Indian nuclear submarines

SajeevJino

Long walk
Senior Member
Joined
Feb 21, 2012
Messages
6,017
Likes
3,364
Country flag
does PM even has an official FB page...?? to what i know PMO is only on twitter or i missed something...!
The twitter account linked with FB page is verified one ..But the FB link is Verified one

like this

 

sayareakd

Mod
Joined
Feb 17, 2009
Messages
17,734
Likes
18,952
Country flag
INS Arihant reactor goes critical

India joins an elite club of five to have nuclear-powered submarine; pressurised water reactor will generate about 80 MWt.

The reactor on board India's nuclear-powered submarine, INS Arihant, reached its first criticality at 1.20 a.m. on Saturday, capping 25 years of indigenous efforts in this advanced, technologically challenging area. The main challenge lay in making the reactor compact enough to fit into a submarine, apart from ensuring its stability when the submarine accelerated the depths of the sea. Arihant is about 111 metres long, 11 metres broad and about 15 metres tall.

Arihant's reactor reached its criticality when the boat was "already in the sea". It is a pressurised water reactor (PWR) that will propel the nuclear-powered submarine. The reactor uses enriched uranium as fuel, and light water as both coolant and moderator. It will generate about 80 MWt. The submarine will be fitted with K-15 underwater fired missiles, which can take on targets 700 kms away. The K-15 missiles, which will carry nuclear warheads, are already under production.

India is building three more nuclear-powered submarines at Visakhapatnam as part of its programme to shore up its strategic programme and second strike capability. India is now a member of the exclusive club of five countries—U.S., Russia, the U.K., France and China— that already possess nuclear-powered submarines.

Arihant is a joint effort of the Department of Atomic Energy (DAE), the Defence Research and Development Organisation (DRDO) and the Navy. The Bhabha Atomic Research Centre (BARC), Trombay, which is the DAE's nerve-centre, played a pivotal role in designing and developing the PWR that powers Arihant. An identical PWR of the same capacity has already been operating on the shore of Kalpakkam, Tamil Nadu, from September 2006. The enriched uranium for both the reactors comes from the DAE's Rare Materials Plant (RMP), near Mysore.

Ariant's reactor and its twin at Kalpakkam are forerunners to the DAE building massive indigenous 900 MWe commercial PWRs in the country, which are already in the advanced stage of design.

R.K. Sinha, Chairman, Atomic Energy Commission (AEC), was upbeat about Arihant's nuclear-powered reactor going into operation. Mr. Sinha told The Hindu: "It is really a demonstration of very advanced technological capability in the challenging areas of nuclear reactor design, manufacture and commissioning. I am proud that this big effort has resulted in the reactor reaching first criticality. It is a moment of jubilation for the entire nuclear energy sector in the country, which has worked hard to make a reactor of this type."

The reactor on board was different from the reactors in the nuclear power stations in terms of compactness, safety parameters and the conditions at sea which it would encounter, Mr. Sinha said.

S. Basu, Director, BARC, who was one of the architects in building the Arihant's reactor, described the reactor reaching its first criticality as "a big achievement in terms of our defence preparedness and a follow-up to the PWR plant that is already operating at Kalpakkam". In building the PWR that propels Arihant, he said, "the Kalpakkam experience has been made use of here".

Mr. Basu added: "Everything went smoothly and as prescribed and predicted. A thorough preparation was done for the event to be conducted in a phased and disciplined manner, following all the safety stipulations." The BARC Safety Council gave the thumbs-up for the criticality.

Asked when Arihant's sea trials would be done, Mr. Basu said, "The boat is already in the sea. From now on, all trials will be sea trials." He explained that with the boat's reactor reaching first criticality, physics experiments on the reactor would be done. Step by step, the power output from the reactor would be increased. The reactor's primary system had been proven now. Next, the propulsion system, that is, the secondary system would be proved. "Once the propulsion system is proven and made operational, we will go for sea trials," said Mr. Basu, who was the Project Director of the PWR at Kalpakkam.

Mr. Sinha who is also the DAE Secretary, asserted that "the Indian industry has come of age in the manufacture of the PWR vessel, which has been used in Arihant's reactor". There were many other important systems and components which had gone into the reactor, which were completely indigenous and manufactured in India, he said.

It was on July 26, 2009 that Prime Minister Manmohan Singh's wife Gursharan Kaur broke a coconut to name India's first nuclear-powered submarine "Arihant", meaning destroyer of enemies, and launch it at the Naval Dockyard at Visakhapatnam. On that day, the Prime Minister specifically thanked "our Russian friends for their consistent and invaluable cooperation, which symbolises the close strategic partnership that we enjoy with Russia."

The project, originally called the Advanced Technology Vessel (ATV) programme, had its genesis in 1984-85 but active work on it began in the late 1990s.

Keywords: INS Arihant, nuclear reactor, activation, nuclear-tipped missiles
INS Arihant reactor goes critical - The Hindu
 

arnabmit

Homo Communis Indus
Senior Member
Joined
Dec 25, 2012
Messages
6,242
Likes
7,522
Country flag
@Decklander

ATV1-ATV4, all 4 Arihant Class would be dedicated SSBN with the 80Mw reactor?

