Oct 14, 2020
- Messages
- 27,597
- Likes
- 190,883
Ahmedabad-Mumbai High Speed Bullet Train progress
Last edited:
one the ideas being attempted is integrated power plants with 24 hour renewable supply capacity, in practical terms it could be wind + solar + battery storage. during the day solar will supply and at night battery will supply.Three Companies signed Program Agreement under (PLI) Scheme for Advanced Chemistry Cell Battery Storage
In addition to capacities allocated by MHI under PLI Program, private players are expected to create battery manufacturing capacity to tune of~95 GWh
18000 crores over a period of 5 years.
Will recommend to watch below interview on nuclear energy .
Specially the parts -
25 : 20 to 37 : 36 and
1 : 06 : 35 to end
Nuclear power by country - Wikipedia
en.wikipedia.org
22 reactors in India producing only 40GWh? Curious as to why lots of small capacity reactors - just old gen or lack of Uranium supply? From the Wiki it appears new planned ones will be of Russian, French, US and some homemade design. With new discoveries of Uranium reserves then there should really be a big push for nuclear - though a big upfront cost. Crush any "protestors" ruthlessly. Interesting to see France and China have nearly the same number of reactors and capacity yet while nuclear accounts for 70% of France's energy demand it's only 5% of China's - wow.Nuclear power in India - Wikipedia
en.wikipedia.org
A small correction. Its 47TWh per year.22 reactors in India producing only 40GWh?
Ya'll Nibbiarsone the ideas being attempted is integrated power plants with 24 hour renewable supply capacity, in practical terms it could be wind + solar + battery storage. during the day solar will supply and at night battery will supply.
first of these could come up in madhya pradesh .
you decide ...
IMO, container themselves have enough weight that they cannot topple over if balanced properly. On trucks, they bolt the container to carrer .. beleive same would be case here too.How do they make sure that the double freight containers are not toppled over by wind?
NIce, I am trying to convert my native home to complete solar energy but babudom kills the whole motivation with everything.one the ideas being attempted is integrated power plants with 24 hour renewable supply capacity, in practical terms it could be wind + solar + battery storage. during the day solar will supply and at night battery will supply.
first of these could come up in madhya pradesh .
According to Lavde ka SSCWarrior on DFI r/ndians can stop the Nicobar Island Megaproject by a simple circlejerk on r/ndia.
This thread is a prime example of why 82iq pajeets will remain a global joke. Chinks did a good thing running tanks over idiot leftists. Maybe India needs a cultural revolution to cure this virus as well. Most indians are brainwashed to embrace poverty and primitive infrastructure and the worst part are these are the so called educated ones
Why not? NGO mafia has already started their randi rona. We both know how sagarmala project ended up thanks to them and the fishermen lobby. This project will end up the same unless the EIA laws that were supposed to be passed 2 years ago get passedGem of a video, I know it has been posted before on the Economy thread but a lot of important announcements were made by Railways Minister.View attachment 165887View attachment 165888View attachment 165889View attachment 165890View attachment 165891
According to Lavde ka SSCWarrior on DFI r/ndians can stop the Nicobar Island Megaproject by a simple circlejerk on r/ndia.
It's been 10 years now hearing about new delhi railway projectGem of a video, I know it has been posted before on the Economy thread but a lot of important announcements were made by Railways Minister.View attachment 165887View attachment 165888View attachment 165889View attachment 165890View attachment 165891
According to Lavde ka SSCWarrior on DFI r/ndians can stop the Nicobar Island Megaproject by a simple circlejerk on r/ndia.
The station redevelopment project is a bloody scam. Most of these were announced in 2015-16 and nothing got built except gandhinagar and bhopal, which looks nothing like the original renders. It is very easy to deduce that the end product will not look like the renders shown here. The tender value is too low for such structures. For example this is kanpurIt's been 10 years now hearing about new delhi railway project
will have to check each DPR, but it seems the tender value is not for entire redevelopment cost but only for what railways pays. developer also puts his own money and in return gets BOT on assets for 25 years or so.The station redevelopment project is a bloody scam. Most of these were announced in 2015-16 and nothing got built except gandhinagar and bhopal, which looks nothing like the original renders. It is very easy to deduce that the end product will not look like the renders shown here. The tender value is too low for such structures. For example this is kanpur
How can you build such a grandoise station for only 712 crore? I will believe when i see it. Some of the other proposed costs are even worse
Just 230 crores for this? How?
190 crores for this?? 0 chance at all. Building such structures with so much steel and glass wont be cheap at all. Plus India's construction material costs are not exactly low either