China Economy: News & Discussion

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
how come I wouldn't know it as a PLAN? I wasn't living in information cocoon as you.
1714277942140.png


ISRO has a track record of hitting all milestones +/- 12 months. Whatever China has achieved is not impossible. For India it has just been a matter of prioritization and funding. Indians have been building complex tech at NASA for decades.

Maybe I should introduce you to NASA's CTO:

 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
The Cyrogenic engine is used in the upper stage. The bulk of the lift will come from stage 2.
  • A L-400 semi-cryogenic core stage, with 400 tonnes of propellant, using a cluster of five SCE-200 engines;
 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
I think you are conflating stages and the role of each stage between the two countries.
 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
SCE-200 is traditional LOX/Kerosene. It's not cryo. As of Apr 2024, SCE-200 hasn't done any full system hot fire test.
Hey I don't want to make you look foolish but you keep digging deeper. What matters is payload to orbit not the thrust of a specific engine. I can make a heavy ass rocket with a bulky engine and claim victory, but it doesn't matter if my payload is the same as an Indian engine with a sleeker and slimmer design. You need to evaluate based on payload capacity to different orbits not engine thrust.
 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
Let's compare payload size:

NGLV:

17,000 to 48,000 kg to LEO
8,500 to 24,000 kg to GTO
7,000 to 22,500 to TLI

LVM3:

10,000 kg to LEO
4,300 to GTO
3,000 to TLI

Long March 5:

25,000 kg to LEO
14,000 kg to GTO
9,400 to TLI
5,100 to GEO
 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
As I said NGLV is a plan It won't be realized by 2035. Long March 5 has been in service for 8 years. You may not know Long March 10 with payload capacity of 70 t to LEO is gonna take a test flight in 2027.
We can start with LVM3. I don't get your point. Modular capsules can be launched for the Indian space station using it's current capacity. You just sound dumb without rational thought.
Screen Shot 2024-04-27 at 9.45.59 PM.png
 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
As I said NGLV is a plan It won't be realized by 2035. Long March 5 has been in service for 8 years. You may not know Long March 10 with payload capacity of 70 t to LEO is gonna take a test flight in 2027.
Long March 10 is only 2x better than NGLV. So I don't see your point about India not being able to build in space. Your original assertion was that India won't be able to build a space station. However I gave you evidence to the contrary. Now you are just word vomiting and changing goal posts.
 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
by the way long march 5 weighs 851K kgs.

NGLV will weigh 600K kg weight and will outperform the Long March 5. If you think China is a class ahead of India, show me a rocket with a better thrust to weight ratio with that lift capability.
 

srevster

Senior Member
Joined
Nov 10, 2020
Messages
3,017
Likes
5,585
Country flag
When did I make that post? I just said Indian space station won't be realized by 2040 and it will only has mass of 20T, less than 1/5 of current Chinese space station.
Lol the first phase of the space station will be finished by 2035. The first launch of a module is in 2027.
 

Global Defence

Articles

Top