Infrastructure and Energy Sector

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
24,902
Likes
89,905
Country flag
Ya'll Nibbiars The Mumbai Pune expressway missing link project. The 2 170m tall piers wil rise where the crane is installed which wil support two cable stayed bridges 770 Meters and 645 Meters, the other 2 piers wil rise from where this photograph is taken.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
24,902
Likes
89,905
Country flag
Eh? Mumbai Local ki bheed thodi lagti hai udhar. Latest news I got was a guy dying by suicide at the station. They can go easy here.
Ya'll Nibbiars we are talking about local here. If the Indian railway do care about passenger should the DMRC should also do the same what kind of logic is this?.
 

Blademaster

Senior Member
Joined
Aug 19, 2009
Messages
4,263
Likes
13,216

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
24,902
Likes
89,905
Country flag
How do they keep the homeless people out and taking over it and turning into slums?
Ya'll Nibbiars The Slum population is on the deduction in Mumbai.
 

SKC

Senior Member
Joined
Aug 16, 2014
Messages
4,417
Likes
14,155
Country flag
Ya'll Nibbiars Where the Delhi Metro gone wrong the Mumbai Metro got it right. The station need to be like this. The Delhis looks like a glorified Railway stations. They could had hired renowned architect like the Mumbai Metro but they didn't.

View attachment 166794View attachment 166795View attachment 166796View attachment 166797View attachment 166798



Ya'll Nibbiars Most Delhi station still dont have platform train separation doors
Bhai ek baar Delhi Metro aa kar dekh le sab shive door ho jayenge. Enough Delhi metro station are built beautiful and enough stations have platform doors.
 

Chinmoy

Senior Member
Joined
Aug 12, 2015
Messages
7,354
Likes
18,004
Country flag
U know talks are going on that even in 5g spectrum some scams have occurred like govt projected something but earned less
I am not clear actually but people are talking about it in public
Anyway we have to wait for cag report
That's how scam is created out of thin air.

The total earning from 5G auction was 1,50,173 Crore opposed to 1 Lakh crore of 4G spectrum back in 2015. Although officially govt has said that they were expecting 1 Lakh Crore to be the value and it exceeded their expectation. But keeping in mind the 4G auction 7 years back, we could assume that the turnout is less then what govt has envisaged. Now opposition has to just air the theory that there was a scam as govt was planning to raise 2 Lakh Crore but only managed 1.5 Lakh Crore. Now this is simple theory that Govt could manage anything and if they are short of 50Lakh Crore, it means they are lying and there is a scam.

Now why it was probably less then expected?

Government has kept the reserved price of 700MHz band high. They expected to have a massive bid for this sub-GHz band as it would mean better coverage even in rural areas. But apart from Jio, no one actually bid for it. Jio purchased the whole 10MHz frequency airwave in 700MHz bandwidth.
 

Blademaster

Senior Member
Joined
Aug 19, 2009
Messages
4,263
Likes
13,216
Massive and huge number of beds are all good but how do you keep the hospital rooms, ERS, and ORs sanitized from the dangers of MRSA which are the biggest threat to hospitals right now? It costs a fortune to keep the hospitals sanitized and keep deadly diseases from spreading.

The trend should be hospitals that are easy to tear down and replaced in order to get rid of any persistent bacterias and viruses. A concept should be something like this: A skeletal framework of a hospital and each room gets placed into that frame for use by a visiting patient. After that patient is done, that room should be removed and be sanitized in a huge cleaning room for repeated use by a new patient. This way the spread of all diseases including MRSA could be controlled to prevent any breakouts.
 

Akula

Senior Member
Joined
Apr 24, 2019
Messages
2,890
Likes
10,819
Country flag
Can anyone tell about it’s progress? Given the kind of our non-existent city planning how will they run these systems?
In Dehradun(2017), survey and geotechnical test were done for metro but after that nothing happened.
 

Arjun Mk1A

Senior Member
Joined
Mar 6, 2022
Messages
1,381
Likes
7,828
Country flag
Here is another opportunity for GoI and UP for Urban redevelopment plan for Agra Taj Mahal Location.
1660062386262.png


Complete redevelopment with housing, commercial centers and recreational centers for people visiting Taj Mahal and cherry on top will be a Metro connectivity will do wonders for both Tourism and economic activity.
 

Butter Chicken

Senior Member
Joined
Oct 6, 2016
Messages
6,260
Likes
39,553
Country flag
Here is another opportunity for GoI and UP for Urban redevelopment plan for Agra Taj Mahal Location.
View attachment 167088

Complete redevelopment with housing, commercial centers and recreational centers for people visiting Taj Mahal and cherry on top will be a Metro connectivity will do wonders for both Tourism and economic activity.
So called activists will commit suicide if even 1 tree is cut
 

Latest Replies

Global Defence

New threads

Articles

Top