Ya'll Nibbiars The Mumbai Metro Double decker metro work is in full swing. A pic of Meditya nagar station which has 3 levels. The 1st is flyover which is going towards bhayander. 2nd is Concourse level 3rd is Platform level.
Ya'll Nibbiars The Mumbai Pune expressway missing link project. The 1st Breakthrough of LHS tunnel. At 23.5 m ,it wil be one of the widest tunnels in the world.
Total length of twin tunnels 8.92 kms each.
Ya'll Nibbiars The Belgaon Khanapur 4 laning works. Ashoka buildcon had managed to complete this section but rest of road till panaji remains incomplete due to work stay bought on by environmentalists.
Ya'll Nibbiars The Sihora Rubberdam: India’s 2nd & Maharastra’s first airfilled rubberdam being constructed by YOOIL infra. - India’s Highest and longest single span airfilled rubberdam -Secant pile is used as hydraulic cutoff in barrage, second time in India after Kaleswaram Project.