kamaal
New Member
- Joined
- Jul 9, 2016
- Messages
- 521
- Likes
- 1,985
Rather in Afghan colours.I have a dream that one day we will see Tejas soaring over the skies of Afghanistan
:biggrin2:
#BaniyeKaDimaag
Rather in Afghan colours.I have a dream that one day we will see Tejas soaring over the skies of Afghanistan
:biggrin2:
Rather in Afghan colours.
#BaniyeKaDimaag
We need people like him to balance the western lobbying.When Bharat Karnad comes on TV, i just simply change the channel. Simply because of the fact that despite being a 'Soviet-agent', he hasn't done anything to turn around such potential relationships as Russia & India. He survives through his analysis and blogs which some people read and blabber about.
"The sixth one is expected to fly in the next three days and the seventh in about 10 days.Private companies to carry out 70% of production work for Light Combat Aircraft Tejas
BENGALURU: In a move that will help meet delivery deadlines, defence PSU Hindustan Aeronautics Limited (HAL) has decided to outsource majority of the production work of Light Combat Aircraft (LCA) Tejas. The move will see private firms make nearly 70% of the aircraft.
Presently, HAL is manufacturing LCA Mk1 and is a working on the ramping up of production capacity from eight to 16 aircraft per annum, which it expects to happen by 2019.
"Major sub-assemblies such as front fuselage, centre fuselage, rear fuselage, wings et al, have been outsourced to private industry. The orders have been placed and they need about an year to supply these. Soon, nearly 70% will be made by our industry," a senior official part of the LCA project told TOI.
About 85 vendors (private firms) will be involved in the production of LCA. Some major players are: Dynamatic Technologies Ltd, Bengaluru (front fuselage); VEM Technologies, Hyderabad (centre fuselage); Alpha Tocol, Bengaluru (rear fuselage); L&T, Coimbatore (wings); while the tail fin and rudder will be supplied by National Aerospace Laboratory and Tata Advanced Materials Ltd.
"With increased level of outsourcing and capacity within HAL, we will be able to speed up the deliveries to cater to the present and future requirements of our customers.Enhanced outsourcing is the norm being followed across some important projects at HAL. For example LCH production will involve outsourcing as a major strategy," another senior HAL official said.
HAL has established a second line series production of Tejas, which has come up at Aircraft Division and is being equipped with full-fledged assembly jigs. HAL's plan for expanding Tejas production to 16 fighters per year involves establishing a second assembly line. This has physically replaced the Hawk trainer line.
5 delivered, 6th Tejas soon
The number 45 squadron (Flying Daggers) of the Indian Air Force (IAF) has already taken possession of five LCA Tejas aircraft and will soon have the sixth one. "The sixth one is expected to fly in the next three days and the seventh in about 10 days. By end of March 2018, we hope to deliver 11 planes (including the five delivered)," the official said.
For the first time, the IAF squadron completed the armament detachment—weapons firing—in September and October this year. "That was the proof of the pudding. It was not a developmental test, the squadron that will fly and fight has completed the detachment, and we were glad that it was successful," an IAF source said.
The Flying Daggers Squadron is presently operating from HAL in Bengaluru, but will eventually move to its official base in Sulur, Tamil Nadu.
Tejas, which was first conceived in the early 1980s and officially approved in August 1983, is an indigenous fighter that has undergone several changes before being accepted by the IAF in January 2015. While the first 40 aircraft will be supplied in the present configuration, the IAF has sought more improvements for future ones.
https://timesofindia.indiatimes.com...ction-work-for-tejas/articleshow/61363473.cms
I thought they had started work on increasing production to 32 per year.
I rechecked the news reports. The plan is to increase till 24 if private sector starts delivering.Production rate was never mentioned 32 but 25.
Please provide source for your claim ..
SP-5 is from the new line. It had a couple of problems in the ground runs. It has been fixed. It has reached the flight line.Sp5 is taking too long now.
If SP5 and SP7 fly in next fortnight, that leaves 4 more in 4 months. Is that feasible given that time elapsed between SP6 & SP7 flights is more than 4 months & we can hope for maximum one more from the other assembly line?By end of March 2018, we hope to deliver 11 planes (including the five delivered)," the official said.
Maybe difficult, but we should be happy even if they deliver SP10 by March-18.If SP5 and SP7 fly in next fortnight, that leaves 4 more in 4 months. Is that feasible given that time elapsed between SP6 & SP7 flights is more than 4 months & we can hope for maximum one more from the other assembly line?
Work is going on in FULL swing.. just see how many test flights HAL/ADA is conducting.bro any info ...on the foc development s. no news long time .. @tejas warrior
Which RADAR integration LSP3 4 and 5 is going through?Work is going on in FULL swing.. just see how many test flights HAL/ADA is conducting.
Don't worry about FOC, it will be achieved.. a couple of month here and there doesn't matter.
LSP7 - Gun Integration
LSP8 - Mid Air Refueling probe
LSP3, LSP4 & LSP5 - Radar+Weapon integration
View attachment 21357 View attachment 21358
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
AERO INDIA 2021 | Science and Technology | 308 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Knowledge Repository | 6 | ||
ADA Tejas Mark-II/Medium Weight Fighter | Indian Air Force | 8939 | ||
P | ADA DRDO and HAL Delays a threat to National Security | Internal Security | 20 |