Ghost hale
New Member
- Joined
- Feb 13, 2021
- Messages
- 548
- Likes
- 1,701
now gear up for GaN jammers and radar on mk2 tejas and amca
now gear up for GaN jammers and radar on mk2 tejas and amca
at least i can hope for GaN jammers on tejas mk2
Depends on tech , type of module , power supply but fairly about 30% at leastHOW MUCH RANGE INCREASES IN GAN RADAR AS COMPARED TO GAAS RADAR? ANY IDEA
Is that means dedicated private production assembly line? HAL capacity will be used for mk2 maa production at that time?This better be true I have waited too long for this.
Haldilal , stfu ,use your original idIs that means dedicated private production assembly line? HAL capacity will be used for mk2 maa production at that time?
Brother I am not the one who write "Ya'll Nibbiars" thats Haldilal ji's copyright. I read Defence thread for knowledge, i am total Dak-kan in Military tech discussion. I keep myself limited to Politics.Haldilal , stfu ,use your original id
Right now neh , what you are saying is blue water capability , and foreign bases , long way to go , amca assembly line is jvBrother I am not the one who write "Ya'll Nibbiars" thats Haldilal ji's copyright. I read Defence thread for knowledge, i am total Dak-kan in Military tech discussion. I keep myself limited to Politics.
But i like we should have 1 Private Assembly line for AMCA, No key man risk like HAL. Dedicated HAL/Private Rafale production line.
HAL - 38 per yr ( including refale line of 18 per yr)
Private - 20 per year
Total Aircraft prod capacity at 50 to 60 planes per yr. Thats what we need in long term to fulfill both IM and export need.
In case of war we should be pushing out more planes/tanks/other equipment than destroyed.
Indian Military should be expansionary and not just guarding borders. Border guarding is not the job of IM. They should be called in war not before. They should not petrol as well. We have BSF for same reason.
True, may be around 25 to 30%.Depends on tech , type of module , power supply but fairly about 30% at least
Imo any news can't be better news than thisSo We will start testing in 18 Months... GaN Radar is here for AMCA now...
AMCA | Next Generation Radar for AMCA - GaN Uttam | Alpha Defense
An Alpha Defense Exclusive: Gallium Nitride based AESA for AMCA. Exclusive details on AMCA from www.alphadefense.in . Read here.alphadefense.in
If it will be ready with in 18 months and all the testing will be completed in two years then it can be used with mwf, later batches of mk1a and super sukhoi too.Imo any news can't be better news than this
TEDBF and AMCA as require more power. 1200-1300 TRM Uttam aesa being prepared for super sukhoi that too will be not be at 100% without AL 41s. India trying to negotiate to get those engine. Details will be out in 3-4 months barring any further delays.If it will be ready with in 18 months and all the testing will be completed in two years then it can be used with mwf, later batches of mk1a and super sukhoi too.
For this.Brother I am not the one who write "Ya'll Nibbiars" thats Haldilal ji's copyright.
Is that means
For this.
How much power does present bars radar use , as i remember that one is high on powerTEDBF and AMCA as require more power. 1200-1300 TRM Uttam aesa being prepared for super sukhoi that too will be not be at 100% without AL 41s. India trying to negotiate to get those engine. Details will be out in 3-4 months barring any further delays.
As per the article benefits of GaNTEDBF and AMCA as require more power. 1200-1300 TRM Uttam aesa being prepared for super sukhoi that too will be not be at 100% without AL 41s. India trying to negotiate to get those engine. Details will be out in 3-4 months barring any further delays.
Haldi makes many mistakes e.g. spelling, sometimes grammar and gender as well
Ya'll nibbiars delet kar warna.Haldi makes many mistakes e.g. spelling, sometimes grammar and gender as well