LCA TEJAS MK1 & MK1A: News and Discussion

patriots

Defense lover
New Member
Joined
Aug 23, 2017
Messages
5,706
Likes
21,817
Country flag
Some insight s from my side
1.the python 5 is back
2.astra integration is on,heard that it's only software upgradation
3.saaw integration is on with tejas,Tejas will be able to carry both dual rack and quad rack lunchers saaw
4.ada is integrating all missiles
 

Akula

New Member
Joined
Apr 24, 2019
Messages
2,895
Likes
10,850
Country flag
The positioning of refueling-probe in Mark1A may have been altered.View attachment 55716
The Aircraft Research and Design Centre (ARDC), a wing of Hindustan Aeronautics Limited (HAL) has completed the structural design of the new variant of Light Combat Aircraft Tejas Mk1A. The provisional set of drawings has also been released, which will finally be cleared by the certifying agencies.

The integration of new systems will begin early next year, followed by series of rig tests and later the all critical flight tests. It is expected close to 200 flight trials will be undertaken before all new systems are being proven as per the requirements and satisfaction of Indian Air Force (IAF).

Unlike the early versions of Tejas, ARDC will be the lead designer of Mk1A programme as per its work-share arrangement with Aeronautical Development Agency (ADA). The metal-cutting is expected to commence one year after the contract finalization and as things stand now, the Tejas Mk1A will have its first flight during the last quarter of FY 2022-23.

It is certain that the designers and engineers are leaving no efforts to create real estate on Tejas Mk1A to address long-term manoeuvrability issues. New set of cables are to be in increasing more space inside the aircraft. (...not sure what this lady part means.)
Bleh, if Tejas mk1A refuelling probe's position has been changed than it means they are looking for placing IRST pod(as mentioned by Indranil).
 

Bleh

Laughing member
New Member
Joined
Nov 23, 2017
Messages
6,239
Likes
26,077
Country flag
Bleh, if Tejas mk1A refuelling probe's position has been changed than it means they are looking for placing IRST pod(as mentioned by Indranil).
Could be... If not right now, maybe in future when it's ready.
 

vayuu1

New Member
Joined
Sep 24, 2015
Messages
1,031
Likes
1,765
Country flag
Off topic but want to know if we are working on a photonic radar, considering that is the next big thing and big 3 are already working on it.
 

patriots

Defense lover
New Member
Joined
Aug 23, 2017
Messages
5,706
Likes
21,817
Country flag
Could be... If not right now, maybe in future when it's ready.
In last of the report the author said...
"New set of cables are to be in increasing more space inside the aircraft"
So we can add new subsystem s
 

Bleh

Laughing member
New Member
Joined
Nov 23, 2017
Messages
6,239
Likes
26,077
Country flag
In last of the report the author said...
"New set of cables are to be in increasing more space inside the aircraft"
So we can add new subsystem s
About that... What's this speed to mean? How with increasing internal space address maneuverability issue?
It is certain that the designers and engineers are leaving no efforts to create real estate on Tejas Mk1A to address long-term manoeuvrability issues.
 

patriots

Defense lover
New Member
Joined
Aug 23, 2017
Messages
5,706
Likes
21,817
Country flag
About that... What's this speed to mean? How with increasing internal space address maneuverability issue?
No no the maneuverability issue is with ioc only ,I believe...and it's only a software upgradation... nothing with internal space
Test pilot s are testing Tejas ,as you know it is flown upto 8.5 g ,which is a good number....but now it's upto them whether they allow the production variant s to that limit......same also with payload ..Tejas is tested upto 4.3 ton ,and will be tested upto 4.5 ton ,but will they allow this amount of load in production variant that's a question......

“The Tejas Mk1A will have excellent manoeuvrability, unhindered by control and stability considerations, over the widest possible speed and CG (centre of gravity) range from + 8 to -3 g,” says the official
From the report itself....
 

WolfPack86

New Member
Joined
Oct 20, 2015
Messages
10,571
Likes
16,993
Country flag
Upgraded Tejas fighter, touted as 'real desi game-changer', to fly in 2022-23
The Aircraft Research and Design Centre (ARDC), a vibrant wing of Hindustan Aeronautics Limited (HAL), has completed the structural design of the new variant of Light Combat Aircraft, called Tejas Mk1A.


