Sukhoi PAK FA

IndianHawk

New Member
Joined
Sep 24, 2016
Messages
9,058
Likes
37,675
Country flag
What happened to idz 30 engine. When will it be ready?

Sent from my C103 using Tapatalk
 

bhramos

New Member
Joined
Mar 21, 2009
Messages
25,644
Likes
37,250
Country flag
Are you confusing idz 30 with Saturn 117?

Sent from my C103 using Tapatalk
Difference between Satum 117 & Item 30


testing year ago..................................


now they will go for serial production
 

IndianHawk

New Member
Joined
Sep 24, 2016
Messages
9,058
Likes
37,675
Country flag
Difference between Satum 117 & Item 30


testing year ago..................................


now they will go for serial production
That just created more confusion. Anyway what are the specs for idz30. What thrust has it achieved.

Sent from my C103 using Tapatalk
 

bhramos

New Member
Joined
Mar 21, 2009
Messages
25,644
Likes
37,250
Country flag
The first serial Su-57 will enter the VKS until November of this year. In the first installation batch there will be two fighters

 

bhramos

New Member
Joined
Mar 21, 2009
Messages
25,644
Likes
37,250
Country flag
“A new contract for the serial delivery of the Su-57 for Ministry of Defense of Russian Federation is planned to be signed later this year,” said the agency source. According to him, the number of fighters that Russian military department plans to order is still under discussion.

 

bhramos

New Member
Joined
Mar 21, 2009
Messages
25,644
Likes
37,250
Country flag
That just created more confusion. Anyway what are the specs for idz30. What thrust has it achieved.

Sent from my C103 using Tapatalk
Izdeliye-30
Under normal circumstances, the necessary PAK FA engine should have been designed before starting work on the aircraft airframe. But after the collapse of the Soviet Union, the Russian defense industry was in a state of chaos and there was no possibility of starting work on creating the appropriate engine for the new aircraft in advance, that is, in the 1990s. In many ways, this was a lost decade for the Russian defense industry.

The engine on the T-50 is fundamentally better than its predecessor. It has the elements of the fifth generation. A new turbine has been used, thanks to which the flow characteristics have been improved. They may not be entirely optimal, but nevertheless will implement all the specifiedrequirements with a margin, with significantly increased engine thrust. It has a fundamentally different management system - it is digital. The engine of the second stage for the Su-57 fighter (“product 30”) was developed at the Lyulki Design Bureau under the direction of Evgeny Marchukov and in collaboration with other large Russian engine-building companies. Salyut developed a high-pressure compressor, a combustion chamber, and an “product 30” engine nozzle with thrust vector control. The engine will be produced at PJSC ODK-UMPO (now the AL-41F1S engine or “product 117C” is produced there for the Su-35C fighter). According to the manufacturer, the gas generator "products 30" has a compression ratio of 6.7, air consumption is 21-23 kg / s. The gas temperature before the turbine reaches 1950-2100 degrees Kelvin. The maximum thrust is 17-18 tons, which is more than 15 tons for the engine of the "first stage" AL-41F1.

The experimental design bureau named after Lyulka produced the first launch of the “product 30” - the engine of the second stage for the promising Russian T-50 fighter (PAK FA). The tests took place on November 11, 2016, but it became known only later. The first launch was considered successful. Other details about the tests are not yet known. Currently, T-50 prototypes were flying with modified high-temperature turbojet bypass engines with an afterburner AL-41F1 (“product 171”). These installations were created on the basis of the AL-41F1S ("product 117C") for the Su-35S fighter. Otherwise, the AL-41F1 is called the engine of the first stage, since such installations will be mounted on the first production T-50 fighter jets.

The engine of the “second stage” in terms of fuel efficiency and specific gravity will significantly exceed the “product 117”, and in terms of design and technological performance and the level of parameters achieved, it will fully correspond to the world level of the fifth generation engine. The engine of the second stage, presumably, will be able to develop thrust of 107 kilonewtons in cruise mode and 176 kilonewtons in boost mode.

The development of the engine of the second stage - “product 30” - includes a number of research works (R & D):

  • R & D "129" - low pressure compressor (LPC), 3 stages.
  • R & D "133" - gas generator - 5th high pressure compressor + combustion chamber + 1 high pressure turbine.
  • Low pressure turbine, one stage, without a specific number.
  • Research "135"
  • R & D "137"


VIAM, CIAM, NIAT participated in the development and organization of mass production of the new engine. Each of the institutions had the necessary funding, scientific and technical base, trained personnel and plans, thought out to the smallest detail. Some created materials, others developed technological processes for mass production. A huge contribution was made by VVIA imeni Zhukovsky. It was at one of the departments of the Academy that research was carried out related to the special coating of engine blades.

The concept envisages the development of an engine for ultrahigh (according to current ideas) parameters while concentrating efforts on design, design, materials science solutions. This approach in today's conditions is difficult to implement because of the huge financial costs of creating such an engine in the required timeframe (over a billion dollars). This concept has the following counterarguments: if Russia does not reach this high level in the next 10 years, it will forever lag behind the world's leading manufacturers.

