What about the new Variant is it still going to happen or discarded , and the one named train 20 , was supposed to be aluminum based ,faster with speed of 200 km ph
I would like to ask , why don't we do some land acquisition and straighten up the curves while repairing the tracks of important section , will help increasing speed , also as we are now using better rail tracks , and one teat track is coming up in Rajasthan , shouldn't we start preparing for train speed above 250 kmph on existing track , more than that is not possible not required , but this speed will be enough to chain our transportation sector , not all trains need to be high speed