The provisional set of drawings has also been released, which will finally be cleared by the certifying agencies. The additional system design activities are currently in progress. In six-months’ time, new set of equipment will start arriving ahead for integration. By then, the final system design is also expected to be in place.


If HAL sticks to the current timelines, then the integration of new systems will begin early next year, followed by series of rig tests and later the all-critical flight tests.


It is expected close to 200 flight trials will be undertaken before all new systems are being proven as per the requirements and satisfaction of the Indian Air Force (IAF).


The advanced features of Tejas Mk1A will be proven on two limited series production (LSP) aircraft, which are part of the ongoing trials of the fighter programme.


HAL hopes to have the final configuration of the Tejas Mk1A by 2022-23.


All the current activities are expected to get a morale boost further when the ministry of defence (MoD) will finally award the contract of 83 Tejas Mk1As to HAL.


The contract worth around Rs 38,000 crore (including spares, weapons, engine testbeds), is still under finalisation and is likely to be inked in the last quarter of this year.


Onus on HAL


Unlike the early versions of Tejas, ARDC will be the lead designer of Mk1A programme as per its workshare arrangement with Aeronautical Development Agency (ADA). With this arrangement, HAL probably also got an opportunity to lessen the trust deficit other stakeholders had on them when it came to the Tejas programme.


With so much of national pride pinned on the Tejas programme, the onus on HAL/ARDC has increased manifold now. In addition to Tejas variants, the team has the responsibility of other projects like the HTT-40, IJT and UAVs.


Future programmes like LCA-MK2, TEDBF and AMCA will also see active participation of ARDC. Tejas Mk1A is an upgraded version of the final operational clearance (FOC) configuration (Mk1) with 80 per cent of the detail components being the same.

HAL needs to deliver 20 MK1 variants to IAF for the second Tejas squadron in Sulur, the Flying Bullets.


Desi game-changer


The metal cutting is expected to commence one year after the contract finalisation and as things stand now, the Tejas Mk1A will have its first flight during the last quarter of FY 2022-23. The delivery of all the 83 aircraft will be completed within six years from the supply of the first fighter.


HAL is to deliver 73 fighters and 10 trainers under the yet-to-beinked contract of 83 Tejas Mk1As.


HAL insiders term Tejas MK1A as a ‘real desi game-changer’, which will be setting aeronautical benchmarks for India’s future fighter programmes.


What give Tejas MK1A more teeth compared with earlier version of Tejas are four key capabilities over the current variant. The major improvements are planned in operational roles, enhancing the combat ability and maintainability improvements through incorporation of active electronically scanned array (AESA) radar, electronic warfare (EW) suite and beyond-visual range (BVR) missile capabilities.


Desi air-to-air missile Astra Mk1 will be integrated on Tejas Mk1A, giving an edge to the fighter over its contemporaries in BVR warfare. “With the introduction of podded self-protection jammer (SPJ) and AESA on Tejas Mk1A, the survivability of the aircraft is further enhanced. Besides, Astra and ASRAAM (Advanced Short-Range Air-to-Air Missile), the fighter will also carry missiles for long-range as well as short-range operations. This is in addition to prevailing store configurations to increase offensive capability,” an official overseeing the programme said.


The AESA radar will give Tejas improved range with near-simultaneous missile-firing options on multiple targets and increased situational awareness with mode interleaving.

“The AESA radar will be electronically scanned agile beam radar based on transmit/receive modules (TRM) and supports multimode operation. The radar is having capability to track multiple targets at a time in air-to-air, air-to-ground and air-to-sea modes,” says the official.


The unified electronic warfare suite (UEWS) will provide capabilities for electronic countermeasures (ECM) and ECCM (electronic counter-countermeasures), with extended band of operation for threat detection and jamming capability.


“The EW capability will increase survivability of the aircraft in a networked environment. With the integration of an external jamming pod, the aircraft will be able to do its duty as offensive air combat platform,” he added.


