abingdonboy
Senior Member
- Joined
- Sep 13, 2010
- Messages
- 8,039
- Likes
- 33,588
Nope, they are all free to use their own designsManufactured by different firms but it will be same I guess.
Nope, they are all free to use their own designsManufactured by different firms but it will be same I guess.
Has RVNL officially stared they are using the ICF design?Of course we'll get different trainsets.
Alstom ones will be made of aluminium and have sleeper coaches also. Everything from bogie to design will be different.
As for RVNL-TMH, they'll use existing VB design but with different interiors. Titagarh/BHEL haven't confirmed anything yet.
is this the one where there were a lot of protests?Big L for Dubai, Columbo, Singapore and Malaysia. Even bigger L for them would be the Great Nicobar Island Transhipment Port Complex.
Yesis this the one where there were a lot of protests?
so the whole port development is going ahead or is some part of it still blocked from development?
Going on smooth, even kerala commie government is supporting the project.so the whole port development is going ahead or is some part of it still blocked from development?
So we have this.Update on work on Mumbai Metro Line 2B Train station and the Bullet Train station at BKC.
View attachment 209352View attachment 209353View attachment 209354View attachment 209355
are we ever gonna get any undergoud metro or its all going to be overhead?
Elevated is cheaper and doesn't cause problems for traffic during construction.are we ever gonna get any undergoud metro or its all going to be overhead?
Isn't underground now mostly done with tbm?Elevated is cheaper and doesn't cause problems for traffic during construction.
Still, elevated is better.Isn't underground now mostly done with tbm?
HSR is standard gauge.So we have this.
High speed Rail: Broad Gauge
Standard Indian Rail: Braod Gauge
RRTS: Standard Gauge