These concepts will be implemented in the design of the engine of the 5th generation. In the direction of the development of design solutions and the appearance of a new 5th generation aircraft engineSalyut works together with CIAM, TsAGI, VIAM, VILS and other leading organizations of the aviation industry. For the engine of a new generation, a number of new nodes for the Russian equipment is offered, as well as solutions applied in modernized and modified versions. For example, it is expected to obtain close to the stoichiometric parameters of the engine operating cycle through the use of the development of an efficiently cooled turbine working blade, jointly with CIAM. Electrician, conducting these works with the participation of the firm "Allison". This domestic development will allow to reach the level of gas temperatures before the turbine 2000 - 2100K. Two original technologies developed by VIAM are used to create cooling channels in the two-layer walls of the pen and the shelf of the blade.

On July 14, 2015, the UEC reported that under the program for creating the second stage engine for the PAK FA, the technical design of the engine was formed, and the production of engine components for the demonstrator engine and the gas generator was started. According to the developers, the number of parts in the high-pressure compressor (HPC) of the “product 30” was almost halved compared to the compressor of the engine of the previous stage, while providing a significant increase in work by one step. The cost of manufacturing such a compressor will not exceed the cost of manufacturing the ARC engine of the AL-41F1, subject to the use of new materials and technologies. In the new engine for the T-50 used composite materials, which are built not only on the polymer matrix for the cold part, but also parts created from high-temperature compositions.

The engine of the second stage will receive a compressor with increased air flow, a new combustion chamber, all-view thrust vector control, nozzles with reverse thrust and a digital control system, which will increase the engine power.

The prospective power plant will differ from the AL-41F1 by increased fuel efficiency and lower life cycle cost. The AL-41F1 engines are capable of thrusting at 86.3 kilonewtons and up to 147 kilonewtons in boost mode. The power plant is equipped with a plasma ignition system and all-direction vector thrust control. In 2017 tests of demonstrators of the “product 30” technologies will begin on an airplane - a flying laboratory. It is also expected that in 2018, developers will begin to test the prototype of the new power plant, and from 2023-2025 they will begin to install "products 30" on the T-50.

Russia is still testing the Su-57's new Izdelie-30 [Article 30] engine, which means it is still flying on the Su-35's AL-41F1 engine, and cannot be considered a fifth-generation aircraft yet. The engine will not be ready until 2025, and the Su-57 will not be ready for serial production until 2027. One of major obstacles widely reported to have held the T-50 back from production in the past was the absence of a true fifth-generation engine for the aircraft, with prototypes of the aircraft using a derivative of the AL-41F1 engine, similar to the one used in the Sukhoi Su-35S 4++ generation multirole fighter.

But by 2017, Russian designers were on the brink of reaching a breakthrough on a totally new, truly fifth-gen engine, known as Izdeliye 30 (Product 30), a design which Russian experts claimed had no equivalents in the world of engine construction. United Engine Corporation (UEC), Russias sole aero-engine manufacturer, has confirmed that the proposed "second stage" engine for the Su-57 stealth fighter jet will have a super-cruise feature which will form a part of the aircraft's stealth functionality. Super-cruise is a key requirement for a stealth aircraft. Delay in its development is being cited as one of the main reasons for India reportedly halting its participation in the Fifth Generation Fighter Aircraft (FGFA) project.

Super-cruise means an ability to cruise at supersonic speed without after-burners which translates into a lower heat signature besides enormous fuel savings. The second stage engine, internally known as Izdelie-30, marked its first test flight in December 2017 on board a Su-57 fighter jet and further developments are going on. The Russian Air Force plans to purchase a dozen Su-57s fitted with the AL-41F1 engines in 2019, and over the next eight years will continue to purchase small numbers of these planes for testing.

The engine of the “first stage” for fighter generation 4 ++ Su-35BM, adopted by the Russian Air Force (now VKS) under the designation Su-35S, with a thrust of 14,000 kgf at full boost (14,500 in emergency mode) [11] [12] . Created on the basis of the AL-31F, AL-31FP and AL-41F engines. Despite the scheme similar to the AL-31F, the engine consists of 80% of new parts [13] . It is distinguished from its predecessors by increased thrust (14,000 [14] kgf versus 12,500 for the AL-31F), a fully digital control system, a plasma ignition system, a new compressor of a larger diameter, a significantly increased resource (4,000 hours against 1,000 for the AL-31F) and improved consumables characteristics [13]. The box of units is located on top of the engine. The cost of development amounted to 3 billion rubles.

Developed from scratch over the course of almost a decade at the Saturn Tool-Making Plant in Rybinsk, central Russia, Izdeliye 30 features improved thrust characteristics (19,000 kgf vs. 15,000 kgf in the AL-41F1), better fuel efficiency, fewer moving parts, and subsequently improved reliability and lower maintenance costs.

The plane's three dimensional thrust vector jets, a design which the US does not have. The F-22 Raptor, for example, uses two-dimensional vector thrust jets, affecting only its pitch, for maneuverability. The F-35 Lightning II lacks the capability altogether, except for its vertical take-off and landing functions. No information is available regarding China's J-20 stealth fighter.

https://www.globalsecurity.org/military/world/russia/izdeliye-30.htm
 

Arihant Roy

New Member
Joined
Jan 25, 2018
Messages
1,515
Likes
12,744
Country flag
Izdeliye-30
Under normal circumstances, the necessary PAK FA engine should have been designed before starting work on the aircraft airframe. But after the collapse of the Soviet Union, the Russian defense industry was in a state of chaos and there was no possibility of starting work on creating the appropriate engine for the new aircraft in advance, that is, in the 1990s. In many ways, this was a lost decade for the Russian defense industry.

