Can it be a missile test or the isro launch ?
Hehe UFO spotting..
Early Morning isro launch...Can it be a missile test or the isro launch ?
Launch successful
They aren't transporting that satellite from one place to other on a bullockcart,but they are testing it on bullockcart, since they don't have some testing facilities available then.
20T Methalox engine is based on CE-20. I am wondering whether it is possible to convert SCE-200 into methalox engine in future.20T methalox engine tested. 20T means 200KN. Equivalent to CE-20 engine
SCE-200 based Methalox engine will be in the class of Raptor engine. We can develop our own Starship in future if we want. But let them finish SC120 & then HLV.20T Methalox engine is based on CE-20. I am wondering whether it is possible to convert SCE-200 into methalox engine in future.
The first one is just an experiment I hope. Recovering the 3rd Stage but ditching the 1st and 2nd stage is pretty dumb lol..20T methalox engine tested. 20T means 200KN. Equivalent to CE-20 engine
how much time does it take to design such engines ??SCE-200 based Methalox engine will be in the class of Raptor engine. We can develop our own Starship in future if we want. But let them finish SC120 & then HLV.
It's a tech demonstrater just like X-37BThe first one is just an experiment I hope. Recovering the 3rd Stage but ditching the 1st and 2nd stage is pretty dumb lol..
1st they have to prove SCE-200. After that they can do a feasibility study whether a Methalox version of SCE-200 can be developed or an entirely new engine of 200T thrust class needed to be developed. Then they will decide what to dohow much time does it take to design such engines ??
considering there are now modern tech (computer sims,3d modelling...................)
Right now timeline for first engine test sce-200of 2027-28 if no further delays due to ukrain crisis or schedule of gaganyan. My openion is that we are stuck with gslv mk3 for atleast a decade and a lot of people agree with me in my circle1st they have to prove SCE-200. After that they can do a feasibility study whether a Methalox version of SCE-200 can be developed or an entirely new engine of 200T thrust class needed to be developed. Then they will decide what to do