More real estate


Additional features that are getting on board Tejas Mk1A, boosting its precision warfighting capabilities, include a digital moving map with 2D maps and 3D perspective view, provision for GLONASS (Global Navigation Satellite System), the Indian Regional Navigation Satellite System (IRNSS)-based positioning system, GAGAN (GPS-aided geo-augmented navigation) and SBAS (Satellite-based Augmentation system).


“The Tejas Mk1A will have excellent manoeuvrability, unhindered by control and stability considerations, over the widest possible speed and CG (centre of gravity) range from + 8 to -3g,” says the official.


On the maintainability front, the new Tejas promises to be a delight for the ground support crew with ARDC planning to incorporate many new features.


“The idea is to step up the availability of aircraft and reduce the turnaround time. Based on various inputs, we are making changes in the roots of the aircraft,” says the official.

New panels are getting in to reduce the DI (daily inspection) time. A new concept called ‘panel-in-panel’ will be in place to increase the visibility of the components during DI.


It is certain that the designers and engineers are leaving no efforts to create real estate on Tejas Mk1A to address long-term maintainability issues. New set of cables are to be used in increasing more space inside the aircraft.
 

piKacHHu

New Member
Joined
Sep 5, 2015
Messages
323
Likes
994
Country flag
Upgraded Tejas fighter, touted as 'real desi game-changer', to fly in 2022-23
The Aircraft Research and Design Centre (ARDC), a vibrant wing of Hindustan Aeronautics Limited (HAL), has completed the structural design of the new variant of Light Combat Aircraft, called Tejas Mk1A.


The provisional set of drawings has also been released, which will finally be cleared by the certifying agencies. The additional system design activities are currently in progress. In six-months’ time, new set of equipment will start arriving ahead for integration. By then, the final system design is also expected to be in place.


If HAL sticks to the current timelines, then the integration of new systems will begin early next year, followed by series of rig tests and later the all-critical flight tests.


It is expected close to 200 flight trials will be undertaken before all new systems are being proven as per the requirements and satisfaction of the Indian Air Force (IAF).


The advanced features of Tejas Mk1A will be proven on two limited series production (LSP) aircraft, which are part of the ongoing trials of the fighter programme.


HAL hopes to have the final configuration of the Tejas Mk1A by 2022-23.


All the current activities are expected to get a morale boost further when the ministry of defence (MoD) will finally award the contract of 83 Tejas Mk1As to HAL.


The contract worth around Rs 38,000 crore (including spares, weapons, engine testbeds), is still under finalisation and is likely to be inked in the last quarter of this year.


Onus on HAL


Unlike the early versions of Tejas, ARDC will be the lead designer of Mk1A programme as per its workshare arrangement with Aeronautical Development Agency (ADA). With this arrangement, HAL probably also got an opportunity to lessen the trust deficit other stakeholders had on them when it came to the Tejas programme.


With so much of national pride pinned on the Tejas programme, the onus on HAL/ARDC has increased manifold now. In addition to Tejas variants, the team has the responsibility of other projects like the HTT-40, IJT and UAVs.


Future programmes like LCA-MK2, TEDBF and AMCA will also see active participation of ARDC. Tejas Mk1A is an upgraded version of the final operational clearance (FOC) configuration (Mk1) with 80 per cent of the detail components being the same.

HAL needs to deliver 20 MK1 variants to IAF for the second Tejas squadron in Sulur, the Flying Bullets.


Desi game-changer


The metal cutting is expected to commence one year after the contract finalisation and as things stand now, the Tejas Mk1A will have its first flight during the last quarter of FY 2022-23. The delivery of all the 83 aircraft will be completed within six years from the supply of the first fighter.


HAL is to deliver 73 fighters and 10 trainers under the yet-to-beinked contract of 83 Tejas Mk1As.


HAL insiders term Tejas MK1A as a ‘real desi game-changer’, which will be setting aeronautical benchmarks for India’s future fighter programmes.


What give Tejas MK1A more teeth compared with earlier version of Tejas are four key capabilities over the current variant. The major improvements are planned in operational roles, enhancing the combat ability and maintainability improvements through incorporation of active electronically scanned array (AESA) radar, electronic warfare (EW) suite and beyond-visual range (BVR) missile capabilities.


