Pretty evident based on specs mig-29 is the best choice as a standardised aircraft for India's Stobar carriers.
The question is how poor availability rates are currently, it's a pity the Russians involved in the whole Gorshkov package were such a bunch of idiots really.
For the 2 carriers ( Vikky and Vikrant) the navy needs 5-6 fighter squadrons, they have 2 (Plus crash reserves) currently
The Navy had the option of ordering another 45 MIG-29Ks to take the total strength to 90 (5 squadrons plus reserves) but rejected this idea and launched the MRCBF contest.
MRCBF never really went anywhere once the costs became apparent as well as the technical issues (lifts and hangers), again the Rafale-M is the most logical option but I’m genuinly curious how Dassualt proposed to fit on the lifts of IAC-1, I know Boeing offered an unusual solution (a unique jig structure to lean the jet so it could take up less of a footprint on the lifts).
Anyway, with the 29K not desired ( there are still VERY serious issues with that fleet and it is more than just low availability but fundamental flaws) and MRCBF not going anywhere it’s not surprising that TEDBF has become an imperative. Of course there are risks to this approach but at least it offers the navy the ability to begin with a clean sheet design and to spec that the TEDBF fits inside the footprint of the 29K
Mig29K with its
24ft wingspan in Vikramaditya's Lift -
View attachment 57063
Fitting either rafale (35ft) /Superhornet (33ft) into similar sized lifts is out of question.
Nailed it. After the IN selected the 29K
ironically it may have been better to have picked the SU33K (despite the inherent issues that would bring), at least that would’ve given the navy options now. Having their carriers designed around the HRCA would’ve made accommodating a western MMRCA simple.
the navy is now entirely dependent on the TEDBF to dig them out of the hole they have dug for themselves, the news of Boeing conducting a ski jump test for the SH are utterly utterly meaningless. Unless the navy wants to undertake *major* re-designing of their flagships involving 100s of millions and potentially years in a dry dock They have little choice but to make do with hallf the fighter strength they require spli across 2 carriers until TEDBF is ready