1 . All lines are color coded. For example Line 2A is Yellow line. You can see they painted continuous yellow color line below viaduct.

2 . They have installed lights under the stations. It gets very dark under the stations during night.

FAwZxeMVkAIayiq.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars World Trade Center , Nauroji Nagar, Delhi by NBCC. And but most of the offices spaces are already sold out to PSU/Govt offices. Hardly any remains for the private sectors.

FAt94PfWEAAOL6B.jpeg
FAt-EZHXEAYbUL8.jpeg
FAt-TYrXsAENqv0.jpeg
FAt-ko4WEAIi6-O.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Maharashtra Rail Infra. Develop. Corp. Ltd. (MRIDC) invites bids for construction of Cable Stayed ROB at Dadar Tilak Bridge in Mumbai. Est. Cost: Rs. 216.16 cr. Completion: 21 months.
 
  • Like
Reactions: SKC

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Gadkari lays foundation stone on 25 september 2021 for 6 laning of Kagal Satara section of Mumbai Bengaluru NH 48. Karad to get 3.4 kilometer flyover on NH 48. Portion affected by mega floods to be upgraded along with new flyovers.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Gadkari lays foundation stone on 25 spetember 2021 for the 4 laning of Ratnagiri Kolhapur NH 166. Nipani - Amboli Ghat - Banda highway to be upgraded to NH standards 2 lane paved shoulder.
 

jadoogar

Regular Member
Joined
Nov 1, 2016
Messages
238
Likes
458
Country flag
Ya'll Nibbiars Jewar airport terminal smaller than expected 60 million plus annual capacity. The design is sadly ugliest. The Zurich constraints has rejected the Yogis plea to increase the airport capacity due to the financial sound and will not includes the indic elements in the design as asked by the CM. Two runways initial. If required additional runways are provisioned.

Well the Zurich based constratium didn't gone with the Yogis plans. Apparently it looks like that.

View attachment 112754
Airports have to be designed for efficiency and ease of maintenance. People choose flights and airports based on cost. The Zurich airport design is the right one.

Look at European airports.. Zurich, Copenhagen, Munich etc etc. They are all designed for efficiency and they handle vast volumes of traffic.
 
  • Like
Reactions: SKC

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Airports have to be designed for efficiency and ease of maintenance. People choose flights and airports based on cost. The Zurich airport design is the right one.

Look at European airports.. Zurich, Copenhagen, Munich etc etc. They are all designed for efficiency and they handle vast volumes of traffic.
Ya'll Nibbiars but sad that such important airport of the state has such dull design. That the drawback of the L1 bidding. And the size is also smaller than expected than the IGI. The current airports are both efficient and extremely differenative. The Zurich is from a another era and now largely relic of the past. This is a outdated concept now altogether.
 
Last edited:

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Mumbai Trans Harbour Link Pkg 1 sewri-L&T For the longest period of time,the 2 girder launchers were assembled &kept idle in middle of sea ,good to see it at work now.The pipeline in the backgrnd are from BPCL refinery, Mahul. The project is currently ahead of its schedules.

FAxaXKYVIAg0GGF.jpeg
FAxaXKhVUAMnxfI.jpeg
FAxaXKeVUAAOnfX.jpeg
FAxaXKeVgAEUIs_.jpeg
 

SKC

Senior Member
Joined
Aug 16, 2014
Messages
3,405
Likes
10,957
Country flag
Ya'll Nibbiars Jewar airport terminal smaller than expected 60 million plus annual capacity. The design is sadly ugliest. The Zurich constraints has rejected the Yogis plea to increase the airport capacity due to the financial sound and will not includes the indic elements in the design as asked by the CM. Two runways initial. If required additional runways are provisioned.

Well the Zurich based constratium didn't gone with the Yogis plans. Apparently it looks like that.

View attachment 112754
Jewar airport will not suddenly reach the capacity they were planning initially immediately after opening.

Delhi still has two airports. You will not be able to replace it. You have to plan in stages and attract crowd there initially.
There is much more population living near and around IGI then around Jewar.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Jewar airport will not suddenly reach the capacity they were planning initially immediately after opening.

Delhi still has two airports. You will not be able to replace it. You have to plan in stages and attract crowd there initially.
There is much more population living near and around IGI then around Jewar.
Ya'll Nibbiars even after all the terminal get operational it will be smaller than the current IGI's capacity.
 

SKC

Senior Member
Joined
Aug 16, 2014
Messages
3,405
Likes
10,957
Country flag
Ya'll Nibbiars even after all the terminal get operational it will be smaller than the current IGI's capacity.
Ofcourse it will be. You have be practical about the feasibility of IGI level of tonnage and capacity just next to it.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ofcourse it will be. You have be practical about the feasibility of IGI level of tonnage and capacity just next to it.
Ya'll Nibbiars still disappointed by the design and capacity.
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Under construction Ramayampet Canal, part of the ambitious Kaleshwaram Lift Irrigation project in Telangana. Contractor: Power Mech Projects. @ezsasa Nibba, @Rxbanda Nibba.

FBAk7DFVEAglr26.jpeg
FBAk7DJVQAAJrN_.jpeg
FBAk7DHVcAAW02s.jpeg
FBAk7DJVQAE9e6_.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Newly laid tarmac on NPD in btw Purney and Padum in Zanskar, Ladakh. 290km NPD is the alternative axis being developed by BRO for Leh Manali connectivity, approx 100km is black topped and 12-15 70Class bridges spotted. 30-40km of the Alignment between Zangla and Chilling pending. @FalconSlayers Nibba.

FA8YIuLXsAcjl-1.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Mumbai Metro On the Go!! Early this morning, MMRDA finally installed the last I-Girder for Mumbai Metro Line 2A at Adarsh Nagar. With this feat, MMRDA can now install tracks and OHE all the way between Dahanukarwadi and Andheri.

FA_Na5QVkBgCcM3.jpeg
FA_NbXKVQAcariH.jpeg
 

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
21,956
Likes
75,655
Country flag
Ya'll Nibbiars Pune Metro Rail cars arrives at the JNPT.

FBA4QI8UYAAT8CX.jpeg
 

doreamon

Senior Member
Joined
Mar 24, 2019
Messages
3,007
Likes
15,129
Country flag
Ya'll Nibbiars Under construction Ramayampet Canal, part of the ambitious Kaleshwaram Lift Irrigation project in Telangana. Contractor: Power Mech Projects. @ezsasa Nibba, @Rxbanda Nibba.

View attachment 113443View attachment 113444View attachment 113445View attachment 113446
These canals shd be covered with solar panels like gujurat . No land acquisition problem , cooling effect on panels , reducing evaporation and water availability to clean panels at the source .
Kaleswaram project ll consume 7 gigawat of electricity to lift water to upward slope . Shd be recovered as much as possible in course of time .
 