ram singh तोपची
New Member
- Joined
- May 2, 2019
- Messages
- 177
- Likes
- 256
now india is Koreas new weapon buying bitch.............................................
now india is Koreas new weapon buying bitch.............................................
He deleted, but link still available in your quote.I suggest delete the link you posted if you want to watermark your pics .
Do this
First delete the above link
Then download addtext app from Google Play
It is easy to use and you can resize the pics , edit the pics , watermark the pics
Then upload the resized pics with your watermark here directly
Easy peasy and no need of posting it first on an image hosting site and then linking it here.
Doesn't look like AK203, looks like the 103.AK 203 , Indian Russian Rifles Private Limited
But Indian Russian Rifles Private Ltd are(were hopefully) to make those rifles in Amethi! Meaning if the deal works out, this is what we'd be getting .
This butt must be replaced with a telescopic adjustment oneBut Indian Russian Rifles Private Ltd are(were hopefully) to make those rifles in Amethi! Meaning if the deal works out, this is what we'd be getting .
Let's see, this isn't what they showcased before.But Indian Russian Rifles Private Ltd are(were hopefully) to make those rifles in Amethi! Meaning if the deal works out, this is what we'd be getting .
They are superior to my country because my country is a socialist hellhole.Russian & Chinese are both superior to your country in military tech --- you rely on west & Russian for critical technologies
They all come from DRDO because DRDO was and is the only R&D organisation allowed to delve into the various defence related sectors, don't conflate private orgs not being allowed to do the same for them not having the capacity to.---- domestic one come from DRDO a govt institute ---- all India Pvt tech is foreign ---- indigenous my foot
Nope.---- a decade down the line these chomus will keep screw driving & keep passing foreign maal as their own --- but as long as crook politician, beurocrates, military people keep getting their hafta it will be ok --- Desh jaye Tel lenay.
Seems the DRDO as development agency outsourcing to private's for production model is coming along very nicely and is expanding to most areas, can't think of the last project that DRDO gave production contracts to a PSU.Naval systems .................................
NSTL Sahayak
View attachment 42876
DRDO MAAREECH
View attachment 42877
View attachment 42879
DRDO NSTL MIST
View attachment 42878
Low Frequency Dunking Sonar
View attachment 42880
NSTL AIP
View attachment 42887
USHUS Sonar Suite
View attachment 42888
L&T AMOGH
View attachment 42889
DRDO AUV
View attachment 42890
12? That's going to take quite a bit of time. I'm sure the crash of the 6th set them back quite a bit but this is still quite a way away from entering service it seems.Someone was asking for update on Rustom-2
==========
Rustom-2 UAV Update:
* Seventh prototype to take first flight soon (Sixth prototype crashed during testing on Sep 17, 2019).
* 15 Prototypes planned. Five of them will be pre-prod which will be tested by the user.
* Army has shown a requirement of 60.
This is for the 12 HPR for IAF that DAC cleared some time back? I thought that was a DRDO design only?L&T IAI HPR (they are currently building one for Airforce it seems)
What a system! That the radars are all solid state and there are few masts to raise really proves this is a quick reaction system. Almost all other comparable systems have significant moving parts- most of them have masts to raise too.QRSAM and MRSAM
What issues did they have?Regarding the MRSAM this is the new configuration
The army was not satisfied with the first one after deployment , so they sent it back with recommendations to change many of the features to make it more user friendly.
So DRDO has now dumped it as a multi-cal chambered it for 6.8mm and labelled it AAR. I guess they are waiting for the next IA mind change when they suddenly realise they now want the 6.8 round.Didn't knew it got up to the twitter,I uploaded the same on Instagram then someone posted it on Facebook...
View attachment 42987
Sent from my RMX1851 using Tapatalk
Seems the DRDO as development agency outsourcing to private's for production model is coming along very nicely and is expanding to most areas, can't think of the last project that DRDO gave production contracts to a PSU.
This is for the 12 HPR for IAF that DAC cleared some time back? I thought that was a DRDO design only?
https://www.drdo.gov.in/sites/default/files/inline-files/high-power-radar.pdf
@porky_kicker
Going through this thread I think it's abundantly clear that all the ingredients are there to develop an indigenous P76 SSK class. Have utterly ZERO idea why procurements like KA-226, Carbine, AK203, P75(I), MMRCA 2.0, FRCV (maybe) etc are going ahead when there is ample ability to create suitable products in India for each requirement.I was surprised when i found AIP in L&T stall and i asked the person there why do you put an AIP scaled model when you don't have one ? That's when he explained the entire NSTL AIP which Indian navy wanted to put in Kalvari class was completely built by L&T . Then i asked him if P75i goes through then L&T will build these AIP ? He said it purely depends on the AIP indian navy decides to have in its ship if its NTSL one then it will be L&T
We can completely cut our imports in infantry soldier equipments, small arms, artillery, armoured vehicles, SAM's, etc.Going through this thread I think it's abundantly clear that all the ingredients are there to develop an indigenous P76 SSK class. Have utterly ZERO idea why procurements like KA-226, Carbine, AK203, P75(I), MMRCA 2.0, FRCV (maybe) etc are going ahead when there is ample ability to create suitable products in India for each requirement.
Without any evidence I'm reluctant to say so but corruption/kickbacks can be the only logical answer. It's not like these off the shelf deals go through without any issue and the products are in service within 3-4 years, no the time it takes to trail, negotiate and order these foreign systems is as long as it would take for Indian substitutes to be readied.
I've said it before and I'll keep saying it- by 2025 (maybe even earlier in many areas) most requirements of the Indian services could easily be covered by Indian equipment. There should be a policy announced that articulates this instead in many places Indian generals and babus are tying India down into another generation of imports.
.
Have utterly ZERO idea why procurements like KA-226, AK203, etc are going ahead when there is ample ability to create suitable products in India for each requirement.
Okay so I believe this question must have been answered earlier but I couldn't figure it out hence here I am at it.
Why is MWF a single engine fighter. Because one of the main problem IAF raised was about the thrust of F-404 that it wasn't enough. Now MWF has F-414 with increased thrust but then LCA thehas also become MWF now and so the question that still remains whether that single engine will be able to satisfy the needs of air Force and especially Navy?
And why is it not a twin engine like the other aircrafts of similar configuration and roles?
Sir, There is a picture going around, Sudden appearance of a M2 B HMG at a ofb stall. Do you have better and clearer picture of that ?DARE FADEC
View attachment 43013
DEAL AEW&CS Data Links
View attachment 43014
DHRUTI MRFU
View attachment 43015
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
DEFEXPO-2022 | Defence & Strategy | 1248 | ||
Questions to be asked during Defexpo 2018 | Defence & Strategy | 11 | ||
Defexpo 2018 | Defence & Strategy | 446 | ||
Defexpo India 2016 | Defence & Strategy | 215 |