official open date is set to December 26, railway inspectors conducting close inspection, yellow river, henan.
HSR running under heavy snow, total length of Beijing_Guangzhou, 2298KM, with 150 pairs of transits. design speed 350km/h, will test run at 300km/h in the first stage.
from Beijing to Guangzhou will take about 8 hours, basically you can enjoy a diumsum breakfast in Guangzhou in the morning and Beijing Duck for your dinner in Beijing.
Last edited: