There was a 'conference' by SIATI on Fri Sat at HAL Convention Centre. Got some gyan from the presentations.
1. HAL really upbeat about completing the FOC Mk1 by March 2021.
2. Two of the IOC Mk1s are about to be handed over to IAF in 'these days'. Four FOC to be handed over before FY closes.
3. They are going full steam ahead with Mk1A. Order signing is only a formality.
4. The presentation said the engine is "F404-GE-IN30" and the guy actually said IN30. I can't recall such a designation. Neither can't google uncle. Either the guy have no clue and repeated a typo madce by the intern who typed in the ppt, or we at BRF have no clue.
5. Daggers flew 2500 operational hours and 3 aircraft completed the 250Hr servicing.
6. 311 "modifications" done concurrently in production
7. 82 LRU suppliers for 344 types out of which 210 are indigenous
8. High failure rate of 34 types LRUs which is still being worked on.
9. 3084 Machined parts
10. 172 Rubber parts
11. 4329 Sheet MEtal PArts.
12. 1106 Pipes
13. 10 Acrylic / Plastic parts
14. 427 Composite Parts
15. Capacity is 16 Aircraft. 8 at LCA Division, 4 At Aircraft Division and 4 at oursourced suppliers (Alpha Tocol, TAML, L&T and VEM). (Doesn't really add up)
16. 6 sets of Jigs. 4 at Tejas Division, 1 at Aircraft Division and 1 at subcontractor sites. (front jig at DTL, Rear jig at Alpha and mid at VEM)
17. They reduced cycle times by adding sub-sub assy jigs.
18. 43 types of jigs required.
19. Jigs calibrated to 8 micron using a laser measurement system. That is quite fast. Full interchangeability achieved.
20. Present cycle time: 6 months per set. He outlined the plans to increase and reach the target of 16 sets.
21. 7200 holes to be drilled per set of wing!!! They bought a robotic drilling machine that brought down the cycle time from 30 days/20ppl to 10 days/2ppl. Accuracy also improved. Better cleanliness since composite debris is vacuumed off by the robot
22. 185 panels are made interchangeability compliant. Include 24 nos of daily inspection panels. Extensive tooling made for panels.
23. All Pipe assemblies are made using jigs for full interchangeability and advanced sub assy preparation.
Senior manager of HAL in a one-on-one meeting says "LCA can crash only if it runs out of fuel". We all touched the wooden table and made a silent prayer.
The TED BF picture is just that, "a picture that people didn't reject right away" during the brainstorming.
Update from..brf