AMCA - Advanced Medium Combat Aircraft (HAL)

Ajax01

New Member
Joined
Feb 29, 2020
Messages
360
Likes
1,183
Country flag
Some research into Radar Absorbing Strcuture/Materials.
ACR Pillai's Work: (People might remember the work featured in Defence Science Journal the CJA radar absorber ones)
Harish Barshilia's Work: (Chief Scientist of Surface Engineering Group ,NAL. Lots of work most not on absorbers).
Kumar Vaibhav Srivastava: (IIT guy loads of work on absorbers many of the people he works with (Indians) also used to work in Korean Universities on absorbers)
 

FalconSlayers

धर्मो रक्षति रक्षितः
New Member
Joined
Oct 14, 2020
Messages
28,260
Likes
195,943
Country flag

Lonewolf

Psychopathic Neighbour
New Member
Joined
Jan 26, 2021
Messages
7,365
Likes
27,771
Country flag

FalconSlayers

धर्मो रक्षति रक्षितः
New Member
Joined
Oct 14, 2020
Messages
28,260
Likes
195,943
Country flag
Testing issues , sidebays have ccm , which in turn are launched in high g , high speed manuver , this require long testing period , airframe changes , so ditched for mk 1 , mk 2 for sure
What are the advantages od GaN based aesa radar on GaAs based radar?
 

Lonewolf

Psychopathic Neighbour
New Member
Joined
Jan 26, 2021
Messages
7,365
Likes
27,771
Country flag
AMCA will e inducted by 2034, how much wait?
Usage of CATS warrior will eliminate need for sidebays.
Cats warrior will be there so do , wingman of enemy , you will definitely need ccm ,hope we go for something like cuda and aim 260 after astra saga is completed by 2025 .

Timeline for mk 1 is not 2034 , who told you 2034 ? , And what drdo is doing is developing basic capability first , making a f 35 first , then go for advanced one , like more missile in weapons bay , if you look closely at 4 missile layout , there is space for staggered 3missile , somewhat above two in it , if we can notice it ,drdo can too ,also launching mechanism and launcher size need reduction , they are going with available tech , when advanced one are available will integrate it .

Patience for more advanced project to come in limelight and present one to get completed .
 

FalconSlayers

धर्मो रक्षति रक्षितः
New Member
Joined
Oct 14, 2020
Messages
28,260
Likes
195,943
Country flag
Cats warrior will be there so do , wingman of enemy , you will definitely need ccm ,hope we go for something like cuda and aim 260 after astra saga is completed by 2025 .

Timeline for mk 1 is not 2034 , who told you 2034 ? , And what drdo is doing is developing basic capability first , making a f 35 first , then go for advanced one , like more missile in weapons bay , if you look closely at 4 missile layout , there is space for staggered 3missile , somewhat above two in it , if we can notice it ,drdo can too ,also launching mechanism and launcher size need reduction , they are going with available tech , when advanced one are available will integrate it .

Patience for more advanced project to come in limelight and present one to get completed .
Production will start in 2031, first aircraft will be delivered in 3 years as everyaircraft takes atleast 3 years to start getting rolled out since the placement of order, Hence by 2034 it will be inducted.
 

Lonewolf

Psychopathic Neighbour
New Member
Joined
Jan 26, 2021
Messages
7,365
Likes
27,771
Country flag
Cats warrior will be there so do , wingman of enemy , you will definitely need ccm ,hope we go for something like cuda and aim 260 after astra saga is completed by 2025 .

Timeline for mk 1 is not 2034 , who told you 2034 ? , And what drdo is doing is developing basic capability first , making a f 35 first , then go for advanced one , like more missile in weapons bay , if you look closely at 4 missile layout , there is space for staggered 3missile , somewhat above two in it , if we can notice it ,drdo can too ,also launching mechanism and launcher size need reduction , they are going with available tech , when advanced one are available will integrate it .

Patience for more advanced project to come in limelight and present one to get completed .
Also to add , older ccm are going to be complemented by smaller cuda like missile for smaller range and almost half the length
 

FalconSlayers

धर्मो रक्षति रक्षितः
New Member
Joined
Oct 14, 2020
Messages
28,260
Likes
195,943
Country flag
Also to add , older ccm are going to be complemented by smaller cuda like missile for smaller range and almost half the length
AMCA will be able to carry fuel tanks in its internal bays, whic can be jettisoned too. So it can easily fit CATS Hunters.
 

Lonewolf

Psychopathic Neighbour
New Member
Joined
Jan 26, 2021
Messages
7,365
Likes
27,771
Country flag
Production will start in 2031, first aircraft will be delivered in 3 years as everyaircraft takes atleast 3 years to start getting rolled out since the placement of order, Hence by 2034 it will be inducted.
3 years ,36 months for production ,too long , we are not doing f 35 saga ,nor j20 saga , it's different.

China delivered first production aircraft in 2015 , lrip one , even though they were bit unclear on it's problem and aspect , like ws 15 ,etc .

We are clear from start , we want a flying bird with given parameters to be achieved in mk 1 , and full exploitation of capability in mk 2 , no mumbo jumbo claims , no too weapons claim , only what is possible , also we are testing prototype , when china developed f 35 ,it was over ambitious on operational paramters like inter operability and all.

Koreans too took a intelligent route , we are more advanced and confident took some more risk but better aircraft overall
 
Last edited:

Articles

Top