We already launched the hulls of the four Project 15B class Destroyers.I was thinking , that can't we reduce numbers of 15b class from 4 to 2 or at best 3 and then direct the capital and other resources for project 18.
But project 18 should be indian Yamato
Kuch bhi math bole. If it goes as planned then 5 years for the first vessel from the time of the contract inked.btw how many years does it take for an IN ship to go from planning to induction? 20 years?
I think the last one, ins porbandar is in starting phase , why not make it a project 18 class , it has not been launched yet like vishakgapatnam or mormugaoWe already launched the hulls of the four Project t 15B class Destroyers.
Ya'll Nibbiars I think it was going to be launched this year but got delayed due to the Kung Flu Crises.I think the last one, ins porbandar is in starting phase , why not make it a project 18 class , it has not been launched yet like vishakgapatnam or mormugao
Ok it takes 10 years, atleast that's what Kolkata class took, from planning to commissioning in IN, ship gets ready in 5 years trials take another 5 years I think.Kuch bhi math bole. If it goes as planned then 5 years for the first vessel from the time of the contract inked.
INS kolkata was another story. INS Visakhapatnam was laid in late 2013 and would be inducted within five to sic year but got delayed due to the damn foreign supplier and Kung Flu Virus. But now most of the Sub and important systems can be build in the domestic. So we can easily say it to be inducted fast. Then see the fast development of the Project 17 B since it was laid in late 2017 it already on the commission in early 2022. The modular construction, Inhouse design and Important system be Indigenous has made the construction of the naval vessels faster.Ok it takes 10 years, atleast that's what Kolkata class took, from planning to commissioning in IN, ship gets ready in 5 years trials take another 5 years I think.
Depends on money flow & design tweakings demanded during the process... Normally 5-7 years.btw how many years does it take for an IN ship to go from planning to induction? 20 years?
They'll say lack of funds and cancel the project altogether. Just like INS vishal.btw how many years does it take for an IN ship to go from planning to induction? 20 years?
That's the problem sir, inking the contract. Things should proceed smoothly *after the contract is signed*. Babus can come up with any number of excuses to delay above...Kuch bhi math bole. If it goes as planned then 5 years for the first vessel from the time of the contract inked.
PROJECT 18:INDIA’S NEXT GENERATION DESTROYER
Project-18 class destroyers will have following armaments
Ballistic missiles and hypersonic Bramhos-II:
I mean, SERIOUSLY????The next generation of point missile defense capable of launching Brahmos II will be worked upon.
The Electromagnetic Railgun:
Electromagnetic gun replacing the famed Otobreda of Indian Navy, will be supported with laser based CIWS, in works in LASTEC of DRDO. The warship will be deployed with 300 kW of laser system, capable of shooting down the aerial threats. The planned CIWS will draw inspiration from the present Phalnax CIWS and have its own radar. Indian Army has also expressed interests in the project, for it wishes to mount laser based systems on its combat vehicles. Additionally, the warship will also be equipped with small 100 kW laser based weapon systems with faster charging rates and continuous rate of application.
Laser-based CIWS
It is being developed by DRDO’s Laser Science and Technology Centre, Delhi will employ 300 kW of laser system enough to take out any aerial threat. It will have its own radar. In addition, the warship will have a smaller 100kW laser too.
Ya'll Nibbiars Bharmos 2 believable, even rail gun is believable if the Destroyers has Intergated Electric Propulsion. But CIWS Laser? Some body is cooking pulao made in dreams.Someone took defenceupdate site too seriously on it.
I mean, SERIOUSLY????
Among all, only BRAHMOS-2 is realistic. Not even the Rail-Gun.Ya'll Nibbiars Bharmos 2 believable, even rail gun is believable if the Destroyers has Intergated Electric Propulsion. But CIWS Laser? Some body is cooking pulao made in dreams.
Ya actually I meant the railguns as upgrade not as built as. But yes Bharmos 2 is highly likely to be Intergated with the Project 18 Class Destroyers.Among all, only BRAHMOS-2 is realistic. Not even the Rail-Gun.
One of the reason is late order of 127mm Bae naval guns from Indian Navy. P-17B frigates will receive them on time but P-15B destroyer will not. Additional weapon or system procurement should move parallel with ship construction. Modular construction will surely help in commissioning Navy ship faster.INS kolkata was another story. INS Visakhapatnam was laid in late 2013 and would be inducted within five to sic year but got delayed due to the damn foreign supplier and Kung Flu Virus. But now most of the Sub and important systems can be build in the domestic. So we can easily say it to be inducted fast. Then see the fast development of the Project 17 B since it was laid in late 2017 it already on the commission in early 2022. The modular construction, Inhouse design and Important system be Indigenous has made the construction of the naval vessels faster.
Never lol, that's what the babooze, polticos and top brass think.I wonder when we will actually be using these weapon platforms... Not just operating, using, for its intended purpose.
How about this but with Rail Guns.the true legendary IOWA class battleship. Nothing can survive those 16' inch guns. it fires 1 ton projectile 40 km away.
we need similar kind of battleship but those 16 inches be replaced with rail guns.
View attachment 64002
we need a ship that can enter the ring and take few punches like a true boxer but still deliver the final knock out blow.How about this but with Rail Guns.
View attachment 64003
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
Next Generation Fast Attack Crafts | Indian Navy | 1 | ||
ISRO's Project Soorya - Next Generation Launch Vehicle (NGLV) development program | Indian Space Program | 108 | ||
Next Generation Fast Attack Craft | Indian Navy | 3 | ||
Next Generation Frigates (NGF) | Indian Navy | 20 |