Project-75I class SSK Submarines

Tridev123

New Member
Joined
Jul 29, 2018
Messages
898
Likes
3,160
Country flag
Probably means that the P75I is going to get cancelled. Getting yet another foreign submarine into the fleet would be retarded.
Well, India certainly needs more conventional submarines with AIP for operation close to the shore. SSN's cannot replace conventional subs. For one they are very expensive and should be escorting high value assets like our SSBN's. Also since they will be big with under water displacement of > 6000 tonnes, it will be difficult for them to operate in shallow waters.

Also we don't have excess money like the US to field an large fleet of SSN's.

There are no verified reports that P75i has been cancelled. But if true, one reason could be that our indigenous SSK design with an indigenous AIP is ready.

Now why the VLS requirement for the P75i program has been withdrawn (if true) is an question mark. Does it not offer significant advantages over the torpedo tube launched missiles?. Though will cost more. A proper technical answer is needed.

Whether the P75i is on or off, an follow-on order for additional Scorpenes is warranted. Probably an bigger Super Scorpene. With AIP and VLS.

Many reports had speculated that an larger 3000 plus tonnes displacement Russian sub with Brahmos missile /VLS combo would be selected for the P75i. Because of the need to not depend 100% on the West. In a crisis situation the US can get access to all the technology developed by the Europeans. The French cannot resist US pressure. Nor can Germany. Nor can South Korea.

But the Ukraine war has probably upset all calculations. Will Russia be able to recover economically and deliver defence systems if any order is placed.

The indigenous option is the most preferable. But can the design and production agencies deliver. Don't want delays of 5 to 10 years and severe cost escalation. An MDL - L&T collaboration(50% workshare for each) for the indigenous SSK will lower the risk and increase compliance with deadlines.
 

Srinie

New Member
Joined
Nov 4, 2021
Messages
136
Likes
903
Country flag
Order 4 more scorpene submarines . Get DRDO AIP plug certified by the time those 4 are built. Then build 6-10 block 2 kalavari class with indigenous subsystems and DRDO AiP. Seems a common sensical approach . If we continue for unobtainium waste another decade with uboats retirement by the end of the decade china will cuckold us in our own backyard
 

BON PLAN

-*-
New Member
Joined
Dec 24, 2015
Messages
6,510
Likes
7,217
Country flag
India will opt for south Korean option which are based on U 214 Technology
Is it possible Indio opt for a single vendor situation? Strange, no?

If VLS is no more requested, the fact that Naval Group is no more in the race come from the AIP... But NG is on duty to integrate an indian AIP in the Scorpene already built. So why not an evolved indian AIP in a futur P75I ?

Very very strange affair.
 

johnj

New Member
Joined
Sep 15, 2021
Messages
1,776
Likes
2,673
India will opt for south Korean option which are based on U 214 Technology
Old enlarged design with li-ion, ie. old tech of japan, but meets IN specs but IN better ones than PLANs, so may IN change its requirements.
 

WolfPack86

New Member
Joined
Oct 20, 2015
Messages
10,571
Likes
16,993
Country flag
NEED FOR DECOMPLICATING ACQUISITION OF SIX SUBMARINES UNDER PROJECT 75(I) PROGRAM
Indian Navy’s 30-year-old plan to induct 24 submarines has faced enough hurdles and delays along its run-up so far. With the six submarines under Project 75 nearing completion, the follow-on contract for the next six has run into problems on the issue of Air Independent Propulsion (AIP). The author analyses this issue and offers a solution


by Amit Cowsish

The Indian Navy’s (IN) Project 75(I) to build six diesel-electric stealth submarines in India at an estimated cost of Rs 43,000 crore received a setback on April 30 when France’s Naval Group (DCNS) opted out of the race. It was one of the five foreign companies shortlisted by the Ministry of Defence (MoD) as potential technology collaborators with two Indian shipyards shortlisted for building the submarines in India.

