Blank
New Member
- Joined
- Jan 23, 2021
- Messages
- 906
- Likes
- 6,384
April FoolIs this true? there is no news on this apart from thus source.
April FoolIs this true? there is no news on this apart from thus source.
Our naming tradition is a hybrid of Royal Navy and US Navy in that we name all our warships after Mythological figures/creatures or Sea creatures and figures. This convention might never change as it's neutral politically for everyone and nobody will be lobbying about names at the MoD or in the Parliament.Guys, just a small thought . Wouldn't it be great to name these P-75A subs after our great kings, like Chatrapati Shivaji Maharaj, Raja Raja Chola, Sri Krishna Devaraya, Prithvi raj chauhan etc
It's p 75 alpha ,the nuclear one , that's p75 i you are talking about ,the deisel oneWe have been discussing this for many years. As it always happens, this project is in Limbo for years and now something seems to be happening. Most of the delay in our acquisition of product or development of product is because of poor decision making and not because of the development time and acquisition time. Now we can hope that all this delay is utilised to configure the submarine in most sophisticated way. We can hope that all the selection procedure and other things will happen in time bound manner and we shall be able to acquire the submarines along with the necessary technology to produce time in India. We can order few more scorpene if acquisitin delays. I hope that French submarine is selected so that we can utilize our experience to make it faster.
When will they be built
First submarine not before 2030 , that's the timeline ,in meantime we should upgrade our shipbuilding to churn out warships like china ,our time is after 2030When will they be built
Fking hell that's too long noFirst submarine not before 2030 , that's the timeline ,in meantime we should upgrade our shipbuilding to churn out warships like china ,our time is after 2030
It's p 75 alpha ,the nuclear one , that's p75 i you are talking about ,the deisel one
That's for furst ship if the design work will start today ,or next year .Fking hell that's too long no
Only the US has the capability to churn out Virginia class SSN every 3-4 years.That's for furst ship if the design work will start today ,or next year .
That's a standard timeline ,check for any other barracuda yasen ,vicotria any other
First ship yes , rest can be built fasterOnly the US has the capability to churn out Virginia class SSN every 3-4 years.
Rest of the P5 take on average 7-8 years to build a SSN and sometimes even 10 years
Actually current convention is alright. If else you would have an ego war if different regions will play ego based on the name of the warships given to which class.Guys, just a small thought . Wouldn't it be great to name these P-75A subs after our great kings, like Chatrapati Shivaji Maharaj, Raja Raja Chola, Sri Krishna Devaraya, Prithvi raj chauhan etc
When the next submarine be built nucltand when will aip be introduced in existing ones?First ship yes , rest can be built faster
Nucltand ??????When the next submarine be built nucltand when will aip be introduced in existing ones?