Desi air-to-air missile Astra Mk1 will be integrated on Tejas Mk1A, giving an edge to the fighter over its contemporaries in BVR warfare. “With the introduction of podded self-protection jammer (SPJ) and AESA on Tejas Mk1A, the survivability of the aircraft is further enhanced. Besides, Astra and ASRAAM (Advanced Short-Range Air-to-Air Missile), the fighter will also carry missiles for long-range as well as short-range operations. This is in addition to prevailing store configurations to increase offensive capability,” an official overseeing the programme said.


The AESA radar will give Tejas improved range with near-simultaneous missile-firing options on multiple targets and increased situational awareness with mode interleaving.

“The AESA radar will be electronically scanned agile beam radar based on transmit/receive modules (TRM) and supports multimode operation. The radar is having capability to track multiple targets at a time in air-to-air, air-to-ground and air-to-sea modes,” says the official.


The unified electronic warfare suite (UEWS) will provide capabilities for electronic countermeasures (ECM) and ECCM (electronic counter-countermeasures), with extended band of operation for threat detection and jamming capability.


“The EW capability will increase survivability of the aircraft in a networked environment. With the integration of an external jamming pod, the aircraft will be able to do its duty as offensive air combat platform,” he added.


More real estate


Additional features that are getting on board Tejas Mk1A, boosting its precision warfighting capabilities, include a digital moving map with 2D maps and 3D perspective view, provision for GLONASS (Global Navigation Satellite System), the Indian Regional Navigation Satellite System (IRNSS)-based positioning system, GAGAN (GPS-aided geo-augmented navigation) and SBAS (Satellite-based Augmentation system).


“The Tejas Mk1A will have excellent manoeuvrability, unhindered by control and stability considerations, over the widest possible speed and CG (centre of gravity) range from + 8 to -3g,” says the official.


On the maintainability front, the new Tejas promises to be a delight for the ground support crew with ARDC planning to incorporate many new features.


“The idea is to step up the availability of aircraft and reduce the turnaround time. Based on various inputs, we are making changes in the roots of the aircraft,” says the official.

New panels are getting in to reduce the DI (daily inspection) time. A new concept called ‘panel-in-panel’ will be in place to increase the visibility of the components during DI.


It is certain that the designers and engineers are leaving no efforts to create real estate on Tejas Mk1A to address long-term maintainability issues. New set of cables are to be used in increasing more space inside the aircraft.
Strange to see that first flight of Mk1A will take place in 2023 despite the fact this version is having similar air frame as Tejas Mk1 FOC. Assuming its first roll out in early 2024; the order will be completed in 6 years time frame i.e. in 2030 (@ 14 aircraft per year).

And we are expecting other greenfield projects like MWF or ORCA going live in 2025-2026 with production series aircraft for IAF for which metal cutting is yet to start for first prototype. Half a decade is quite a long duration.

Going by this rate, I feel AM Nambi's assertion was up to the mark w.r.t AMCA where he predicted formation of AMCA squadrons in 2040s.
 

LondonParisTokyo

New Member
Joined
Oct 15, 2015
Messages
2,971
Likes
8,238
Country flag
If Mk1A is going to fly in 2023, then it's moving way too slow. It needs to move at double the speed, maybe quadruple. Integrate parts, test flights, all within the next 1-2 years maximum.
 

Bleh

Laughing member
New Member
Joined
Nov 23, 2017
Messages
6,239
Likes
26,077
Country flag
Strange to see that first flight of Mk1A will take place in 2023 despite the fact this version is having similar air frame as Tejas Mk1 FOC. Assuming its first roll out in early 2024; the order will be completed in 6 years time frame i.e. in 2030 (@ 14 aircraft per year).
If Mk1A is going to fly in 2023, then it's moving way too slow. It needs to move at double the speed, maybe quadruple. Integrate parts, test flights, all within the next 1-2 years maximum.
Tejas airframe was designed in 9 years, the 4.5th gen tech & subsystems development took 19. That's the harder part!
Flight in later quarter of 2022-23 was always fixed.
IMG_20200807_071823.png

I learnt that new droptanks will be operational before FOC order is completed, but they're not making any changes to Mark1A airframe, because apparently in that case they'll have to do flight testing & alter the flight control softwares.
 
