- Joined
- Oct 3, 2020
- Messages
- 2,190
- Likes
- 4,386
There are only 2 fucking solutionsProspective deliveries of new Rafale is expected around 2027. MRFA (other than Rafale may be expected by 2025).
Taking this into regards 2024 of Mk. 1A seems acceptable.
1)increase the production without looking at cost as its not important than lives and tech edge
2)reduce or fasten the testing period of mk2 on war footing
We need to realize we are in situation of war with all bad relation no delays no lethargy
We need to be aggressive in upgrading our existing fleet for that you need to convince fucking babooz and political assholes
Atleast start updating avionics of su 30 by 2024
No other sol left