Yes russians can produce 1000snds of cruise missiles why not 10000snds why they use dumb bombs in the whole spectrum of operations in syria,and yes I'm exciting to know how will they bear the cost of producing them in mass,a supersonic cruise missile costs around a million US dollars.....
Go and read your stupid stuff, you'll find who started nitpicking.....
I'm sure comprehension is a problem related to you,go read my stuff again when I was responding to the other guy...limited production in the labs doesn't mean one can reciprocate that in the industries for all the moment I'm still asking where does Russia manufactures GaN in mass,I'm not intrested in what ever is in testings......
You seriously have comprehension problem and no one is going to solve that but your self,with chinese electronics I was referring to why Russians don't use Russia designed and developed electronics,chinese mobiles use SOC designed by the Americans. By the way when will russia replace expensive Airbus with the cheap Russian alternative....
Chinese reason to buy su35 is well known to the others,su35 itself uses electronics which were designed 15 years ago,when India was signing Su30 deal,russians were already testing a more powerful alternative.
"Shifting goal post,let me show the screenshot and who has continuously jumping from one point it other" seems like someone's whole argument is based on lies.....and yes russians themselves claim that they use GaA based radars and not the GaN.....
View attachment 55896
View attachment 55897
By the way how many of them are air horned fire control....
View attachment 55898
No I mean indian radar,such as Battlefield surveillance radar, radars for the Qrsam,ARUDHRA/Anuradha and not to mention the radar on the BMD system and survillance ship which uses GaN based L-S band modules manufactured by BEL...
Indian S400 buy is based on the older acquisition program when s400 itself came into existence,don't worry more about that,it will be the last time india inducts such system of the class,only five regiments we are buying when the requirement is more than that....