Last edited:

patriots

Defense lover
New Member
Joined
Aug 23, 2017
Messages
5,706
Likes
21,817
Country flag
Clarification.........
Mk1a subsystem s .......are flying with lsps
Mk1a will fly in 2023-2024 ...if iaf signs orders in 2020...
Rafale deal signed in September 2016
And they delivered in in 2019 ,that's same for all aircraft manufacture..s.....
 

WolfPack86

New Member
Joined
Oct 20, 2015
Messages
10,571
Likes
16,993
Country flag

No doubt that Tejas Mk. 1A will be far advanced than current Mk. 1 , but I hoped for production rate of min 16/y . In that case even if production commence in 2025 all would be delivered by 2030-31. And wished for 24/y for LCA Mk. 2. But now it seems things may not be like that.
 

VIP

Ultra Nationalist
New Member
Joined
Mar 22, 2012
Messages
5,479
Likes
5,657
Country flag
If Mk1A is going to fly in 2023, then it's moving way too slow. It needs to move at double the speed, maybe quadruple. Integrate parts, test flights, all within the next 1-2 years maximum.
That's timeframe for delivery of new aircraft from production line, it takes time to operationalize the production line for different standard, testing on LSPs is already begun. You will hear more and more goody goody stuff of integration of various subsystems during these 2-3 years. Big question mark is, when will the deal be signed?
 

WolfPack86

New Member
Joined
Oct 20, 2015
Messages
10,571
Likes
16,993
Country flag
Upgraded Tejas fighter, touted as 'real desi game-changer', to fly in 2022-23

The Aircraft Research and Design Centre (ARDC), a vibrant wing of Hindustan Aeronautics Limited (HAL), has completed the structural design of the new variant of Light Combat Aircraft, called Tejas Mk1A.

The provisional set of drawings has also been released, which will finally be cleared by the certifying agencies. The additional system design activities are currently in progress. In six-months’ time, new set of equipment will start arriving ahead for integration. By then, the final system design is also expected to be in place.

If HAL sticks to the current timelines, then the integration of new systems will begin early next year, followed by series of rig tests and later the all-critical flight tests.


It is expected close to 200 flight trials will be undertaken before all new systems are being proven as per the requirements and satisfaction of the Indian Air Force (IAF).

The advanced features of Tejas Mk1A will be proven on two limited series production (LSP) aircraft, which are part of the ongoing trials of the fighter programme.

HAL hopes to have the final configuration of the Tejas Mk1A by 2022-23.

All the current activities are expected to get a morale boost further when the ministry of defence (MoD) will finally award the contract of 83 Tejas Mk1As to HAL.

The contract worth around Rs 38,000 crore (including spares, weapons, engine testbeds), is still under finalisation and is likely to be inked in the last quarter of this year.


Onus on HAL

Unlike the early versions of Tejas, ARDC will be the lead designer of Mk1A programme as per its workshare arrangement with Aeronautical Development Agency (ADA). With this arrangement, HAL probably also got an opportunity to lessen the trust deficit other stakeholders had on them when it came to the Tejas programme.

With so much of national pride pinned on the Tejas programme, the onus on HAL/ARDC has increased manifold now. In addition to Tejas variants, the team has the responsibility of other projects like the HTT-40, IJT and UAVs.

Future programmes like LCA-MK2, TEDBF and AMCA will also see active participation of ARDC. Tejas Mk1A is an upgraded version of the final operational clearance (FOC) configuration (Mk1) with 80 per cent of the detail components being the same.

HAL needs to deliver 20 MK1 variants to IAF for the second Tejas squadron in Sulur, the Flying Bullets.


Desi game-changer

The metal cutting is expected to commence one year after the contract finalisation and as things stand now, the Tejas Mk1A will have its first flight during the last quarter of FY 2022-23. The delivery of all the 83 aircraft will be completed within six years from the supply of the first fighter.

HAL is to deliver 73 fighters and 10 trainers under the yet-to-beinked contract of 83 Tejas Mk1As.

HAL insiders term Tejas MK1A as a ‘real desi game-changer’, which will be setting aeronautical benchmarks for India’s future fighter programmes.

What give Tejas MK1A more teeth compared with earlier version of Tejas are four key capabilities over the current variant. The major improvements are planned in operational roles, enhancing the combat ability and maintainability improvements through incorporation of active electronically scanned array (AESA) radar, electronic warfare (EW) suite and beyond-visual range (BVR) missile capabilities.

Desi air-to-air missile Astra Mk1 will be integrated on Tejas Mk1A, giving an edge to the fighter over its contemporaries in BVR warfare. “With the introduction of podded self-protection jammer (SPJ) and AESA on Tejas Mk1A, the survivability of the aircraft is further enhanced. Besides, Astra and ASRAAM (Advanced Short-Range Air-to-Air Missile), the fighter will also carry missiles for long-range as well as short-range operations. This is in addition to prevailing store configurations to increase offensive capability,” an official overseeing the programme said.

The AESA radar will give Tejas improved range with near-simultaneous missile-firing options on multiple targets and increased situational awareness with mode interleaving.

“The AESA radar will be electronically scanned agile beam radar based on transmit/receive modules (TRM) and supports multimode operation. The radar is having capability to track multiple targets at a time in air-to-air, air-to-ground and air-to-sea modes,” says the official.

The unified electronic warfare suite (UEWS) will provide capabilities for electronic countermeasures (ECM) and ECCM (electronic counter-countermeasures), with extended band of operation for threat detection and jamming capability.

“The EW capability will increase survivability of the aircraft in a networked environment. With the integration of an external jamming pod, the aircraft will be able to do its duty as offensive air combat platform,” he added.


More real estate

Additional features that are getting on board Tejas Mk1A, boosting its precision warfighting capabilities, include a digital moving map with 2D maps and 3D perspective view, provision for GLONASS (Global Navigation Satellite System), the Indian Regional Navigation Satellite System (IRNSS)-based positioning system, GAGAN (GPS-aided geo-augmented navigation) and SBAS (Satellite-based Augmentation system).

“The Tejas Mk1A will have excellent manoeuvrability, unhindered by control and stability considerations, over the widest possible speed and CG (centre of gravity) range from + 8 to -3g,” says the official.

On the maintainability front, the new Tejas promises to be a delight for the ground support crew with ARDC planning to incorporate many new features.

“The idea is to step up the availability of aircraft and reduce the turnaround time. Based on various inputs, we are making changes in the roots of the aircraft,” says the official.

New panels are getting in to reduce the DI (daily inspection) time. A new concept called ‘panel-in-panel’ will be in place to increase the visibility of the components during DI.

It is certain that the designers and engineers are leaving no efforts to create real estate on Tejas Mk1A to address long-term maintainability issues. New set of cables are to be used in increasing more space inside the aircraft.

 

prasadr14

PrasadReddy
New Member
Joined
Sep 25, 2015
Messages
10,118
Likes
55,387
Upgraded Tejas fighter, touted as 'real desi game-changer', to fly in 2022-23

The Aircraft Research and Design Centre (ARDC), a vibrant wing of Hindustan Aeronautics Limited (HAL), has completed the structural design of the new variant of Light Combat Aircraft, called Tejas Mk1A.

The provisional set of drawings has also been released, which will finally be cleared by the certifying agencies. The additional system design activities are currently in progress. In six-months’ time, new set of equipment will start arriving ahead for integration. By then, the final system design is also expected to be in place.

If HAL sticks to the current timelines, then the integration of new systems will begin early next year, followed by series of rig tests and later the all-critical flight tests.


It is expected close to 200 flight trials will be undertaken before all new systems are being proven as per the requirements and satisfaction of the Indian Air Force (IAF).

The advanced features of Tejas Mk1A will be proven on two limited series production (LSP) aircraft, which are part of the ongoing trials of the fighter programme.

HAL hopes to have the final configuration of the Tejas Mk1A by 2022-23.

All the current activities are expected to get a morale boost further when the ministry of defence (MoD) will finally award the contract of 83 Tejas Mk1As to HAL.

The contract worth around Rs 38,000 crore (including spares, weapons, engine testbeds), is still under finalisation and is likely to be inked in the last quarter of this year.


