Dessert Storm
Senior Member
- Joined
- Sep 8, 2020
- Messages
- 1,675
- Likes
- 5,868
Methodology for the steady pressure measurement on the surface of the wind tunnel model of the objects.
From that new missile tracking ship and is it Barak-8?Also soon lrsam will be tested from a navy ship. From itr Chandipur
I forgot to note the time of the brahmos test.......its around 9.30 to 10am
Lrsam will be tested means it's Barak 8.......From that new missile tracking ship and is it Barak-8?
Any news about the HGV-202F by HTNP Industries?
It was said that the test would be conducted soon.
These guys seem fake.
Who knows what these guys are upto. But they do have a twitter account. Also they have a linked in profile which says that they are building missiles and hiring engineers. One of the guys even has a researchgate profile which listed some research articles on missiles.These guys seem fake.
I had all those schematic diagrams.,also shared hereI was looking into Nag Helina Dhruvastra
Though all of them share similarities, all 3 of them are different internally especially in terms of thrust management.
Would look to look into dhruvastra schematics when available
They're fake once they claimed to be making a missle with range 40k km and speed 30 mach around something later deleted though.