Ya'll Nibbiars
Mumbai coastal road project phase one update along with downtown skyline. 280 Acres of land reclaimed for this project and phase 1 started in late 2017 and expected to be completed by end of 2022.
And includes.
1 . A 2 km tunnel.
2 . 7 Km of Costal road from Malbar hill to Worli.
3 . 280 arces of reclaimed land.
4 . Public places and parks.
5 . Intergated transport area.
6 . Bus depot.
7 . 1 km Arch Bridge.
8 . 4 km of Costal road in bandra.
9 . Two four leaf interchanges.
10 . 3.2 km elevated road in worli.
11 . 1.9-km embankment between Baroda Palace.
12 . Sea Wall.
13 . 4 Km of elevated road at the Marine Drives.
Mumbai coastal road project phase one update along with downtown skyline. 280 Acres of land reclaimed for this project and phase 1 started in late 2017 and expected to be completed by end of 2022.
And includes.
1 . A 2 km tunnel.
2 . 7 Km of Costal road from Malbar hill to Worli.
3 . 280 arces of reclaimed land.
4 . Public places and parks.
5 . Intergated transport area.
6 . Bus depot.
7 . 1 km Arch Bridge.
8 . 4 km of Costal road in bandra.
9 . Two four leaf interchanges.
10 . 3.2 km elevated road in worli.
11 . 1.9-km embankment between Baroda Palace.
12 . Sea Wall.
13 . 4 Km of elevated road at the Marine Drives.