Explaining the reason, Laurent Videau, Business Development Director for India and Thailand, reportedly said, “the present RFP requires that the fuel cell AIP (air-independent propulsion) be sea proven, which is not the case for us yet since the French Navy does not use such propulsion system”.

The AIP technology enables conventional non-nuclear submarines to stay underwater for over two weeks without surfacing to recharge their batteries, making them more efficient than the traditional diesel-electric submarines which must surface every few days.

IN’s 30-year plan to induct 24 submarines by 2030 was approved by the Cabinet Committee on Security (CCS) in 1999, but it was only in 2005 that the first contract for building six Scorpene conventional submarines in collaboration with DCNS (now Naval Group) was awarded to Mazagaon Dockyard Shipbuilders Limited (MDL) under Project 75.

While the last of these submarines is scheduled to be commissioned next year, the follow-on contract for building another six submarines under Project 75(I) is now facing headwinds because the MoD decided to acquire the submarines on a competitive basis under the Strategic Partnership (SP) model and the Naval Group’s decision to opt-out of the competition at a belated stage.

Introduced in 2016 by MoD, this model was intended to ‘institutionalise a transparent, objective and functional mechanism to encourage broader participation of the private sector, in addition to capacities of DPSUs/OFB, in manufacturing of major defence platforms, which included submarines, fighter aircraft, helicopters, and armoured fighting vehicles.

The SP model envisages parallel shortlisting of foreign manufacturers whose products meet the armed forces’ requirements and the Indian companies who could tie up with the former to make the product in India as prime vendors. The process of shortlisting the foreign and Indian companies is cumbersome and potentially contentious, but to its credit, IN managed to complete these processes without much difficulty.

The foreign companies shortlisted for Project 75(I) were Naval Group (France), ThyssenKrupp Marine Systems (Germany), Rosoboronexport (Russia), Daewoo (South Korea), and Navantia (Spain). As for the Indian companies, in a move that surprised many as it was not in keeping with the spirit of the SP Model, MoD shortlisted state-owned Mazagon Dock Shipbuilders (MDL) alongside the private sector conglomerate Larsen & Toubro (L&T).

Be that as it may, the Request for Proposal (RFP) for six submarines was issued to the two Indian shipyards last July, specifying that they could tie up with any one of the shortlisted foreign companies for the project. The bids were to be submitted by December 2021, but the deadline has been extended to June 2022.

The date for submission of bids was apparently extended because the Indian companies could not finalise the tie-up with the shortlisted foreign companies before the original deadline. This was probably because of the latter’s discomfort with the RFP conditions, as is the case with the Naval Group.

According to some unconfirmed reports, Navantia too has similar issues with the RFP, ThyssenKrupp is uncomfortable with the requirement of indigenous content in the submarines and the extent of liability of the foreign partner, and Daewoo wants some changes in the RFP conditions. None of these is good news as it is procedurally cumbersome, though not impossible, to make changes in the RFP. This leaves only Rosoboronexport (ROE) in the game.

Even if ROE can meet the AIP and other RFP conditions, the shortlisted Indian companies may be wary of tying up with it in the face of the mounting pressure on India from across the world to at least scale down the defence dealings with Moscow whose brutal and unjustifiable offensive in Ukraine has shocked the world and put India in a tight spot. Besides, the prospects of being sanctioned by the US and its NATO allies are too real to be ignored.

Some analysts are of the view that India may be able to persuade at least one foreign company to remain involved in the project, but they also fear that since in this situation only one of the two Indian companies will be able to tie up with the former and respond to the RFP, it will result in a single vendor situation.

Theoretically, it is possible to go ahead with this, or any other, project even in a single vendor situation, but for doing that MoD will have to convince itself after internal deliberations that the competition cannot be broadened by modifying the specified requirements, notably the need for the AIP system. The result of such an internal deliberation cannot be foretold.

At any rate, the situation that has come to pass points to the age-old problem of the services formulating unrealistic and ambitious specifications or, to use the formal jargon, Services Qualitative Requirements (SQRs). Prima facie, it also points to some error on MoD’s part in shortlisting the foreign companies.

The procedure prescribed for the SP model requires MoD to issue a Request for Information (RFI) to the foreign companies which can potentially meet the armed forces’ requirement to, among other things, elicit the information required for finalising the SQRs. Thereafter, an Expression of Interest (EOI) is issued to them detailing all requirements, including the range and depth of technologies to be transferred to the production agency in India.

It is inconceivable that while responding to the RFI, and later the EOI, all the five shortlisted companies misrepresented that they possessed sea-proven AIP technology. That being the case, it is unclear why the companies which do not have sea-proven AIP were shortlisted and why this requirement was included in the RFP. One of the main purposes of an RFI is to elicit all manner of information from the prospective suppliers that help in formulating a viable acquisition proposal. Evidently, it did not happen in this case.

Meanwhile, Defence Research and Development Organisation (DRDO) has developed a modular AIP system that can be integrated with any conventional submarine, including the submarines already built under Project 75, though it may take some time to complete the trials and testing required to prove the seaworthiness of the system. This queer the pitch for Project 75 (I) as it is the government’s policy to give preference to indigenous products over foreign products.
 

saketkr

New Member
Joined
Feb 10, 2019
Messages
66
Likes
327
Country flag
NEED FOR DECOMPLICATING ACQUISITION OF SIX SUBMARINES UNDER PROJECT 75(I) PROGRAM
Indian Navy’s 30-year-old plan to induct 24 submarines has faced enough hurdles and delays along its run-up so far. With the six submarines under Project 75 nearing completion, the follow-on contract for the next six has run into problems on the issue of Air Independent Propulsion (AIP). The author analyses this issue and offers a solution


by Amit Cowsish

The Indian Navy’s (IN) Project 75(I) to build six diesel-electric stealth submarines in India at an estimated cost of Rs 43,000 crore received a setback on April 30 when France’s Naval Group (DCNS) opted out of the race. It was one of the five foreign companies shortlisted by the Ministry of Defence (MoD) as potential technology collaborators with two Indian shipyards shortlisted for building the submarines in India.

Explaining the reason, Laurent Videau, Business Development Director for India and Thailand, reportedly said, “the present RFP requires that the fuel cell AIP (air-independent propulsion) be sea proven, which is not the case for us yet since the French Navy does not use such propulsion system”.

The AIP technology enables conventional non-nuclear submarines to stay underwater for over two weeks without surfacing to recharge their batteries, making them more efficient than the traditional diesel-electric submarines which must surface every few days.

IN’s 30-year plan to induct 24 submarines by 2030 was approved by the Cabinet Committee on Security (CCS) in 1999, but it was only in 2005 that the first contract for building six Scorpene conventional submarines in collaboration with DCNS (now Naval Group) was awarded to Mazagaon Dockyard Shipbuilders Limited (MDL) under Project 75.

While the last of these submarines is scheduled to be commissioned next year, the follow-on contract for building another six submarines under Project 75(I) is now facing headwinds because the MoD decided to acquire the submarines on a competitive basis under the Strategic Partnership (SP) model and the Naval Group’s decision to opt-out of the competition at a belated stage.

Introduced in 2016 by MoD, this model was intended to ‘institutionalise a transparent, objective and functional mechanism to encourage broader participation of the private sector, in addition to capacities of DPSUs/OFB, in manufacturing of major defence platforms, which included submarines, fighter aircraft, helicopters, and armoured fighting vehicles.

The SP model envisages parallel shortlisting of foreign manufacturers whose products meet the armed forces’ requirements and the Indian companies who could tie up with the former to make the product in India as prime vendors. The process of shortlisting the foreign and Indian companies is cumbersome and potentially contentious, but to its credit, IN managed to complete these processes without much difficulty.

The foreign companies shortlisted for Project 75(I) were Naval Group (France), ThyssenKrupp Marine Systems (Germany), Rosoboronexport (Russia), Daewoo (South Korea), and Navantia (Spain). As for the Indian companies, in a move that surprised many as it was not in keeping with the spirit of the SP Model, MoD shortlisted state-owned Mazagon Dock Shipbuilders (MDL) alongside the private sector conglomerate Larsen & Toubro (L&T).

Be that as it may, the Request for Proposal (RFP) for six submarines was issued to the two Indian shipyards last July, specifying that they could tie up with any one of the shortlisted foreign companies for the project. The bids were to be submitted by December 2021, but the deadline has been extended to June 2022.

The date for submission of bids was apparently extended because the Indian companies could not finalise the tie-up with the shortlisted foreign companies before the original deadline. This was probably because of the latter’s discomfort with the RFP conditions, as is the case with the Naval Group.

According to some unconfirmed reports, Navantia too has similar issues with the RFP, ThyssenKrupp is uncomfortable with the requirement of indigenous content in the submarines and the extent of liability of the foreign partner, and Daewoo wants some changes in the RFP conditions. None of these is good news as it is procedurally cumbersome, though not impossible, to make changes in the RFP. This leaves only Rosoboronexport (ROE) in the game.

Even if ROE can meet the AIP and other RFP conditions, the shortlisted Indian companies may be wary of tying up with it in the face of the mounting pressure on India from across the world to at least scale down the defence dealings with Moscow whose brutal and unjustifiable offensive in Ukraine has shocked the world and put India in a tight spot. Besides, the prospects of being sanctioned by the US and its NATO allies are too real to be ignored.

Some analysts are of the view that India may be able to persuade at least one foreign company to remain involved in the project, but they also fear that since in this situation only one of the two Indian companies will be able to tie up with the former and respond to the RFP, it will result in a single vendor situation.

Theoretically, it is possible to go ahead with this, or any other, project even in a single vendor situation, but for doing that MoD will have to convince itself after internal deliberations that the competition cannot be broadened by modifying the specified requirements, notably the need for the AIP system. The result of such an internal deliberation cannot be foretold.

At any rate, the situation that has come to pass points to the age-old problem of the services formulating unrealistic and ambitious specifications or, to use the formal jargon, Services Qualitative Requirements (SQRs). Prima facie, it also points to some error on MoD’s part in shortlisting the foreign companies.

The procedure prescribed for the SP model requires MoD to issue a Request for Information (RFI) to the foreign companies which can potentially meet the armed forces’ requirement to, among other things, elicit the information required for finalising the SQRs. Thereafter, an Expression of Interest (EOI) is issued to them detailing all requirements, including the range and depth of technologies to be transferred to the production agency in India.

It is inconceivable that while responding to the RFI, and later the EOI, all the five shortlisted companies misrepresented that they possessed sea-proven AIP technology. That being the case, it is unclear why the companies which do not have sea-proven AIP were shortlisted and why this requirement was included in the RFP. One of the main purposes of an RFI is to elicit all manner of information from the prospective suppliers that help in formulating a viable acquisition proposal. Evidently, it did not happen in this case.

Meanwhile, Defense Research and Development Organization (DRDO) has developed a modular AIP system that can be integrated with any conventional submarine, including the submarines already built under Project 75, though it may take some time to complete the trials and testing required to prove the seaworthiness of the system. This queer the pitch for Project 75 (I) as it is the government’s policy to give preference to indigenous products over foreign products.
India needs a Defense Minister urgently. We hardly see a problem solving approach from Defense Ministry after the departure of Late Shri Manohar Parrikar. After the procurement of 36 Rafales and induction of LCA MK1 and orders of LCA MK1 A there has been no visible movement in solving problems with other military equipment.

