Well there is still sharing of resources...instead pool all your resources into one..that will help you complete the project sooner.1. Both projects are developing in Parallel.
2. Tejas MK2 development is way ahead of AMCA.
3. Scientists uses the know how and experience gained with Tejas , in AMCA.
This might be too bad to ditch a project at it Advanced stage.
Tejas MK2 is the actual demand of IAF.Well there is still sharing of resources...instead pool all your resources into one..that will help you complete the project sooner.
You should move to Pak fa thread for that.Can anyone put light on item 30 it's out of my system. Any links ?
Sent from my irisX8 using Tapatalk
IDRW is not a trustworthy source !! Ignore them.Just read in the below mentioned acticle that AMCA will take it first flight before 2022.
Anyone else believes that please let me know how is that timeline feasible.
http://idrw.org/how-developing-amca-on-an-ultra-fastrack-makes-india-a-superpower/
Seems very much possible...all they need to do is to finalize the engine fast and use existing technology on fifth generation airframe.Just read in the below mentioned acticle that AMCA will take it first flight before 2022.
Anyone else believes that please let me know how is that timeline feasible.
http://idrw.org/how-developing-amca-on-an-ultra-fastrack-makes-india-a-superpower/
Ok if that's the case can u share the trustworthy info on the same?IDRW is not a trustworthy source !! Ignore them.
See that's too vague .Seems very much possible...all they need to do is to finalize the engine fast and use existing technology on fifth generation airframe.
We can start with just the airframe whose design is finalized and develop iteratively.See that's too vague .
There is no info in the public domain on how much work is complete leave aside the engines.
We have no stealth tech. We are struggling to increase dimensions of Tejas.
How can u think we can master even the basic Stealth Tech which only a few countries in the world have ?
2022 is not a ideal timeline for even the first flight.
We are developing our RAM technology..refusal of the French to part with that technology was one of the reasons Rafale deal broke.A fifth generation fighter aircraft has a stealthy airframe that is quite different from a 4++ generation one. That is the basic stealth technology a fifth gen fighter aircraft has. Even a moron will tell us that AMCA airframe is a stealthily designed. Next is all about RAM coating. Even a 4++ generation fighter aircraft is RAM coated nowadays. Then engine, radar, ew, weapons etc etc etc. Even the pakfa doesn't have a true fifth gen engine. Chinese so called fifth gen fighters also don't have the right engine. If ADA has the determination, willpower, dedication, sincerity and support from the govt and the end user, definitely the time line is justified.
Quote of the day, absoluteky, I will say.Even first flight of AMCA will pose a great effect over our enemies.
It is apparent India needs to buy an IL-76 for its own testing purposes. Since Russia is unwilling to lease one when they have hundreds laying around then India needs to approach FSU states with IL-76 and refurbish it in Ukraine. To be denied by so called allies Russia has shown its contempt for domestication of Indian defence products. When India makes its next Rafale order one of the offsets could be construction of ground based testing facilities to complete the triad of testing excellence.I am not particularly excited by AMCA. As it will be repeat of Arjun/LCA saga. Why? Where is the urgency to invest in establishing Gas Turbine facilities? Where is the Engine Flying Test bed? Tamilmani himself earlier stated that if the decision is taken now it will take 10000 crores of investment and 10 years of development time(which seems a very optimistic time frame given India is no France/Russia in terms of engine development capability & experience). I am miffed by ADA/GTRE, because when Manohar Parrikar was Defence Minister why they did not lobby hard for establishing more complete testing facilities? Even if france comes, GTRE will have ti still grapple with question of Flying Engine Test Bed.