Bhadra
New Member
- Joined
- Jul 11, 2011
- Messages
- 11,991
- Likes
- 23,756
Shub this reference somewhere ...Get used to it this guy has 0 sources for idiotic claims. When said his info is inaccurate all he does is abuse people. No rational debate can be had with this guy he lives in his own delusional world.
NAG has been in Army trials for nearly 12 years. Spike with its faulty seeker was ordered after maybe 6 months at best of trials.
DRDO Anti Tank Missile - Wikipedia
en.wikipedia.org
*****************************
Introduction[edit]
In 1959, India started a feasibility study on a First Generation Anti Tank Missile (ATM). New General Staff Qualitative Requirements (GSQR) were issued and the task of preliminary study and wind testing was assigned to Department of Aeronautics and Institute of Science, Bangalore.[1]
Development[edit]
In 1962, DRDO was granted ₹6 lakh (equivalent to ₹4.1 crore or US$580,000 in 2019) to begin work on developing an Anti-Tank missile due to conflict with China in Ladakh. It has a range of 500 meters to about 2 km.[2][3]
After the first aerodynamic design was completed, a full-scale model of the complete configuration was tested in a wind tunnel at IISc Bangalore. At Bangalore, this model was tested for the force and momentum tests which were completed in 1961. Vibrating spoilers were used during these tests to determine control effectiveness. The ATM was designed to have a subsonic flight speed of about 90 m/s (300 ft/s).[1] In 1963, the entire design was reworked for accommodating 106 mm HEAT warheads in the ATM.
^^^^^^^^^^^^^^^
If you wish to go by specific Name - NAG.. the NAG project commenced in 1988.... good 32years ago... but it is an ATGM only and one can say the ATGM project started in 1962...