The engine on the T-50 is fundamentally better than its predecessor. It has the elements of the fifth generation. A new turbine has been used, thanks to which the flow characteristics have been improved. They may not be entirely optimal, but nevertheless will implement all the specifiedrequirements with a margin, with significantly increased engine thrust. It has a fundamentally different management system - it is digital. The engine of the second stage for the Su-57 fighter (“product 30”) was developed at the Lyulki Design Bureau under the direction of Evgeny Marchukov and in collaboration with other large Russian engine-building companies. Salyut developed a high-pressure compressor, a combustion chamber, and an “product 30” engine nozzle with thrust vector control. The engine will be produced at PJSC ODK-UMPO (now the AL-41F1S engine or “product 117C” is produced there for the Su-35C fighter). According to the manufacturer, the gas generator "products 30" has a compression ratio of 6.7, air consumption is 21-23 kg / s. The gas temperature before the turbine reaches 1950-2100 degrees Kelvin. The maximum thrust is 17-18 tons, which is more than 15 tons for the engine of the "first stage" AL-41F1.

The experimental design bureau named after Lyulka produced the first launch of the “product 30” - the engine of the second stage for the promising Russian T-50 fighter (PAK FA). The tests took place on November 11, 2016, but it became known only later. The first launch was considered successful. Other details about the tests are not yet known. Currently, T-50 prototypes were flying with modified high-temperature turbojet bypass engines with an afterburner AL-41F1 (“product 171”). These installations were created on the basis of the AL-41F1S ("product 117C") for the Su-35S fighter. Otherwise, the AL-41F1 is called the engine of the first stage, since such installations will be mounted on the first production T-50 fighter jets.

The engine of the “second stage” in terms of fuel efficiency and specific gravity will significantly exceed the “product 117”, and in terms of design and technological performance and the level of parameters achieved, it will fully correspond to the world level of the fifth generation engine. The engine of the second stage, presumably, will be able to develop thrust of 107 kilonewtons in cruise mode and 176 kilonewtons in boost mode.

The development of the engine of the second stage - “product 30” - includes a number of research works (R & D):

  • R & D "129" - low pressure compressor (LPC), 3 stages.
  • R & D "133" - gas generator - 5th high pressure compressor + combustion chamber + 1 high pressure turbine.
  • Low pressure turbine, one stage, without a specific number.
  • Research "135"
  • R & D "137"


VIAM, CIAM, NIAT participated in the development and organization of mass production of the new engine. Each of the institutions had the necessary funding, scientific and technical base, trained personnel and plans, thought out to the smallest detail. Some created materials, others developed technological processes for mass production. A huge contribution was made by VVIA imeni Zhukovsky. It was at one of the departments of the Academy that research was carried out related to the special coating of engine blades.

The concept envisages the development of an engine for ultrahigh (according to current ideas) parameters while concentrating efforts on design, design, materials science solutions. This approach in today's conditions is difficult to implement because of the huge financial costs of creating such an engine in the required timeframe (over a billion dollars). This concept has the following counterarguments: if Russia does not reach this high level in the next 10 years, it will forever lag behind the world's leading manufacturers.

These concepts will be implemented in the design of the engine of the 5th generation. In the direction of the development of design solutions and the appearance of a new 5th generation aircraft engineSalyut works together with CIAM, TsAGI, VIAM, VILS and other leading organizations of the aviation industry. For the engine of a new generation, a number of new nodes for the Russian equipment is offered, as well as solutions applied in modernized and modified versions. For example, it is expected to obtain close to the stoichiometric parameters of the engine operating cycle through the use of the development of an efficiently cooled turbine working blade, jointly with CIAM. Electrician, conducting these works with the participation of the firm "Allison". This domestic development will allow to reach the level of gas temperatures before the turbine 2000 - 2100K. Two original technologies developed by VIAM are used to create cooling channels in the two-layer walls of the pen and the shelf of the blade.

On July 14, 2015, the UEC reported that under the program for creating the second stage engine for the PAK FA, the technical design of the engine was formed, and the production of engine components for the demonstrator engine and the gas generator was started. According to the developers, the number of parts in the high-pressure compressor (HPC) of the “product 30” was almost halved compared to the compressor of the engine of the previous stage, while providing a significant increase in work by one step. The cost of manufacturing such a compressor will not exceed the cost of manufacturing the ARC engine of the AL-41F1, subject to the use of new materials and technologies. In the new engine for the T-50 used composite materials, which are built not only on the polymer matrix for the cold part, but also parts created from high-temperature compositions.

The engine of the second stage will receive a compressor with increased air flow, a new combustion chamber, all-view thrust vector control, nozzles with reverse thrust and a digital control system, which will increase the engine power.