Follow on subs (Arihant follow-on Class, maybe ATV5 onwards) would be all SSN hunter-killers with the bigger 150Mw reactor or would they be a mix of SSN & SSBN?
 
Last edited by a moderator:

arnabmit

Homo Communis Indus
Senior Member
Joined
Dec 25, 2012
Messages
6,242
Likes
7,522
Country flag
Salient points of INS Arihant nuclear sub

Salient points about INS Arihant, India's first indigenous nuclear submarine, and the reactor on board that went critical Saturday, paving way for deploying the vessel after sea trials.

  • The miniature nuclear reactor on INS Arihant went critical at around 2.30 a.m. as the submarine went out to sea trials
  • Once INS Arihant is inducted, India will join the US, Britain, France,Russia and China by having such technology and prowess
  • The 83 MW pressurized light-water reactor was made critical after several "checking and re-checking" of thousands of systems
  • The 6,000-tonne submarine is built at the ship-building centre at Visakhapatnam
  • During sea trials, various systems on board Arihant will undergo vigorous checks, including firing of its 750-km range K-15 ballistic missiles.
  • Sea trials will take at least another 20 months before INS Arihant can become fully operational.
  • The 82.5 MW nuclear reactor has been designed at Kalpakkam by PRP Centre – PRP originally stood for Plutonium Reprocessing Project – under the BARC.
  • In case of nuclear attack, the submarine will provide second-strike capability.
  • INS Arihant is jointly being developed by the Navy, BARC and the Defence Research and Development Organisation (DRDO) at the Visakhapatnam naval dockyard.
  • Being nuclear-powered, the submarine will not have to surface for two months to breath, like conventional vessels have to.
  • The project, earlier known as the advanced technology vessel (ATV), has been under development since 1998.
  • The submarine reactor was developed from a land-based prototype located in Kalpakkam, around 70km from here.
 

Bheeshma

Regular Member
Joined
Aug 22, 2012
Messages
916
Likes
384
Is the Akula class SSN actually wider than Arihant? Is it because of the smaller reactor on the Arihant?
 

rohit b3

Regular Member
Joined
Oct 25, 2012
Messages
818
Likes
1,402
Country flag
Salient points of INS Arihant nuclear sub

Salient points about INS Arihant, India's first indigenous nuclear submarine, and the reactor on board that went critical Saturday, paving way for deploying the vessel after sea trials.

  • The miniature nuclear reactor on INS Arihant went critical at around 2.30 a.m. as the submarine went out to sea trials
  • Once INS Arihant is inducted, India will join the US, Britain, France,Russia and China by having such technology and prowess
  • The 83 MW pressurized light-water reactor was made critical after several "checking and re-checking" of thousands of systems
  • The 6,000-tonne submarine is built at the ship-building centre at Visakhapatnam
  • During sea trials, various systems on board Arihant will undergo vigorous checks, including firing of its 750-km range K-15 ballistic missiles.
  • Sea trials will take at least another 20 months before INS Arihant can become fully operational.
  • The 82.5 MW nuclear reactor has been designed at Kalpakkam by PRP Centre – PRP originally stood for Plutonium Reprocessing Project – under the BARC.
  • In case of nuclear attack, the submarine will provide second-strike capability.
  • INS Arihant is jointly being developed by the Navy, BARC and the Defence Research and Development Organisation (DRDO) at the Visakhapatnam naval dockyard.
  • Being nuclear-powered, the submarine will not have to surface for two months to breath, like conventional vessels have to.
  • The project, earlier known as the advanced technology vessel (ATV), has been under development since 1998.
  • The submarine reactor was developed from a land-based prototype located in Kalpakkam, around 70km from here.

20 months of Trials??
 

Dinesh_Kumar

Regular Member
Joined
Jun 20, 2013
Messages
518
Likes
231
Sir, did not know about double hull on Arihant......most subs are single hull these days, assumed same here as well.....

I also assume steel is HY-80, which we make here, and was qualified by USN for nuclear use, most subs using HY-80 qualified to 300 feet depth

U mentioned Sonar, i assume USHUS Sonar as part of Panchendrya (spelling!!) Sensor Suite, corrrect? Is more advanced than CSF-Eldone used on HDWs during mid life upgrade?

Making lot of assumptions as limited info on Arihant.......
I did not want to say it in so many words
 

Decklander

Senior Member
Joined
Nov 19, 2012
Messages
2,654
Likes
4,111
Sir, did not know about double hull on Arihant......most subs are single hull these days, assumed same here as well.....

I also assume steel is HY-80, which we make here, and was qualified by USN for nuclear use, most subs using HY-80 qualified to 300 feet depth

U mentioned Sonar, i assume USHUS Sonar as part of Panchendrya (spelling!!) Sensor Suite, corrrect? Is more advanced than CSF-Eldone used on HDWs during mid life upgrade?

Making lot of assumptions as limited info on Arihant.......
We have made significant progress in sonar tech and we produce some of the best ones in India. The Arihant class has Indian Sonar of the same class as mentioned by you.
 