Physx32
Senior Member
- Joined
- Feb 28, 2019
- Messages
- 1,511
- Likes
- 10,000
![India Country flag](https://defenceforumindia.com/misc/flags/shiny/32/India.png)
Didn't get your last sentence . Can you elaborate ?
![swarajyamag.com](/proxy.php?image=https%3A%2F%2Fswarajya.gumlet.io%2Fswarajya%2F2023-03%2F19c42791-02cb-41b2-9a3f-1ec6279a3c37%2Fjpg__1_.jpg&hash=e2358597c0614b82fd6e774ceeca2e10&return_error=1)
Mumbai Urban Transport Project: Centre Drops Two Multi-Crore Key Suburban Rail Connectivity Lines To Navi Mumbai
The Chhatrapati Shivaji Maharaj Terminus (CSMT)-Panvel elevated fast corridor and the Virar-Vasai-Panvel suburban rail line, both part of the MUTP-3A, have been shelved by the Centre.
swarajyamag.com
Apart from this, IR keeps delaying installation of CBTC on existing suburban lines. Since 2019, they're saying that "IR is working on indigenous CBTC technology". It's 2024 and there's no progress.
With CBTC signalling, headway can be reduced to 2 min, which will reduce crush loads during peak hours.