- Joined
- May 21, 2016
- Messages
- 3,966
- Likes
- 20,402
but it's also lightweight for whatever it does, compared to Dhanush; still not as lightweight as M777 which is 39 calibre gun though.IIRC Sharang is just an upgrade of M-46. No electronics will be added. I think only loading assist, maybe added. In any case, if I remember correctly, the budget was Rs.200 crores for first 300 Sharang and then another order for next 300
As usual with DPSU, the production is going very slowly and only 60 completed
A look at the cost will give you indication that it is a low cost upgrade of Rs.1 cr Each compare to dhanush which is Rs.15 cr each.
We should mass produce Sharang 155mm and replace existing 130mm with them along with 155mm 45 cal Dhanush.