smooth manifold
New Member
- Joined
- May 14, 2019
- Messages
- 971
- Likes
- 563
a previous front view............
That looks quite a bit bigger than CdG carrier.
CV17 Shandong literal meaning: East of the Mountains.China’s second aircraft carrier the Shandong officially enters service
https://www.scmp.com/news/china/mil...d-aircraft-shandong-carrier-officially-enters
Published: 6:01pm, 17 Dec, 2019
The ship is a modified version of the Kuznetsov-class design that features upgraded radar and bridge systems and a ski-jump deck for take-offs.
The ship will be able to carry 36 J-15 fighter jets compared with the Liaoning’s capacity of 24.
Beijing-based naval expert Li Jie said in total it will be able to carry 40 aircraft, including Z-9 helicopters and KJ-600 early warning planes.
The carrier was constructed by the Dalian Shipbuilding Industry in Liaoning province. The company started work on the vessel in November 2013, and laid down the keel for its hull in a dry dock in March 2015.
Li said the commissioning was a “big gift” to mark the 20th anniversary of Macau’s return to Chinese rule. Xi is expected to travel to the casino city on Wednesday for the handover commemorations.
“Beijing chose Sanya [for the commissioning] because the military leadership wanted to highlight the geostrategic importance of China’s second aircraft carrier base,” Li added.
Sanya provides easy access to the South China Sea and is the largest naval complex of its kind in Asia.
Its 700-metre carrier dock is able to service multiple carriers simultaneously and the port also hosts the Yulin nuclear submarine base.
China’s first carrier base is Qingdao, on the east coast, which is the Liaoning’s home port.
Li said the two bases were able to offer complementary services to the PLA Navy.
I m Shandong origin, but born in WuhanCV17 Shandong literal meaning: East of the Mountains.
You must be really proud of your origin!I m Shandong origin, but born in Wuhan
Nov 2013 first cut of steela short clip of CV 17 Shandong's commissioning
Quite impressive , just 6 years wowNov 2013 first cut of steel
Mar 2015 laid down
Apr 2017 launched
Apr 2018 completed
Dec 2019 commissioned
No.. Only 4.5 years.. The life of a ship is considered since its keel laying and not since its steel is cut.Quite impressive , just 6 years wow
quite a few years ago ,I have quoted our distinguished forum member's statement about the China Carrier development/Construction plan here on DFI...it's a 3-step long term plan :
Step 1. Continued construction of the Imported 'Varyag' STOBAR carrier----- Project Code : Type 001
Step 2. the construction of CATOBAR Carrier / conventional power / steam Catapult / 68000-8000 tons displacement(normal and full)----Type 002
Step 3. the Nuclear Powered CATOBAR carrier with EMALS
---------------
Step 1 has been accomplished --Continued construction of the Imported 'Varyag'
. in 2004, the central government approved the plan
. in Apr 2005, the pre-construction work began
. in Dec 2008, the continued construction started in the dry dock .
. in March 2010 , it was launched and outfitting and port test began later
. in Sep 2014. it was commissioned.
it took 8 years...
and then ,the plan was marginally adjusted , another STOBAR Carrier was arranged and became the second CV(first home-made one) although PLAN strongly opposed. but central committee made the final decision and extra funds for this project was arranged besides the yearly Navy share of defense budget. the money might came from the Central government reservation savings...it might be called as Step 1.5
. around in 2010, the decision was maded
. in Novenber 2013 , the construction began
. in March 2015, the final assembly inside the dry dock began
. in April 2017, the ship was launched.
. and in 2019 (around Novenber) , it will be commissioned..
it will take 6 years/72 months
your previous prediction is pretty accurate. just one month gap.6 year is the exact building time stipulated in the contract between PLAN and the shipbuilding industry, and that's why we claimed the Type 002 delivery time node was in November 2019 years ago...
the build time of a ship always starts with the metal cutting and ends when it is delivered/commissioned, but the procurement of materials and subsystems normally is earlier...after or before the contract signing.
-----------
https://defenceforumindia.com/forum...genous-carrier-cv17.58546/page-5#post-1292578
shiphone,Apr 28, 2017
the step1.5 is done, the next important time node will be in around 2023
6 year is the exact building time stipulated in the contract between PLAN and the shipbuilding industry, and that's why we claimed the Type 002 delivery time node was in November 2019 years ago...
the build time of a ship always starts with the metal cutting and ends when it is delivered/commissioned, but the procurement of materials and subsystems normally is earlier...after or before the contract signing.
-----------
https://defenceforumindia.com/forum...genous-carrier-cv17.58546/page-5#post-1292578
shiphone,Apr 28, 2017
the step1.5 is done, the next important time node will be in around 2023
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
China to launch indigenous aircraft carrier in 2013 | China | 1 | ||
Questioning Pakistan's claim on indigenous development of Jf-17/FC-1 with China | Pakistan | 100 | ||
China's J-11B indigenous WS-10A engines have no smoke | China | 6 | ||
I | China to build indigenous jet engine by 2016 | China | 0 |