- Joined
- May 3, 2010
- Messages
- 251
- Likes
- 52
Last edited by a moderator:
the rights of manufacturing 58% of the airframe only is still the first batch order.
New CNC's are being setup in PA kamra for complete mass production
paf will pay themCross-posting from another thread.( @sayareakd's post)
http://defenceforumindia.com/forum/...-defence-budget-15-per-cent-3.html#post746567
Is PAC under defense production division?
If yes, could our Pakistani members explain why there is substantial down-gradation in the revised budget?
With such low budget what was PAC doing in 2012-2013? Trying to find excellency in paint job?
You guys always live in future. No one has answer my question.83% of production including Block II/III is projected to be transferred to PAC by 2016. Only imported parts will be WS-13/RD-93D from China or RD-93MA from Russia if that deal goes through along with some other components that we don't build at PAC. All in all, this project is going to benefit our "paint ship" greatly in industrial knowledge.
i am not getting your question.please be more clearyou guys making 58% frame from Raw material ? BTW how much is % of frame in the total aircraft ?
Is PAC Kamra under PAF?paf will pay them
they are..this is the reason JFT is considered the only aircraft in the world to be designed and developed under JV by an air forceIs PAC Kamra under PAF?
So, it was your air-force who funded the JV for the tablet PAC-PAD1they are..this is the reason JFT is considered the only aircraft in the world to be designed and developed under JV by an air force
PAF has the funds and they pay the PAC for JFT.So, it was your air-force who funded the JV for the tablet PAC-PAD1
PAC-PAD 1 - Wikipedia, the free encyclopedia
good.
Army manufactures cement, fertilizers, Air-Force manufactures tablet, pc and what will navy do? fish for sea cucumber in Arabian sea?
Yes, we know thatPAF has the funds and they pay the PAC for JFT.
Indians joys are short lived as usuall
What does your last post say?Indians joys are short lived as usuall
please read the last page posts by me.
most important when under funds cuts we manage such what about this govt and the release of funds