By through any app ???For Bharat rakshak you need to have paid email ID. For Strategic frontier no such things required. But for freedom of speech this is best place.
Any link how can joining ???
Sent from my Alfa L using Tapatalk
By through any app ???For Bharat rakshak you need to have paid email ID. For Strategic frontier no such things required. But for freedom of speech this is best place.
Lsp4 has some more flight s...View attachment 35949
LSP2 seems to have hit the stride with regular flights. Uttam news should be coming soon.
4500+ flights done.
Source- Ada
HAL union is already on strike taking Tejas away from them and they will have heart attacks ( which may turn out to be a good thing lol.)I am very worried about slow action on Tejas. I do not know what is stopping Govt from privatizing Tejas project.
Tejas needs to move to private sector now.
What means slow action....I am very worried about slow action on Tejas. I do not know what is stopping Govt from privatizing Tejas project.
Tejas needs to move to private sector now.
Bhai......patriots, production rate is too low. Three years taken to deliver 18 SPs. HAL production rate is supposed to be 16 per year now. But no unit has been delivered in April-June quarter.
Time has a price of its own...Bhai......
Production rate is slow....I believe too....
But think from Hal's perspective...,.for more production hal will have to invest more manpower ....which will raise Tejas cost . Which is iaf not eager to pay.......
After all hal is a psu...think s about the profit....
Bdw . At this pace hal will deliver all foc .Before mk1a production.... which is 2022 (expected )..
Better iaf should order more foc ....with condition of less production time.....
HAL workers are on strike so that might have something to do with it.patriots, production rate is too low. Three years taken to deliver 18 SPs. HAL production rate is supposed to be 16 per year now. But no unit has been delivered in April-June quarter.
Baith Ke Muth maare saale reservation quota Chaaps, par Saare 40 LCA TEJAS ab tak deliver kar dete. At least IAF would have got 2 sqdns of operational fighter more by now. That would have also put pressure on IAF and government to order more. BoseDk Kam ke na kaaj Ke 100ton Anaj Ke. Gaand Pe Goli Maaro saalon ke...If they manufacture 16 per year, what will the workforce do after 1.5 years?
When foc has only been given in Jan 2019, how could they have delivered 40 by now, specially when the trainers are also foc standard.Baith Ke Muth maare saale reservation quota Chaaps, par Saare 40 LCA TEJAS ab tak deliver kar dete. At least IAF would have got 2 sqdns of operational fighter more by now. That would have also put pressure on IAF and government to order more. BoseDk Kam ke na kaaj Ke 100ton Anaj Ke. Gaand Pe Goli Maaro saalon ke...
With a measly order of 40 units only HAL can't invest in more production lines and hence slow and gradual increase in production.patriots, production rate is too low. Three years taken to deliver 18 SPs. HAL production rate is supposed to be 16 per year now. But no unit has been delivered in April-June quarter.
You are wrong.With a measly order of 40 units only HAL can't invest in more production lines and hence slow and gradual increase in production.
They should've put an order of 100 units so that 4-5 simultaneous lines were justified cost wise.
First foc mk 1 will only come in September.
Remember they have to deliver only 20 foc birds by 2022 ( before mk1a production starts for which no order has been given as of now )
So what is the point of investing into additional production capacity.
Sent from my C103 using Tapatalk
HAL is supposed to deliver 16 units in 2019-20, as per its own production plan. This number is nowhere in sight today.Don't think too much mk1 production schedules on time in 2021 end 16 foc mk1 will be delivered and rest 8 fov trainer in 2022, also in end of 2021 or 2022 mk1 a take first flight and we can see series production in end of 2022 or in early 2023 (if 83 mk1a order cleared) in 2024 the production touch 16 LCA per year in 2025 mk2 and in end of 2028 we can see mk2 series production, so chill guys everything going as planned
Don't know the specific cause....Any knows why India not send tejas jet in Paris air show and why specifications not yet finalized by air force ,hal, ada
Sent from my Alfa L using Tapatalk
HAL BoseDka was supposed to deliver 16 from 2016. After IOC in 2014 HAL statement was 4 in 2014 8 in 2015 and 16 from 2016. Sab ke sab neech, mad*rch*d, hain...HAL is supposed to deliver 16 units in 2019-20, as per its own production plan. This number is nowhere in sight today.
Bhai. Iaf should have ordered more IOC.....HAL BoseDka was supposed to deliver 16 from 2016. After IOC in 2014 HAL statement was 4 in 2014 8 in 2015 and 16 from 2016. Sab ke sab neech, mad*rch*d, hain...
They should have delivered all 40 in IOC and then upgraded to foc standard within a year as foc is just software upgrade. All structural changes are in Mk1A. Look at F-35 production they are producing IOC version in hundreds and then all will upgraded to foc standards. That's how fighters are built around the world. You can also check Rafales and eurofighter typhoon same production schedule..
The only thing with HAL is they are incompetent parasites living on tax payers money...
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
LCA Tejas: Photos & Footages (no text other than headings) | Military Multimedia | 87 | ||
LCA TEJAS and what makes it stand out | Knowledge Repository | 8 | ||
W | Rise of LCA Tejas Multi Role Fighter Aircraft | Indian Air Force | 23 | |
C | LRUs or parts of LCA Tejas Made and designed in India | Indian Air Force | 16 |