Onus on HAL

Unlike the early versions of Tejas, ARDC will be the lead designer of Mk1A programme as per its workshare arrangement with Aeronautical Development Agency (ADA). With this arrangement, HAL probably also got an opportunity to lessen the trust deficit other stakeholders had on them when it came to the Tejas programme.

With so much of national pride pinned on the Tejas programme, the onus on HAL/ARDC has increased manifold now. In addition to Tejas variants, the team has the responsibility of other projects like the HTT-40, IJT and UAVs.

Future programmes like LCA-MK2, TEDBF and AMCA will also see active participation of ARDC. Tejas Mk1A is an upgraded version of the final operational clearance (FOC) configuration (Mk1) with 80 per cent of the detail components being the same.

HAL needs to deliver 20 MK1 variants to IAF for the second Tejas squadron in Sulur, the Flying Bullets.


Desi game-changer

The metal cutting is expected to commence one year after the contract finalisation and as things stand now, the Tejas Mk1A will have its first flight during the last quarter of FY 2022-23. The delivery of all the 83 aircraft will be completed within six years from the supply of the first fighter.

HAL is to deliver 73 fighters and 10 trainers under the yet-to-beinked contract of 83 Tejas Mk1As.

HAL insiders term Tejas MK1A as a ‘real desi game-changer’, which will be setting aeronautical benchmarks for India’s future fighter programmes.

What give Tejas MK1A more teeth compared with earlier version of Tejas are four key capabilities over the current variant. The major improvements are planned in operational roles, enhancing the combat ability and maintainability improvements through incorporation of active electronically scanned array (AESA) radar, electronic warfare (EW) suite and beyond-visual range (BVR) missile capabilities.

Desi air-to-air missile Astra Mk1 will be integrated on Tejas Mk1A, giving an edge to the fighter over its contemporaries in BVR warfare. “With the introduction of podded self-protection jammer (SPJ) and AESA on Tejas Mk1A, the survivability of the aircraft is further enhanced. Besides, Astra and ASRAAM (Advanced Short-Range Air-to-Air Missile), the fighter will also carry missiles for long-range as well as short-range operations. This is in addition to prevailing store configurations to increase offensive capability,” an official overseeing the programme said.

The AESA radar will give Tejas improved range with near-simultaneous missile-firing options on multiple targets and increased situational awareness with mode interleaving.

“The AESA radar will be electronically scanned agile beam radar based on transmit/receive modules (TRM) and supports multimode operation. The radar is having capability to track multiple targets at a time in air-to-air, air-to-ground and air-to-sea modes,” says the official.

The unified electronic warfare suite (UEWS) will provide capabilities for electronic countermeasures (ECM) and ECCM (electronic counter-countermeasures), with extended band of operation for threat detection and jamming capability.

“The EW capability will increase survivability of the aircraft in a networked environment. With the integration of an external jamming pod, the aircraft will be able to do its duty as offensive air combat platform,” he added.


More real estate

Additional features that are getting on board Tejas Mk1A, boosting its precision warfighting capabilities, include a digital moving map with 2D maps and 3D perspective view, provision for GLONASS (Global Navigation Satellite System), the Indian Regional Navigation Satellite System (IRNSS)-based positioning system, GAGAN (GPS-aided geo-augmented navigation) and SBAS (Satellite-based Augmentation system).

“The Tejas Mk1A will have excellent manoeuvrability, unhindered by control and stability considerations, over the widest possible speed and CG (centre of gravity) range from + 8 to -3g,” says the official.

On the maintainability front, the new Tejas promises to be a delight for the ground support crew with ARDC planning to incorporate many new features.

“The idea is to step up the availability of aircraft and reduce the turnaround time. Based on various inputs, we are making changes in the roots of the aircraft,” says the official.

New panels are getting in to reduce the DI (daily inspection) time. A new concept called ‘panel-in-panel’ will be in place to increase the visibility of the components during DI.

It is certain that the designers and engineers are leaving no efforts to create real estate on Tejas Mk1A to address long-term maintainability issues. New set of cables are to be used in increasing more space inside the aircraft.
Instead of changing games...
Why not get a 100 of them flying first..
 

Articles

Top