Order of LHDs is languishing, Minesweepers are nowhere in sight, P75I submarine program is on it's last breadth, MRFA project is a saga on it's own, Assault rifle procurement is a matter of musical chairs now. Appointment of a CDS is another example of the indecision. The list is long and we are the laughing stock all over the world. Our rival is churning out a full naval fleet in the time it takes us to decide.

Where is the ease and speed of decision making index for GOI??? It seems the GOI has forgotten that there are military issues begging their attention. Dithering on decisions has somehow become the norm in this term of Modi Govt.

In the meanwhile China, Pakistan, Bangladesh are shoring up their Naval capabilities. In 2014 we were talking about the lost decade of Defense modernization. It seems we are now staring at another one in making. Decisions taken or not-taken now will decide our standing and ability to protect our interests in coming next decade.

If PM Modi evaluates his cabinet ministers on performance, then the current incumbent has a pretty poor report card. Other than releasing lists after list of No-Import items or rushing to Russia for war stocks, there seems to be no other action.

So if someone at PMO ever reads these post, I beg them to wakeup and smell the coffee. Decision making is the first step, we will solve the budget issue when we come to that! We at minimum deserve a Defense Minister who proactively solves the issues. We need a strong military to be independent in our policies, foreign or domestic both. Please wake up before it is too late.

!!! Jago Mohan Pyaare Jago !!!
 

WolfPack86

New Member
Joined
Oct 20, 2015
Messages
10,571
Likes
16,993
Country flag
India to get French Shortfin Barracuda submarine under P-75I with DRDO AIP technology !!??
IgMp has earlier reported that several participants in the Indian Navy’s Project-75I submarine tender have withdrawn their names one by one for the Lithium-ion powered AIP tech transfer clause in the RFP.

But now, reports have emerged that talks have started between India and France that the French firm Naval Group should be hired as a technical consultant for the Project-75I to either use the Scorpene-class submarine as a base to develop a new line of submarine within the French technologies or India should purchase designs and tools to manufacture the Shortfin Barracuda submarines in India with maximum Indian made components so that India maintains Intellectual Property Rights of the design along with French assistance to incorporate Indian systems like DRDO developed AIP system and lithium-ion batteries if the Project-75I is executed with a technical consultation.

With Indo-French technologies with a proven design, it can become a reality at a much faster rate.
 

Super falcon

New Member
Joined
Nov 22, 2021
Messages
870
Likes
806
Country flag
India more likely go for Hyundai Korean submarine direct tech transfer of German U 214 sub made in korea given rights to sell them also Korea fitted them with their own sensors so they come cheaper and far better than french scorpene subs India can get
 

MonaLazy

New Member
Joined
Aug 12, 2019
Messages
1,321
Likes
7,898
Instead of reissuing tenders and repeating the process of negotiating, we should've gone for addition Kalvari's or a desi derivative of the larger S-BR variant.
Maybe that's not procedurally possible. You may call GoI whatever but it is a stickler for procedure, otherwise, this approach reeks of common sense & IN+MoD must have considered and binned it at some point in time.

Does the Kalvari order have any provision for follow on? Also, given how Indian Scorpene's secrets were leaked they would want to avoid the same OEM for any fresh/repeat order?
 

BON PLAN

-*-
New Member
Joined
Dec 24, 2015
Messages
6,510
Likes
7,217
Country flag
Maybe that's not procedurally possible. You may call GoI whatever but it is a stickler for procedure, otherwise, this approach reeks of common sense & IN+MoD must have considered and binned it at some point in time.

Does the Kalvari order have any provision for follow on? Also, given how Indian Scorpene's secrets were leaked they would want to avoid the same OEM for any fresh/repeat order?
No secret was leaked. It was only marketing datas and general specs.
And each sub as its own noise signature. A simple tolerance when machining the propeller and you have a noise modification...