The prospective power plant will differ from the AL-41F1 by increased fuel efficiency and lower life cycle cost. The AL-41F1 engines are capable of thrusting at 86.3 kilonewtons and up to 147 kilonewtons in boost mode. The power plant is equipped with a plasma ignition system and all-direction vector thrust control. In 2017 tests of demonstrators of the “product 30” technologies will begin on an airplane - a flying laboratory. It is also expected that in 2018, developers will begin to test the prototype of the new power plant, and from 2023-2025 they will begin to install "products 30" on the T-50.

Russia is still testing the Su-57's new Izdelie-30 [Article 30] engine, which means it is still flying on the Su-35's AL-41F1 engine, and cannot be considered a fifth-generation aircraft yet. The engine will not be ready until 2025, and the Su-57 will not be ready for serial production until 2027. One of major obstacles widely reported to have held the T-50 back from production in the past was the absence of a true fifth-generation engine for the aircraft, with prototypes of the aircraft using a derivative of the AL-41F1 engine, similar to the one used in the Sukhoi Su-35S 4++ generation multirole fighter.

But by 2017, Russian designers were on the brink of reaching a breakthrough on a totally new, truly fifth-gen engine, known as Izdeliye 30 (Product 30), a design which Russian experts claimed had no equivalents in the world of engine construction. United Engine Corporation (UEC), Russias sole aero-engine manufacturer, has confirmed that the proposed "second stage" engine for the Su-57 stealth fighter jet will have a super-cruise feature which will form a part of the aircraft's stealth functionality. Super-cruise is a key requirement for a stealth aircraft. Delay in its development is being cited as one of the main reasons for India reportedly halting its participation in the Fifth Generation Fighter Aircraft (FGFA) project.

Super-cruise means an ability to cruise at supersonic speed without after-burners which translates into a lower heat signature besides enormous fuel savings. The second stage engine, internally known as Izdelie-30, marked its first test flight in December 2017 on board a Su-57 fighter jet and further developments are going on. The Russian Air Force plans to purchase a dozen Su-57s fitted with the AL-41F1 engines in 2019, and over the next eight years will continue to purchase small numbers of these planes for testing.

The engine of the “first stage” for fighter generation 4 ++ Su-35BM, adopted by the Russian Air Force (now VKS) under the designation Su-35S, with a thrust of 14,000 kgf at full boost (14,500 in emergency mode) [11] [12] . Created on the basis of the AL-31F, AL-31FP and AL-41F engines. Despite the scheme similar to the AL-31F, the engine consists of 80% of new parts [13] . It is distinguished from its predecessors by increased thrust (14,000 [14] kgf versus 12,500 for the AL-31F), a fully digital control system, a plasma ignition system, a new compressor of a larger diameter, a significantly increased resource (4,000 hours against 1,000 for the AL-31F) and improved consumables characteristics [13]. The box of units is located on top of the engine. The cost of development amounted to 3 billion rubles.

Developed from scratch over the course of almost a decade at the Saturn Tool-Making Plant in Rybinsk, central Russia, Izdeliye 30 features improved thrust characteristics (19,000 kgf vs. 15,000 kgf in the AL-41F1), better fuel efficiency, fewer moving parts, and subsequently improved reliability and lower maintenance costs.

The plane's three dimensional thrust vector jets, a design which the US does not have. The F-22 Raptor, for example, uses two-dimensional vector thrust jets, affecting only its pitch, for maneuverability. The F-35 Lightning II lacks the capability altogether, except for its vertical take-off and landing functions. No information is available regarding China's J-20 stealth fighter.

https://www.globalsecurity.org/military/world/russia/izdeliye-30.htm
The engine shown in the pic isn't Izdeliye 30. This was proposed by MMPP Salyut as the second stage engine but was rejected in favor of Item 30 from NPO Saturn.
 

IndianHawk

New Member
Joined
Sep 24, 2016
Messages
9,058
Likes
37,675
Country flag
Izdeliye-30
Under normal circumstances, the necessary PAK FA engine should have been designed before starting work on the aircraft airframe. But after the collapse of the Soviet Union, the Russian defense industry was in a state of chaos and there was no possibility of starting work on creating the appropriate engine for the new aircraft in advance, that is, in the 1990s. In many ways, this was a lost decade for the Russian defense industry.

The engine on the T-50 is fundamentally better than its predecessor. It has the elements of the fifth generation. A new turbine has been used, thanks to which the flow characteristics have been improved. They may not be entirely optimal, but nevertheless will implement all the specifiedrequirements with a margin, with significantly increased engine thrust. It has a fundamentally different management system - it is digital. The engine of the second stage for the Su-57 fighter (“product 30”) was developed at the Lyulki Design Bureau under the direction of Evgeny Marchukov and in collaboration with other large Russian engine-building companies. Salyut developed a high-pressure compressor, a combustion chamber, and an “product 30” engine nozzle with thrust vector control. The engine will be produced at PJSC ODK-UMPO (now the AL-41F1S engine or “product 117C” is produced there for the Su-35C fighter). According to the manufacturer, the gas generator "products 30" has a compression ratio of 6.7, air consumption is 21-23 kg / s. The gas temperature before the turbine reaches 1950-2100 degrees Kelvin. The maximum thrust is 17-18 tons, which is more than 15 tons for the engine of the "first stage" AL-41F1.

