sayareakd
Mod
- Joined
- Feb 17, 2009
- Messages
- 17,734
- Likes
- 18,952
Cant comment on Col Sir, he is more than a friend now.@sayareakd One more report this one shared by Col in twitter today ..This shows possible operational time of Agni 4 & 5 is 2020...So that means we cannot hit Beijing today if they nuke us ...Why are these reports always contradict one another ..But one this is clear as of now we have 120 Nuclear warheads with Agni 4 & 5 we will cross 150 and with K series we will cross 200 hopefully by 2020...
View attachment 17540
Buy i can comment on few things in the attachment for A5 TEL.
Since it all available in open source, let me post it here, to show the data is incorrect.
this is the TEL or Special purpose trailer but it is actually called transporter cum tilting vehicle
this TCT was given to local company to make the same.
They got order prior to 48, ( A5 will be operational in 2015), first trailer was to be made in 21 week and thereafter 1 trailer every 13 weeks. This interview was posted in June 2015.
this means by now they must have made at least 8-12 trailer (road base), if not more
This is what they make
This is only road base trailer, i already posted duel based, few posts before
here is rail based A5 TEL
(assuming that the order is almost same of 48 for all three design)
So sum total of this is as on today is 12X 3= 36 on higher side and 8 X 3 = 24 on the lower side in terms of TEL. Just for the records i think that A3 to A5 has same TEL for railway. So that number could change for bigger number.
I would have love to posted the new rail design, screen shots from youtube video posted by someone innocently, which i had deleted long time back. All i can say it looks like normal compartments of Indian railways. So our enemies have very long search to do to find them. :biggrin2: I called it Agni train. and it has Mach speed :bounce: