Super falcon
New Member
- Joined
- Nov 22, 2021
- Messages
- 870
- Likes
- 806
Definitely this is why india buying these also off shelf
WOW man
you have lot to catch up.
Definitely this is why india buying these also off shelf
WOW man
you have lot to catch up.
But plan was for 126 and i dia might order for 36 moreNo one setups production line for just 36 aircraft
India bought 276 sukhois 30 mki, most of which were then assembled at HAL nashik
wait what?Definitely this is why india buying these also off shelf
India has not embarked on that plan , current thinking is tejas mk1a will be orderd instead.But plan was for 126 and i dia might order for 36 more
Which is better?: Mistral or San Antonio class?Mistral more like to be inducted in indian navy or wasp class but Mistral are most probably be winner
Mistral can do multi role jobs San Antonio is expensive and don't have multirole usageWhich is better?: Mistral or San Antonio class?
So, in all after 2030.....Feasibility Study Complete: 4 Helicopter Carrier for Navy
- Feasibility study for electrical propulsion of upcoming LPD class completed.
- Two prototype 6 MW electric motors will be developed in 18 months from now for testing.
- 7.5 MW motors will be developed for actual ship which will be able to support 30k tonne displacement.
- Motors will be manufactured by BHEL under joint venture with a foreign OEM like GE.
- First ship will be delivered 5 years from signing of contract (say from 2025) and one ship will be delivered each following year.
- Shall operate at least 4 heavy lift helicopters with DEW based CIWS.
- May carry indigenous DBMRH (Deck Based Multi Role Helicopter), the naval variant of HAL IMRH under development instead of Mi-17.
That is correct coz no existing design matches the requirements mentioned in the RFISo, in all after 2030.....
But that has been discussed in this thread pages back. You don't need to spam every Indian thread with Chinese or Pakistani counterparts. Situations of China and India are different, Pakistan is far apart.China already ahead with type 075 LHD Ships why India is taking too long to finalize either locally built or foreign platforms procurement.
MRSV programme is strictly for helicopter carriers and expand amphibious warfare capabilities (currently only imported INS Jalawashwa takes that role). It simply adds up a new sector for focus on.Some how these LHD ships satisfy indian navy planners for need of third aircraft for time being
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
A | Air Force, Navy issue RFP for 100 mini-UAVs | Indian Air Force | 1 | |
Indian Army To Issue US$ 285 milion Weapons Locating Radar RFP- BEL To Participate | Indian Army | 5 | ||
IAF MTA RFI & RFP : News , Discussions & Updates. | Indian Air Force | 27 | ||
IAF Transport Aircraft RFP | Indian Air Force | 7 |