The experimental design bureau named after Lyulka produced the first launch of the “product 30” - the engine of the second stage for the promising Russian T-50 fighter (PAK FA). The tests took place on November 11, 2016, but it became known only later. The first launch was considered successful. Other details about the tests are not yet known. Currently, T-50 prototypes were flying with modified high-temperature turbojet bypass engines with an afterburner AL-41F1 (“product 171”). These installations were created on the basis of the AL-41F1S ("product 117C") for the Su-35S fighter. Otherwise, the AL-41F1 is called the engine of the first stage, since such installations will be mounted on the first production T-50 fighter jets.

The engine of the “second stage” in terms of fuel efficiency and specific gravity will significantly exceed the “product 117”, and in terms of design and technological performance and the level of parameters achieved, it will fully correspond to the world level of the fifth generation engine. The engine of the second stage, presumably, will be able to develop thrust of 107 kilonewtons in cruise mode and 176 kilonewtons in boost mode.

The development of the engine of the second stage - “product 30” - includes a number of research works (R & D):

  • R & D "129" - low pressure compressor (LPC), 3 stages.
  • R & D "133" - gas generator - 5th high pressure compressor + combustion chamber + 1 high pressure turbine.
  • Low pressure turbine, one stage, without a specific number.
  • Research "135"
  • R & D "137"


VIAM, CIAM, NIAT participated in the development and organization of mass production of the new engine. Each of the institutions had the necessary funding, scientific and technical base, trained personnel and plans, thought out to the smallest detail. Some created materials, others developed technological processes for mass production. A huge contribution was made by VVIA imeni Zhukovsky. It was at one of the departments of the Academy that research was carried out related to the special coating of engine blades.

The concept envisages the development of an engine for ultrahigh (according to current ideas) parameters while concentrating efforts on design, design, materials science solutions. This approach in today's conditions is difficult to implement because of the huge financial costs of creating such an engine in the required timeframe (over a billion dollars). This concept has the following counterarguments: if Russia does not reach this high level in the next 10 years, it will forever lag behind the world's leading manufacturers.

These concepts will be implemented in the design of the engine of the 5th generation. In the direction of the development of design solutions and the appearance of a new 5th generation aircraft engineSalyut works together with CIAM, TsAGI, VIAM, VILS and other leading organizations of the aviation industry. For the engine of a new generation, a number of new nodes for the Russian equipment is offered, as well as solutions applied in modernized and modified versions. For example, it is expected to obtain close to the stoichiometric parameters of the engine operating cycle through the use of the development of an efficiently cooled turbine working blade, jointly with CIAM. Electrician, conducting these works with the participation of the firm "Allison". This domestic development will allow to reach the level of gas temperatures before the turbine 2000 - 2100K. Two original technologies developed by VIAM are used to create cooling channels in the two-layer walls of the pen and the shelf of the blade.

On July 14, 2015, the UEC reported that under the program for creating the second stage engine for the PAK FA, the technical design of the engine was formed, and the production of engine components for the demonstrator engine and the gas generator was started. According to the developers, the number of parts in the high-pressure compressor (HPC) of the “product 30” was almost halved compared to the compressor of the engine of the previous stage, while providing a significant increase in work by one step. The cost of manufacturing such a compressor will not exceed the cost of manufacturing the ARC engine of the AL-41F1, subject to the use of new materials and technologies. In the new engine for the T-50 used composite materials, which are built not only on the polymer matrix for the cold part, but also parts created from high-temperature compositions.

The engine of the second stage will receive a compressor with increased air flow, a new combustion chamber, all-view thrust vector control, nozzles with reverse thrust and a digital control system, which will increase the engine power.

The prospective power plant will differ from the AL-41F1 by increased fuel efficiency and lower life cycle cost. The AL-41F1 engines are capable of thrusting at 86.3 kilonewtons and up to 147 kilonewtons in boost mode. The power plant is equipped with a plasma ignition system and all-direction vector thrust control. In 2017 tests of demonstrators of the “product 30” technologies will begin on an airplane - a flying laboratory. It is also expected that in 2018, developers will begin to test the prototype of the new power plant, and from 2023-2025 they will begin to install "products 30" on the T-50.

Russia is still testing the Su-57's new Izdelie-30 [Article 30] engine, which means it is still flying on the Su-35's AL-41F1 engine, and cannot be considered a fifth-generation aircraft yet. The engine will not be ready until 2025, and the Su-57 will not be ready for serial production until 2027. One of major obstacles widely reported to have held the T-50 back from production in the past was the absence of a true fifth-generation engine for the aircraft, with prototypes of the aircraft using a derivative of the AL-41F1 engine, similar to the one used in the Sukhoi Su-35S 4++ generation multirole fighter.

But by 2017, Russian designers were on the brink of reaching a breakthrough on a totally new, truly fifth-gen engine, known as Izdeliye 30 (Product 30), a design which Russian experts claimed had no equivalents in the world of engine construction. United Engine Corporation (UEC), Russias sole aero-engine manufacturer, has confirmed that the proposed "second stage" engine for the Su-57 stealth fighter jet will have a super-cruise feature which will form a part of the aircraft's stealth functionality. Super-cruise is a key requirement for a stealth aircraft. Delay in its development is being cited as one of the main reasons for India reportedly halting its participation in the Fifth Generation Fighter Aircraft (FGFA) project.

