Ghost hale
New Member
- Joined
- Feb 13, 2021
- Messages
- 548
- Likes
- 1,701
Its 30 mins or free for IAF.What happened to tejas delivery??
Its 30 mins or free for IAF.What happened to tejas delivery??
Have the paid anything yet?.. Last I heard they owed them like ₹20k croresIts 30 mins or free for IAF.
Its 'Ghadi soap'. 'pehle istemal karien phir vishwas'.Have the paid anything yet?.. Last I heard they owed them like ₹20k crores
Agreed.Anyways I think this lot will come with Python-5 integrated, now that it's been cleared.
Not all our fighters possesses them . Rafale with Meteor Mica is the tip.This python and derby missile is positive development. Never again India will be caught in an f-16 shoot envelope when it downed an Indian MIG-21 fighter two years back after Balkote bombing. Although something is said that a F-16 was also shot down but the Pakistanis are cowards not to admit sacrifices of their brave pilot. With these two missiles, the Pakistani planes do not stand a chance. And if Su-30mk1 and Rafale join the fight, the whole of Pakistani airforce will be forced to vacate Sargodha and run to Peshawar or far away place.
What's the difference ?LCA vs LIFT..
View attachment 87259
one is the single seat aircraft(LCA- Light Combat Aircraft), the other is a combat aircraft derived from the 2 seat trainer (LIFT-Lead-In Fighter Trainer).What's the difference ?
HAL ke fanboys padh lo:Have the paid anything yet?.. Last I heard they owed them like ₹20k crores
Anyways I think this lot will come with Python-5 integrated, now that it's been cleared.
Elanorate this. The modified canopy design is different from what was conceived in aerodynamic study.LCA vs LIFT..
View attachment 87259
About time this has been pending for 10 years. Next payment on 2031 HAL remains their udhar-ka-stationary-shop (you people have those, right?)HAL ke fanboys padh lo:
HAL’s finances get a fillip as Indian armed forces clear dues; cash holdings now at Rs 7135 crore
As all the three wings of the Indian forces have cleared their dues to the Hindustan Aeronautics Limited, the organisation’s financial prospects have improvedwww.mynation.com
On topic, has HAL ever said that delay in payments are behind delays in delivery? Has HAL delivered a single aircraft order on time in their lifetime?
That LIFT model was made by me for rendering the Tejas-MAX, by superimposing a NLCA sketch on that above LCA.Elanorate this. The modified canopy design is different from what was conceived in aerodynamic study.
About time this has been pending for 10 years. Next payment on 2031 HAL remains their udhar-ka-stationary-shop (you people have those, right?)
No & Yes, most orders that are not held up by ADA's R&D... the helo delivery are often before time, before order even for LCH.
You're just salty another 2 squadrons of LIFT are to be ordered (He wants the pilot to crash & burn or have tea. Don't know why. Personal reasons probably).
That LIFT model was made by me for rendering the Tejas-MAX, by superimposing a NLCA sketch on that above LCA.
View attachment 87396
That is correct.. The LCA Tejas "modified fighter" is shaped for better area-ruling coef. & significantly lesser drag all over the flight envelope. I sincerely hope that the Mark1A rolls-out in this chubby cute fuselage.ok, it was trainer with two seats. Modified canopy design is different.
Seems dogfights are now piece of cake for LCA...
For your very first completely Indigenous project, it made sense to go with Single engine fighter first.I always wondered why they didn't choose twin engine version while designing Tejas with two small 45KN engines instead of a large 90KN engine.
It will be used for 1 year more for Su-30MKI only.A Point For HAL Nashik To Ponder: What After Sukhoi-30MKI Fighters?
Used to totting up over Rs 6,000 crore each year from the assembly of 15-16 Sukhoi-30MKIs, HAL's Nashik division is now scrabbling for order...www.indiandefensenews.in
More than 4K skilled workers would idle..Cant we use them for LCA tejas production.. Surprising..
Maintaining one 90kn engine is easier and cheaper than two 45kn engines.I always wondered why they didn't choose twin engine version while designing Tejas with two small 45KN engines instead of a large 90KN engine.
Again, I will repeat my question, has HAL ever claimed that the delay in delivery of LCA is because of delay in payments? Or are you making this stuff up?About time this has been pending for 10 years. Next payment on 2031 HAL remains their udhar-ka-stationary-shop (you people have those, right?)
Which Helo was ever delivered before time? Dhruv? Did you read the CAG report about it?No & Yes, most orders that are not held up by ADA's R&D... the helo delivery are often before time, before order even for LCH.
I am salty because not a single LCA has been delivered in last 2 years. And yet you fanboys have the nerve to defend HAL. This is called defending for personal reasons. Please continue defending the overpaid and underworked lazy morons of HAL.You're just salty another 2 squadrons of LIFT are to be ordered (He wants the pilot to crash & burn or have tea. Don't know why. Personal reasons probably).
suggestions?Again, I will repeat my question, has HAL ever claimed that the delay in delivery of LCA is because of delay in payments? Or are you making this stuff up?
Which Helo was ever delivered before time? Dhruv? Did you read the CAG report about it?
Padh lo
As for LCH, you are yourself telling how stupid HAL is. They want to deliver LCH without even orders. but won't deliver LCA which was ordered years ago. Because this is so intelligent behavior, isn't it? Do you also do this? When someone in your company asks you to work on a project, you delay it and instead deliver something else which was not even asked of you?
Also why doesn't the shortage of money argument comes for LCH? If HAL is so short of money that they can't deliver LCA ordered years ago, how were they able to deliver LCH which is not even ordered?
I am salty because not a single LCA has been delivered in last 2 years. And yet you fanboys have the nerve to defend HAL. This is called defending for personal reasons. Please continue defending the overpaid and underworked lazy morons of HAL.
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
LCA Tejas: Photos & Footages (no text other than headings) | Military Multimedia | 87 | ||
LCA TEJAS and what makes it stand out | Knowledge Repository | 8 | ||
W | Rise of LCA Tejas Multi Role Fighter Aircraft | Indian Air Force | 23 | |
C | LRUs or parts of LCA Tejas Made and designed in India | Indian Air Force | 16 |