No provision for follow on was taken. But all the tools are ready, the people trained... so it's the fastest option possible if India want to move fast.
 

swapcv

New Member
Joined
Jul 27, 2014
Messages
226
Likes
971
Country flag
Maybe that's not procedurally possible. You may call GoI whatever but it is a stickler for procedure, otherwise, this approach reeks of common sense & IN+MoD must have considered and binned it at some point in time.

Does the Kalvari order have any provision for follow on? Also, given how Indian Scorpene's secrets were leaked they would want to avoid the same OEM for any fresh/repeat order?
From what I know, its less to do with procedure, and more to do with expectations. They want a SSK that's a pseudo SSG and has AIP from the get-go. That's not possible as there are very few designs that have both and the only one operational is the Korean Dosan-Ahn Changho class SSK. Hence, in the interim, it would be prudent if the larger S-BR was put into production instead as that design has space available for more deeper modifications than the existing Kalvari and since it belongs to the Scorpene family will not be an issue for MDL to produce at a rapid pace as a possible P-75 Batch 2. Also, it will buy time for the Navy to figure out its P-75I procurement.
 

Tridev123

New Member
Joined
Jul 29, 2018
Messages
898
Likes
3,160
Country flag
More conventional submarines for the Indian Navy is justified.
I believe our present conventional submarine strength is grossly inadequate.
Both SSN's and SSK's are necessary. One cannot replace the other.
Do we need SSN's against the the Pak Navy, a navy which until recently was being compared to our Coast Guard. It would amount to using an sledgehammer to kill an ant.

Common sense suggests that any additional Scorpene subs built should be a better version of the baseline model. Probably bigger with VLS and AIP(why not install our own phosphoric acid AIP if it is made reliable). Till our Lithium Ion AIP model becomes viable.

Is AIP necessary?. Yes, I would think so. It is a force multiplier technology. The Chinese are using Swedish AIP technology(Sterling model). And most probably carrying out research on newer and more efficient AIP systems.

Also the capability to launch small unmanned underwater vehicles fitted with suitable sensors could become an pre requisite.

There have been reports of research on drone launches by subs and even enabling them to fire anti aircraft missiles to target anti submarine helicopters and slow moving maritime patrol aircraft.

But we must only choose technologies that are feasible for us to implement in the targeted time lines.

Have the French shared some amount of technology with India on noise reduction techniques in submarines. I believe that they are ahead of India in this field. Could be applied in our future SSN's designs.

Hope some course of action to improve our conventional submarine strength is chosen soon. Already many sections of society are becoming impatient with the lack of progress.
 

FactsPlease

New Member
Joined
Sep 12, 2016
Messages
201
Likes
406
Country flag
More conventional submarines for the Indian Navy is justified.
I believe our present conventional submarine strength is grossly inadequate.
Both SSN's and SSK's are necessary. One cannot replace the other.
Do we need SSN's against the the Pak Navy, a navy which until recently was being compared to our Coast Guard. It would amount to using an sledgehammer to kill an ant.

Common sense suggests that any additional Scorpene subs built should be a better version of the baseline model. Probably bigger with VLS and AIP(why not install our own phosphoric acid AIP if it is made reliable). Till our Lithium Ion AIP model becomes viable.

Is AIP necessary?. Yes, I would think so. It is a force multiplier technology. The Chinese are using Swedish AIP technology(Sterling model). And most probably carrying out research on newer and more efficient AIP systems.

Also the capability to launch small unmanned underwater vehicles fitted with suitable sensors could become an pre requisite.

There have been reports of research on drone launches by subs and even enabling them to fire anti aircraft missiles to target anti submarine helicopters and slow moving maritime patrol aircraft.

But we must only choose technologies that are feasible for us to implement in the targeted time lines.

Have the French shared some amount of technology with India on noise reduction techniques in submarines. I believe that they are ahead of India in this field. Could be applied in our future SSN's designs.

Hope some course of action to improve our conventional submarine strength is chosen soon. Already many sections of society are becoming impatient with the lack of progress.
No matter what we do, better fast... (as always, or our critical status)
 