Skyroot Aerospace - Updates & Activities

Indx TechStyle

Kitty mod
Mod
Joined
Apr 29, 2015
Messages
18,289
Likes
56,242
Country flag
SKYROOT Aerospace
VIKRAM SERIES
Vikram, named after Dr. Vikram Sarabhai, the father of Indian Space Program, is a series of launch vehicles especially crafted for the small satellite market. Built on common architecture and covering a wide range of payloads, they offer the most affordable and on demand ride to space.
Launch Vehicles

VIKRAM I
VIKRAM II
VIKRAM III

PAYLOAD
200 kg to 500 km SSPO.
280 kg to 45º inclination 500 km LEO .

ARCHITECTURE
Highly reliable solid propulsion stages with proven design heritage.
Miniaturized and Modern Avionics.
Ultra-Lowshock Pneumatic separation.

FLEXIBLE
Orbital Adjustment Module with re-start capability enables multi-orbit insertions.

ECONOMIC
Lowest cost in the payload segment

RESPONSIVE
Requires Minimal range infrastructure. Can be assembled and launched within 24 hours from any launch site.
 

Indx TechStyle

Kitty mod
Mod
Joined
Apr 29, 2015
Messages
18,289
Likes
56,242
Country flag
With ISRO assistance, India’s Skyroot Aerospace aims maiden rocket launch by Dec-2021


If all goes well, the company is looking forward to a maiden launch by December 2021, with the support and guidance of the Indian Space Research Organization(ISRO). Photograph: (WION )
Skyroot Aerospace, an Indian startup has become the first in the country to test-fire a homegrown upper-stage rocket engine. This is seen as a major milestone in the long-drawn process of building a space faring rocket.
A typical rocket consists of two or more stages, each of which would have its own engines(either single or packed in a cluster). Simply put, a rocket is a combination of multiple engines(stages) that are vertically stacked. While the company has tested the upper-most stage engine, the initial stage engines are being manufactured. If all goes well, the company is looking forward to a maiden launch by December 2021, with the support and guidance of the Indian Space Research Organization (ISRO).
To understand the significance of this test and throw light on the fledgling aerospace startup’s rocket launch plans, WION spoke to team Skyroot.
WION: Tell us more about the recent engine test. Which rocket variant is this engine meant for and what fuel does this engine use ? How much thrust does this engine generate?

Skyroot:
We have planned three rockets - Vikram I,II &III, the name is a tribute to ISRO founder Vikram Sarabhai. The current engine is a meant to be the final stage of the four-stage rocket Vikram I. Vikram I is to be powered by 3 stages of solid-fueled engines and the final stage, which we have currently tested is a liquid-fueled one. We have named this engine Raman, as a tribute to Nobel laureate Sir C.V. Raman. The Raman engine is powered by UDMH and NTO liquid fuels and a cluster of 4 engines would generate 3.4kN thrust.

WION: Any specific reasons on why this particular fuel combination was chosen over the others ?

Skyroot:
UDMH and NTO were chosen as they are earth-storable liquids. Using this fuel and our engine we can switch on and off multiple times. The ability to re-start any number of times provides the option of launching multiple satellites in different orbits.

WION: Raman is one engine that goes into the final stage. What about the readiness of the first three stages ?

Skyroot:
The first three stage engines are under different stages of manufacturing and we hope to test two of them in about six months time.

WION: What about the intended payload capacity of the three rockets that your team is working on ?

Skyroot:
Vikram I is meant to lift 225 kg to 500 km Sun Synchronous Polar Orbit(SSPO) and 315 kg to 45º inclination 500 km Low Earth Orbit (LEO). Vikram II is designed for 410 kg to 500 km SSPO and 520 kg to 45º inclination 500km LEO. In case of Vikram III we are looking at 580 kg to 500 km SSPO and 720 kg to 45º inclination 500 km LEO.

WION: What would be your USP given that ISRO’s latest rocket Small Satellite Launch Vehicle(SSLV) also caters to a similar (sub 500-750kg) payload segment ?

Skyroot: When compared to the SSLV rocket, our vehicle is even smaller. We can only compare vehicles of a similar size category, as the price per Kg of payload becomes cheaper with rockets getting bigger. We can confidently say that in the small vehicles segment, we can offer the best and most competitive prices once we get into mass production. As all our 3 variants get operational, we can also offer a significant reduction in per kg cost.

WION: Testing rocket engines, sourcing components and preparing them for launch requires expensive infrastructure. How are you managing ?

Skyroot:
We have some basic facilities of our own and the rest are to be provided by ISRO. In terms of procuring components, there is a reasonably well developed infrastructure in India, thanks to ISRO. We are able to source majority of our components from various vendors and MSMEs within India. As manufacturing costs are relatively low in India, our overall development cost comes down.

WION: ISRO needed over two decades to master their most reliable rocket engine - Vikas. How is a startup able to do the same in lesser time, so much so that a December 2021 launch is envisioned?

Skyroot: Although we started off in 2018, we have had a head-start because there are ISRO veterans helping us, besides Indians who have worked in this field in foreign countries. Basically the scale and thrust of our engines are lesser than the ones being used at ISRO. We have also been trying new technologies such as 3-D printing in fabricating the engines. This has nearly reduced the overall mass by 50%, and reduced total number of components & lead time by 80%.

WION: 3-D printing is majorly used in India for plastics, how do you think this would fare for metals and alloys. Especially in terms of its efficiency in manufacturing rocket-engine components ?

Skyroot:
Besides metals we are also using special materials in the 3-D printing process and the Vikram engine has come out as designed and is highly efficient. Though uncommon in India, 3-D printing using metals is widely used in the international market and carious components used for space projects are 3-D printed. We are looking forward to 3-D printing the entire Cryogenic engine to be used in our Vikram-2 rocket.

WION: In terms of vehicle assembly, launch operations and post-launch tracking and telemetry, how would you manage and which facilities would you be using ?

Skyroot:
For Launch pad and Mission control we would be making use of ISRO facilities, preferably the new launch pad for SSLV that is coming up. But that depends on the timeline of when the pad will be ready and when our rocket will be ready. It is upto ISRO to determine the cost that would be incurred for providing us these facilities for launch, currently ISRO charges us a nominal amount for the testing that our equipment undergoes.

WION: Testing and Launch operations are very costly and involve expensive infrastructure. How would liabilities be covered in case of mishaps and what about the quantum of damages that would be sought (if any) ?

Skyroot:
Given that insurance is available for all these components and processes, of course liabilities are going to be covered by insurance. But even otherwise, prior to every single test there is a board of approval that does several check before granting permission. After the board grants the go-ahead, then any test has a fair chance. Of course, in case of damage there will be payments that one party would have to make to the other and insurance would also be covering a portion. We look forward In-SPACe playing a key role in making Insurance (if/when needed) accessible at affordable premiums for the NewSpace startups.

WION: How are things looking on the funding side ? Your ambitious goals require copious bankrolling. Are people willing to invest given the post-Covid economic scenario ?

Skyroot:
We have received an initial funding of Rs.31.5cr and are expecting to receive Rs.90cr over the next one year. There are big names that wish to invest in space technology and we are confident about it.

WION: How is In-SPACe (Govt of India) supporting your activity ? Is the 18% GST incurred by an Indian satellite company to launch on a private Indian rocket a hinderance ? Will satellite makers not go abroad and launch?

Skyroot:
In-SPACe is intended to offer single-window clearance for testing, launching, licensing and other aspects. We hope it will enable us to use the facilities. The 18% GST applies for any domestic service transaction irrespective of industry. A major pain point for NewSpace startups is the incurred 18% additional “upfront” cost which will locked up in GST credits. The company can only make use of GST credits only once we start making sizable revenues.

This problem applies to even developmental costs incurred .For example, Several crores of developmental/procurement costs we incur till we operationalize commercially, bears the brunt of GST. Ideally, capital-intensive hardware/Space startups like us should be given GST incentive in pre-revenue phases.

WION: Rocket science involves people from all scientific disciplines, tell us about the people in your team and the disciplines they cover.

Skyroot:
CEO -Pawan Kumar Chandana and COO - Naga Bharath Daka are Post graduates from IIT and had worked with ISRO on rocket mechanical systems and flight computer, avionics respectively. Currently we are a team of 40 and the fields of expertise are- Electronics, propulsion, guidance, navigation, control, structure etc. But we do outsource quite a bit of our work and that would mean that we have over 100 people working for us in all. But as we near launch, we’d certainly grow bigger as a team.

WION: Can we expect your proposed maiden launch by December 2021 to carry a dummy payload or live satellite(s)?

Skyroot:
Depending on demand, that is something we’ll decide about 6 months prior to launch.
 

Akula

Senior Member
Joined
Apr 24, 2019
Messages
2,895
Likes
10,850
Country flag
Skyroot Aerospace tested their Solid Rocket booster
 

Indx TechStyle

Kitty mod
Mod
Joined
Apr 29, 2015
Messages
18,289
Likes
56,242
Country flag
We are 1st Indian pvt company to test fire multiple rocket propulsion systems: Pawan Kumar Chandana, Skyroot
This according to the start-up is the largest investment within the Indian Space Startup scene after the government announced the opening up the Space sector for private players.
Skyroot Aerospace

We are targeting our first orbital launch of Vikram 1 around mid-2022. Post success, within few years, we would work towards building production capability to achieve a launch cadence of one launch a week.
Skyroot Aerospace, a National award-winning start-up is building India’s first privately built space launch vehicles. It has completed its Series A financing successfully, with USD 11 million. This according to the start-up is the largest investment within the Indian Space Startup scene after the government announced the opening up the Space sector for private players.
According to the company note USD 11M Series-A was led by Greenko Group founders Anil Chalamalasetty & Mahesh Kolli; and there was participation from other public listed entity Solar Group (a major Space & Defence supplier); Former-Whatsapp CBO Neeraj Arora; existing investor Mukesh Bansal (founder of Myntra & CureFit), Vedanshu Investments, Worldquant Ventures, Graph Ventures, Sutton Capital and others.
According to Pawan Kumar Chandana, Co-Founder and CEO of Skyroot, “We are excited to work with them in building Skyroot into number one Space player globally.” Adding, “We have signed an agreement with Indian Space Research Organization (ISRO), and that we will be working closely for our launch and testing requirements.
Naga Bharath Daka, Co-Founder and COO of Skyroot, “This adds more fuel to our rocket programme. It will also help in completing development and testing of all subsystems of our first launch vehicle Vikram-1.”
The company has already started bookings for launches which are expected to take off from mid- 2022. They plan to raise USD 40M which will be used in their future programmes over the next few years.
Pawan Kumar Chandana, Co-Founder and CEO of Skyroot, talks to Huma Siddiqui and shares more about his start-up.
Following are excerpts:

