Where did you get the information sir?The Reason the Kolkatas are delayed is because the bureaucrats who handled the contracting for the LR-SAM development forgot to add one small detail that the control suite of the SAM had to be compatible with the Central software architecture of the Kolkatas, its a software issue plain and simple the missiles and launchers themselves are ready only that the Kolkatas software cannot launch them or target them , so the entire software for the missile system is being reprogrammed. The system should be ready and integrated with the hulls by end 2015.
If the above is indeed the case, why the SAM hasn't been delivered to India and tested standalone at PXE/ ITR Balasore? As it is the norm with all imported systems.system.
That probably doesn't require control suit for integration with CSA.