Zojila tunnel is progressing well. Scheduled to open in 2023. Being built by NHIDCL and contractor is Megha Engineering and Infrastructure
I would term it as logical instead of cautious.These are the current planned corridors for high speed rail in India.
The plan goes all the way to 2051.
South will get a line only in 2041.
It says we will build only 2 corridors in 2031 to 2041.
Is this too long/ cautious?
Or is this only a preliminary estimate subject to change with the speed at which Mumbai Ahmedabad corridor is completed?
View attachment 112546
By 2031 we are supposed to build two large corridors and one relatively smaller one.I would term it as logical instead of cautious.
Maybe they plan something else , we may try to increase speed of our traditional broad gaugeBy 2031 we are supposed to build two large corridors and one relatively smaller one.
Shouldn't we be able to build more than just 2 in 2031 - 2041?
expressway + dedicated freight corridor on one side alone costs one lakh crore + in the north.By 2031 we are supposed to build two large corridors and one relatively smaller one.
Shouldn't we be able to build more than just 2 in 2031 - 2041?
DFC is adding to your economy, whereas speed corridor would impact you adversely if not planned well.By 2031 we are supposed to build two large corridors and one relatively smaller one.
Shouldn't we be able to build more than just 2 in 2031 - 2041?