Super-cruise means an ability to cruise at supersonic speed without after-burners which translates into a lower heat signature besides enormous fuel savings. The second stage engine, internally known as Izdelie-30, marked its first test flight in December 2017 on board a Su-57 fighter jet and further developments are going on. The Russian Air Force plans to purchase a dozen Su-57s fitted with the AL-41F1 engines in 2019, and over the next eight years will continue to purchase small numbers of these planes for testing.

The engine of the “first stage” for fighter generation 4 ++ Su-35BM, adopted by the Russian Air Force (now VKS) under the designation Su-35S, with a thrust of 14,000 kgf at full boost (14,500 in emergency mode) [11] [12] . Created on the basis of the AL-31F, AL-31FP and AL-41F engines. Despite the scheme similar to the AL-31F, the engine consists of 80% of new parts [13] . It is distinguished from its predecessors by increased thrust (14,000 [14] kgf versus 12,500 for the AL-31F), a fully digital control system, a plasma ignition system, a new compressor of a larger diameter, a significantly increased resource (4,000 hours against 1,000 for the AL-31F) and improved consumables characteristics [13]. The box of units is located on top of the engine. The cost of development amounted to 3 billion rubles.

Developed from scratch over the course of almost a decade at the Saturn Tool-Making Plant in Rybinsk, central Russia, Izdeliye 30 features improved thrust characteristics (19,000 kgf vs. 15,000 kgf in the AL-41F1), better fuel efficiency, fewer moving parts, and subsequently improved reliability and lower maintenance costs.

The plane's three dimensional thrust vector jets, a design which the US does not have. The F-22 Raptor, for example, uses two-dimensional vector thrust jets, affecting only its pitch, for maneuverability. The F-35 Lightning II lacks the capability altogether, except for its vertical take-off and landing functions. No information is available regarding China's J-20 stealth fighter.

https://www.globalsecurity.org/military/world/russia/izdeliye-30.htm
Thanks for posting this will read in detail when free .

Sent from my C103 using Tapatalk
 

Adrian Corvus

New Member
Joined
Apr 23, 2019
Messages
234
Likes
959
Country flag
Can anyone enlighten me on the function of the holes/gaps under the vertical stabilizers.
 

bhramos

New Member
Joined
Mar 21, 2009
Messages
25,644
Likes
37,250
Country flag
China Thinks Russia's Su-57 Fighter Has "Stealth Killing" Radar
 

bhramos

New Member
Joined
Mar 21, 2009
Messages
25,644
Likes
37,250
Country flag
Su-57 will be equipped with a guided bomb KAB-250A



5th-gen Russian fighter Su-57 will receive a guided bomb KAB-250, general director of state-owned developer is Igor Krylov. According to him, new bomb has already passed the full cycle of tests on Su-34 bomber, later on Su-35

 

bhramos

New Member
Joined
Mar 21, 2009
Messages
25,644
Likes
37,250
Country flag
Six Su-57 escort Putin's Plane
Six Su-57 #stealth fighter jets escort #Putin's presidential plane on approach to 929th State Flight Testing Centre (GLITs) airbase in Akhtubinsk as he flew to see latest weapons systems and inspect the #Kinzhal advanced missile system.
 

IndianHawk

New Member
Joined
Sep 24, 2016
Messages
9,058
Likes
37,675
Country flag
Izdeliye-30
Under normal circumstances, the necessary PAK FA engine should have been designed before starting work on the aircraft airframe. But after the collapse of the Soviet Union, the Russian defense industry was in a state of chaos and there was no possibility of starting work on creating the appropriate engine for the new aircraft in advance, that is, in the 1990s. In many ways, this was a lost decade for the Russian defense industry.

The engine on the T-50 is fundamentally better than its predecessor. It has the elements of the fifth generation. A new turbine has been used, thanks to which the flow characteristics have been improved. They may not be entirely optimal, but nevertheless will implement all the specifiedrequirements with a margin, with significantly increased engine thrust. It has a fundamentally different management system - it is digital. The engine of the second stage for the Su-57 fighter (“product 30”) was developed at the Lyulki Design Bureau under the direction of Evgeny Marchukov and in collaboration with other large Russian engine-building companies. Salyut developed a high-pressure compressor, a combustion chamber, and an “product 30” engine nozzle with thrust vector control. The engine will be produced at PJSC ODK-UMPO (now the AL-41F1S engine or “product 117C” is produced there for the Su-35C fighter). According to the manufacturer, the gas generator "products 30" has a compression ratio of 6.7, air consumption is 21-23 kg / s. The gas temperature before the turbine reaches 1950-2100 degrees Kelvin. The maximum thrust is 17-18 tons, which is more than 15 tons for the engine of the "first stage" AL-41F1.

The experimental design bureau named after Lyulka produced the first launch of the “product 30” - the engine of the second stage for the promising Russian T-50 fighter (PAK FA). The tests took place on November 11, 2016, but it became known only later. The first launch was considered successful. Other details about the tests are not yet known. Currently, T-50 prototypes were flying with modified high-temperature turbojet bypass engines with an afterburner AL-41F1 (“product 171”). These installations were created on the basis of the AL-41F1S ("product 117C") for the Su-35S fighter. Otherwise, the AL-41F1 is called the engine of the first stage, since such installations will be mounted on the first production T-50 fighter jets.

