L and t itself gives it out to small contractors.constructed by L&T.
But yes this is absolutely L & Ts fault.
L and t itself gives it out to small contractors.constructed by L&T.
The planning, designing and construction was complete responsibility of the Delhi govt for this project.During inauguration, Modi took all the credit and his ministers even claimed that the entire project was funded by Central govt.
Pragati Maidan tunnel: Delhi govt refused its share of funds, Centre borne entire cost
Union Minister Piyush Goyal made these remarks at the inauguration ceremony of Delhi's first road tunnel underneath Pragati Maidan and five underpasses on Mathura Road and Bhairon Marg inaugurated by Prime Minister Narendra Modi on Sunday morning.www.indiatvnews.com
So, now it's time to face the heat. Cannot blame khujliwal now.
Other than this, I agree with your points.
Local contractors? This tunnel was constructed by L&T.
Here's inspection by Mr Handsome:The planning, designing and construction was complete responsibility of the Delhi govt for this project.
However, they chickened out for the funding and center had to pitch in and give 100% funding. That is the reason the inauguration was done by PM himself.
During construction several time, it was Delhi Govt ministers who used to check the progress and post their pics on twitter and not the Central ministers.
Well at the end of the day we are still living in India and not in US and EU, this problem will keep on coming and go! no matter how much we talk and cry about it.
Arora said these seven projects will consume over 2.72 lakh tonne of paddy straw ..
Apart from this, four CBG projects of total capacity over 85 TPD have already been commissioned for which around 1.70 lakh tonne paddy straw was collected.
So the MH govt will build bullet train networks in the state on its ownYa'll Nibbiars The Jalna Nanded High Speed Rail Corridor, 189 K.M longSpeed 250 K.M +. Covering distances in just 1 hour. Most of you will not believe this but it's real. The Maha Rail has but it in their masterplan along with the Shaktipeeth, Nashik Pune and now this.
The Maharashtra HSR systems also asking shape like the Maharashtra Express Sytems.
And it's part of the Maha HSR system no correlation to the NHSRCL timelines.
It's part of Maha HSR system not from the NHSRCL. So the timeline are going to be different. First the Nashik Pune HSR, then Samruddhi HSR and ofcourse followed by the Shaktipeeth and then this one. The cost is also significantly going to be extremely less compared to the MAHSR.
View attachment 240406
View attachment 240408
As you said technically there are no hurdles. If India wants to build Nuclear power plants every country apart from China in the NSG group will supply whatever we ask for. Nuclear industry in the West is declining. And western players will fight tooth and nail with their politicians to remove any roadblocks when it comes to Nuclear trade with India just to keep themselves in the business. The bigger problem is not protestors or liability on part of manufacturers when something goes wrong.And if you remember, the way government handled it was fantastic. After showing some patience, the government arrested 2 French and 3 German "activists" along with some gora missionaries, deported them and banned them from entering India while lathi-charging all the protesters.
I was talking about indigenous reactors. Our indigenous ones were activated in Kakrapar about a month ago. We are also at an advanced stage of negotiating more nuclear plants from Russia, which remains the oldest player in our market.
Kazakhstan, Namibia, Russia, and Australia are our principal uranium suppliers. India even has mining rights in Namibia.
Ya'll Nibbiars The Indian Railways commences feasibility study for three High Speed Rail corridors.Ya'll Nibbiars The Jalna Nanded High Speed Rail Corridor, 189 K.M longSpeed 250 K.M +. Covering distances in just 1 hour. Most of you will not believe this but it's real. The Maha Rail has but it in their masterplan along with the Shaktipeeth, Nashik Pune and now this.
The Maharashtra HSR systems also asking shape like the Maharashtra Express Sytems.
And it's part of the Maha HSR system no correlation to the NHSRCL timelines.
It's part of Maha HSR system not from the NHSRCL. So the timeline are going to be different. First the Nashik Pune HSR, then Samruddhi HSR and ofcourse followed by the Shaktipeeth and then this one. The cost is also significantly going to be extremely less compared to the MAHSR.
View attachment 240406
View attachment 240408
Ya'll Nibbiars The Central owns 50 percent stake in the Maha Rail so not fully true. But the Maharashtra Government will have more control in the planned routes. Even in the NHRSCl routes the respective states have almost equal stakes. But limited controls.So the MH govt will build bullet train networks in the state on its own
I hoped there would be completely different agency for HSR network completely devoid of any railway influences whatsoever not even railway babus on deputation must be allowed ,in doing so new hsr agency would be freed from all bad practices and work culture (and all those British era rules and shit) but babus influence is too great for things to go smooth.Ya'll Nibbiars The Indian Railways commences feasibility study for three High Speed Rail corridors.
1 . Mumbai - Chennai. Via Kolhapur, Hubli, Bengaluru.
2 . Delhi - Kolkata. Via Agra, Kanpur, Varanasai.
3 . Delhi - Mumbai. Via Ahmedabad, Jaipur.
With this can say the Mysuru Chennai HSR is almost dead.
Indian Railways commences feasibility study for three High-Speed Rail Corridors | Metro Rail Today
New Delhi, India (Metro Rail Today): In a significant development, Railway Minister Ashwini Vaishnaw…metrorailtoday.com
Indian Railways Paves the Way for High-Speed Rail Corridors: Unveiling a Transformed Transportation Landscape
Discover the future of Indian Railways with high-speed rail corridors on major routes, reducing travel times and revolutionizing transportation infrastructure.bnnbreaking.com
Ya'll Nibbiars The Central owns 50 percent stake in the Maha Rail so not fully true. But the Maharashtra Government will have more control in the planned routes. Even in the NHRSCl routes the respective states have almost equal stakes. But limited controls.
There will he no escape from babus don't worry.I hoped there would be completely different agency for HSR network completely devoid of any railway influences whatsoever not even railway babus on deputation must be allowed ,in doing so new hsr agency would be freed from all bad practices and work culture (and all those British era rules and shit) but babus influence is too great for things to go smooth.
Valid point but my point was more comprenshive.There will he no escape from babus don't worry.
40% General, 10% EWS, 20% OBC 15% Ch@m@r and 15 Tribes will also get there due share.
All gormint institutions are bound by constitution to provide reservations (Thanks BabaSaheb the most learned)
This L&T was also awarded some water-structure like thing in telangana. Its now is about to collapse less than a decade. Probably sub-contracted to another shit company. If L&T gonna continue doing this, they gonna lose their credibility super quick. After all 100 years of credibility can be gone in 10 minutes. Maybe too much order book made it super complacent. We need competition here challenging L&T. But everyone in construction sector seems a haramkor maggots except 3-4 companies like L&T.L and t itself gives it out to small contractors.
But yes this is absolutely L & Ts fault.
I remember these profit-maxxers also subcontracted some of the pieces of the Sardar Patel statue to a Chinese companyThis L&T was also awarded some water-structure like thing in telangana. Its now is about to collapse less than a decade. Probably sub-contracted to another shit company. If L&T gonna continue doing this, they gonna lose their credibility super quick. After all 100 years of credibility can be gone in 10 minutes. Maybe too much order book made it super complacent. We need competition here challenging L&T. But everyone in construction sector seems a haramkor maggots except 3-4 companies like L&T.
This is how it works but L&T would need to take responsibility regardless.I remember these profit-maxxers also subcontracted some of the pieces of the Sardar Patel statue to a Chinese company
I guess this is what the commies call late stage capitalism, you are an engineering and construction company and even this you have to outsource?