brahmastra11
New Member
- Joined
- Apr 26, 2013
- Messages
- 206
- Likes
- 159
Can you explain more about Ratan Tata intervention in saving LCA project
Indian Air Force :: HAL and the Indian Aviation Industry
Food for thought for MOD, if it wants to seriously retain valuable talent here, because I faintly remember that one DFI technocrat in particular posting that salaries for the present scientific workforce under the government was more than enough, Unfortunately the author does not think so.
But this is what IAF is doing by placing 20 plus 20 plus 80 order batches for IAF . The article writer is a retired test pilot of HAL.
He stresses the importance of high volume order to develop higher level production standards and efficiency with lower cost .
While IAF and IA follow the same principle for large import orders with foreign vendors , it does the opposite with local production
and less said the better about the IA order numbers for Arjun.
it would be possible only if higher volume orders are given for Arjun or Tejas. Because you won't expect any private sector firm to invest in production line and tech for 20 plus 20 plus 80 orders spread over a decade. It is a waste of resource and time for them.
So IAF will continue to lament about the production quality at HAL and lack of private participation , without even realizing it is their actions that leads to this sorry situation. In the combat theater LCA in it's mk-2 version can do most of all what RAFALE can do because both have the sane TWR, same RSS delta design and will have almost the same ITR and STR.
And we have to see whether RAFALE can achieve all it's top specs in indian hot and humid weather conditions. Certainly it won't as experience already has shown. Su-30 MKI , Mig-29 and LCA tejas all have the same top speeds at Indian hot and humid weather conditions in skies over GOA as the official press release suggest.
With ever increasing chinese PLAF numbers having LCA mk-2 in more than 200 hundred numbers is a basic requirement and it will also stimulate a huge interest among local big private players to get into defence production leading to massive increase in quality control issues.
By givin 20 plus 20 plus 80 order nothing of this sort w9ill ever happen.
So there is nothing wring in giving 250 plus order number for Tejas mk-2
Why this engine development was not funded is a serious mystery, However recent Wiki leak revealations exposing that a son in law of the former IAF chief and princes of ruling dynasty were the chief lobyists for the tender that killed the Marut will definitely provide the motivation in ruling circles not to fund the orpheus 12 engine development.
This mysterious decision lead to destruction of HAL's design capabilities and flight of Kurt Tank led design team,
Only after seeing this sorry state of affairs the scientific elite of the country including many from ISRO, DRDO , to carve out the design team from HAL into ADA and the result today is LCA is about to enter into service .
During the United front government the decision to close the LCA program was almost taken and it was the intervention of Ratan TATA which saved the program.