The engine of the “second stage” in terms of fuel efficiency and specific gravity will significantly exceed the “product 117”, and in terms of design and technological performance and the level of parameters achieved, it will fully correspond to the world level of the fifth generation engine. The engine of the second stage, presumably, will be able to develop thrust of 107 kilonewtons in cruise mode and 176 kilonewtons in boost mode.

The development of the engine of the second stage - “product 30” - includes a number of research works (R & D):

  • R & D "129" - low pressure compressor (LPC), 3 stages.
  • R & D "133" - gas generator - 5th high pressure compressor + combustion chamber + 1 high pressure turbine.
  • Low pressure turbine, one stage, without a specific number.
  • Research "135"
  • R & D "137"


VIAM, CIAM, NIAT participated in the development and organization of mass production of the new engine. Each of the institutions had the necessary funding, scientific and technical base, trained personnel and plans, thought out to the smallest detail. Some created materials, others developed technological processes for mass production. A huge contribution was made by VVIA imeni Zhukovsky. It was at one of the departments of the Academy that research was carried out related to the special coating of engine blades.

The concept envisages the development of an engine for ultrahigh (according to current ideas) parameters while concentrating efforts on design, design, materials science solutions. This approach in today's conditions is difficult to implement because of the huge financial costs of creating such an engine in the required timeframe (over a billion dollars). This concept has the following counterarguments: if Russia does not reach this high level in the next 10 years, it will forever lag behind the world's leading manufacturers.

These concepts will be implemented in the design of the engine of the 5th generation. In the direction of the development of design solutions and the appearance of a new 5th generation aircraft engineSalyut works together with CIAM, TsAGI, VIAM, VILS and other leading organizations of the aviation industry. For the engine of a new generation, a number of new nodes for the Russian equipment is offered, as well as solutions applied in modernized and modified versions. For example, it is expected to obtain close to the stoichiometric parameters of the engine operating cycle through the use of the development of an efficiently cooled turbine working blade, jointly with CIAM. Electrician, conducting these works with the participation of the firm "Allison". This domestic development will allow to reach the level of gas temperatures before the turbine 2000 - 2100K. Two original technologies developed by VIAM are used to create cooling channels in the two-layer walls of the pen and the shelf of the blade.

On July 14, 2015, the UEC reported that under the program for creating the second stage engine for the PAK FA, the technical design of the engine was formed, and the production of engine components for the demonstrator engine and the gas generator was started. According to the developers, the number of parts in the high-pressure compressor (HPC) of the “product 30” was almost halved compared to the compressor of the engine of the previous stage, while providing a significant increase in work by one step. The cost of manufacturing such a compressor will not exceed the cost of manufacturing the ARC engine of the AL-41F1, subject to the use of new materials and technologies. In the new engine for the T-50 used composite materials, which are built not only on the polymer matrix for the cold part, but also parts created from high-temperature compositions.

The engine of the second stage will receive a compressor with increased air flow, a new combustion chamber, all-view thrust vector control, nozzles with reverse thrust and a digital control system, which will increase the engine power.

The prospective power plant will differ from the AL-41F1 by increased fuel efficiency and lower life cycle cost. The AL-41F1 engines are capable of thrusting at 86.3 kilonewtons and up to 147 kilonewtons in boost mode. The power plant is equipped with a plasma ignition system and all-direction vector thrust control. In 2017 tests of demonstrators of the “product 30” technologies will begin on an airplane - a flying laboratory. It is also expected that in 2018, developers will begin to test the prototype of the new power plant, and from 2023-2025 they will begin to install "products 30" on the T-50.

Russia is still testing the Su-57's new Izdelie-30 [Article 30] engine, which means it is still flying on the Su-35's AL-41F1 engine, and cannot be considered a fifth-generation aircraft yet. The engine will not be ready until 2025, and the Su-57 will not be ready for serial production until 2027. One of major obstacles widely reported to have held the T-50 back from production in the past was the absence of a true fifth-generation engine for the aircraft, with prototypes of the aircraft using a derivative of the AL-41F1 engine, similar to the one used in the Sukhoi Su-35S 4++ generation multirole fighter.

But by 2017, Russian designers were on the brink of reaching a breakthrough on a totally new, truly fifth-gen engine, known as Izdeliye 30 (Product 30), a design which Russian experts claimed had no equivalents in the world of engine construction. United Engine Corporation (UEC), Russias sole aero-engine manufacturer, has confirmed that the proposed "second stage" engine for the Su-57 stealth fighter jet will have a super-cruise feature which will form a part of the aircraft's stealth functionality. Super-cruise is a key requirement for a stealth aircraft. Delay in its development is being cited as one of the main reasons for India reportedly halting its participation in the Fifth Generation Fighter Aircraft (FGFA) project.

Super-cruise means an ability to cruise at supersonic speed without after-burners which translates into a lower heat signature besides enormous fuel savings. The second stage engine, internally known as Izdelie-30, marked its first test flight in December 2017 on board a Su-57 fighter jet and further developments are going on. The Russian Air Force plans to purchase a dozen Su-57s fitted with the AL-41F1 engines in 2019, and over the next eight years will continue to purchase small numbers of these planes for testing.

The engine of the “first stage” for fighter generation 4 ++ Su-35BM, adopted by the Russian Air Force (now VKS) under the designation Su-35S, with a thrust of 14,000 kgf at full boost (14,500 in emergency mode) [11] [12] . Created on the basis of the AL-31F, AL-31FP and AL-41F engines. Despite the scheme similar to the AL-31F, the engine consists of 80% of new parts [13] . It is distinguished from its predecessors by increased thrust (14,000 [14] kgf versus 12,500 for the AL-31F), a fully digital control system, a plasma ignition system, a new compressor of a larger diameter, a significantly increased resource (4,000 hours against 1,000 for the AL-31F) and improved consumables characteristics [13]. The box of units is located on top of the engine. The cost of development amounted to 3 billion rubles.

Developed from scratch over the course of almost a decade at the Saturn Tool-Making Plant in Rybinsk, central Russia, Izdeliye 30 features improved thrust characteristics (19,000 kgf vs. 15,000 kgf in the AL-41F1), better fuel efficiency, fewer moving parts, and subsequently improved reliability and lower maintenance costs.

The plane's three dimensional thrust vector jets, a design which the US does not have. The F-22 Raptor, for example, uses two-dimensional vector thrust jets, affecting only its pitch, for maneuverability. The F-35 Lightning II lacks the capability altogether, except for its vertical take-off and landing functions. No information is available regarding China's J-20 stealth fighter.

https://www.globalsecurity.org/military/world/russia/izdeliye-30.htm
So this report confirms some things.
India is waiting for idz 30 to mature and it will only mature by 2025. At that point india may revisit fgfa project or directly purchase su57.

Also idz 30 is targeting 108 kn dry and 176 kn wet thrust. Slightly behind f35 engine .
But that engine once mature could be basis for a single engine Stealth fighter about the same size as f35 although with a bit less payload.

Fgfa if revisited in 2025 will come much later and amca will be there by then so fgfa seems doomed.
But su57 MKI can be delivered faster if required.

The real question is what iaf wants for Stealth .
Is it going all in with only amca or it will seek heavier su57 which provides more range bigger internal bays , more power for avionics and ew but is less Stealthy in design.

Sent from my C103 using Tapatalk
 

Armand2REP

CHINI EXPERT
New Member
Joined
Dec 17, 2009
Messages
13,811
Likes
6,734
Country flag
So this report confirms some things.
India is waiting for idz 30 to mature and it will only mature by 2025. At that point india may revisit fgfa project or directly purchase su57.

Also idz 30 is targeting 108 kn dry and 176 kn wet thrust. Slightly behind f35 engine .
But that engine once mature could be basis for a single engine Stealth fighter about the same size as f35 although with a bit less payload.

Fgfa if revisited in 2025 will come much later and amca will be there by then so fgfa seems doomed.
But su57 MKI can be delivered faster if required.

The real question is what iaf wants for Stealth .
Is it going all in with only amca or it will seek heavier su57 which provides more range bigger internal bays , more power for avionics and ew but is less Stealthy in design.

Sent from my C103 using Tapatalk
Now that Modi has won you can forget all of that. Rafale will be bought in the hundreds and just for India we are making uprated M88 to power all of India's indigenous fighters. The idz 30 might be powerful but it is extremely heavy and only advantageous to heavy weight fighters. The design perimeters are set and the only two engines in contention are F414 and uprated M88.
 

IndianHawk

New Member
Joined
Sep 24, 2016
Messages
9,058
Likes
37,675
Country flag
Now that Modi has won you can forget all of that. Rafale will be bought in the hundreds and just for India we are making uprated M88 to power all of India's indigenous fighters. The idz 30 might be powerful but it is extremely heavy and only advantageous to heavy weight fighters. The design perimeters are set and the only two engines in contention are F414 and uprated M88.
Rafale doesn't fill the Stealth void. Either AMCA comes in time or IAF will remain Stealthless.
Even with AMCA coming in time IAF still has to go a whole decade till 2030 without Stealth.

What are the targeted thrust weight for uprated m88 ? How will it be useful for indegenisation unless its core is mated with Kaveri.
What happens to K9 or k10 then?

Sent from my C103 using Tapatalk
 

Kchontha

New Member
Joined
May 29, 2017
Messages
784
Likes
1,209
Country flag
What happens to K9 or k10 then?

Sent from my C103 using Tapatalk
At the moment Kaveri is in limbo. We need to pump in more funds to leverage r&d for engine hot section. For that private and public sector should go hand in hand. We need Ceramic Matrix Composite (CMC) materials to enable kabini to achieve the highest core temperature. They should also use 3D technology to develop complex components one layer at a time and open the creative canvass for engineers.

We need to partner with other engine makers. Even highly experienced engine making countries such as German and French are partnering for a definitive powerplant for their sixth gen scaf. French are providing the hot section while German the cold one.

Sent from my Redmi Note 4 using Tapatalk
 

Articles

Top