What's the current delivery timeline for the P-15B?The Gas Turbine engines are coming from Ukraine..
SE "Zorya"- "Mashproject" signed the contract with Indian customer for delivery of gas turbine power plants for ships that will be built at Mumbai shipyard. The contract is concluded with the parties following the results of the tender of 2012. Under the terms of the contract the enterprise will equip four new ships (Project 15B) during the period of 2016 to 2019.
The enterprise already equips the third series of such ships. In 1993-1995 the power units were delivered to India for three ships of the Project 15 (Delhi type) and in 2005-2006 for three ships of the Project 15A (Kolkata type).
The enterprise will produce an updated gas turbine power unit with microprocessor control system.
Their dates seem to conflict the one in the report by Indrus. If the last unit will be delivered by 2019 it won't take MDL 6 years to deliver the final destroyer