Tell more about your Start Up.

Founded by former Scientists of the Indian Space Research organization (ISRO), we at Skyroot are a National award-winning startup building one of the world’s most cost effective Space Launch Vehicles. In simple words – we build rockets for launching payloads (satellites for now and in future humans as well) to Space. Our mission is to democratize Space access by building affordable, reliable and responsive launch vehicles.
We are a world class team of 70+ rocket engineers with a cumulative experience of 500+ years in the rocket industry and we have been actively developing our Vikram series of launch vehicles for the past two years. We are the first Indian private company to test fire multiple rocket propulsion systems.
With the government opening the space sector to private players — how has it helped you?
Though opening up Space sector for private players was an eventuality we anticipated. ISRO announcing that it is their mandate to help private players with all facilities they need (in testing and launching) to meet their goals has been huge booster for us and has saved both our development costs and timelines. Utilizing existing facilities at ISRO will keep our core focus towards product development and save tons of money on re-building similar infrastructure.
We have signed up with ISRO to be able exchange information that is needed to be able utilize their testing and launch facilities in the future. ISRO has been super helpful throughout our journey.
What launches do you have planned?
We are targeting our first orbital launch of Vikram 1 around mid-2022. Post success, within few years, we would work towards building production capability to achieve a launch cadence of one launch a week.
Today, Satellites are indispensable part of our lives starting from the GPS we use on our mobiles for navigation, direct to home television, disaster response, urban planning, border surveillance and to providing internet in remote locations. However, reaching space has always been expensive and in the domain of government and large corporates.
Development of low-cost, reliable Space launch vehicles that can be produced, assembled and launched quickly is the key to enable the satellite industry (therby Space based services) to come up with innovative constellation-based solutions for application in various domains.
Hence solving the problem of Space access is first necessary step to pave way for trillion-dollar space ecosystem and this is going to tremendously improve quality of life on earth.
More about the Vikram series of launch vehicles
Vikram series is our flagship series of Space launch vehicles named after the father of Indian Space program – Dr Vikram Sarabhai. Our first objective is to commercialize Vikram-1 and also roll out the follow-on variants Vikram-2 and 3 which are essentially 80% same with a 20% upgrade but together cover the largest payload ranges from launching 1kg to 700kg of satellites not possible by existing vehicles in the market. The lower rocket stages of Vikram series are powered by low-cost, mass-produce able and high thrust solid propulsion while the final satellite insertion stage is a liquid propellant based stage which gives higher payload efficiency and mission flexibility with high restart capability. This is a unique architecture ideal for small satellite launch vehicles bringing costs down while being able to produce rockets at speeds unseen before.
Are you talking to other countries or the private space sector companies globally to work on projects?
Yes, more than 95% of our market comes from abroad and we actively interact with global customers (mainly satellite companies) and also look for strategic collaborations. We have a growing pipeline of interested customers who see great value in our solutions. The geographies are mainly from USA and Europe.
 

Vamsi

New Member
Joined
Jun 27, 2020
Messages
4,858
Likes
29,459
Country flag
When would vikram 1 launch?
Its a very long time to go, they just completed pressure test for 3rd stage, they have to do similar tests for 1st & 2nd stages and do static tests. After all these tests,it will be ready for launch. My guess is Dec 2022
 

FalconZero

Senior Member
Joined
Jun 20, 2020
Messages
3,782
Likes
19,757
Country flag
I wonder where they will get launch sites.
ISRO is helping them, now they can use ISRO's launch sites iirc.

Also, Skyroot is aiming to launch Vikram 1 as early as next year. Would be great if they launch it before SSLV kek.

1626790025563.png

 

FalconZero

Senior Member
Joined
Jun 20, 2020
Messages
3,782
Likes
19,757
Country flag

Haldilal

लड़ते लड़ते जीना है, लड़ते लड़ते मरना है
Senior Member
Joined
Aug 10, 2020
Messages
29,517
Likes
113,417
Country flag
Ya'll Nibbiars Skyroots and Bellatrix Aerospace JV sineing.

images - 2022-02-04T192747.962.jpeg
 

Akula

Senior Member
Joined
Apr 24, 2019
Messages
2,895
Likes
10,850
Country flag
Skyroot Aerospace test their rocket'e 3rd stage.
 

Latest Replies

Global Defence

New threads

Articles

Top