i gave up on ISRO after they did that communist style hush hush after chandrayaan-2 crashedThese delays kinda hurt.
i gave up on ISRO after they did that communist style hush hush after chandrayaan-2 crashedThese delays kinda hurt.
Yup, that was bad PR. They should have disclosed the information. I don't think we were searching for transformers there.i gave up on ISRO after they did that communist style hush hush after chandrayaan-2 crashed
View attachment 97639
They are not releasing Failure Analysis Committee Report, when asked for it in a RTI , they replied that they cannot disclose the FAC report because of National Security reason. I don't understand what National Security issue is involved in FAC report for a civilian project,we are not asking the report of a military projectYup, that was bad PR. They should have disclosed the information. I don't think we were searching for transformers there.
Sir, ur terminology kinda confusing, CE term in CE-20 is means Cryo Engine and SCE in SCE-200 means Semi Cryo Engine, the number denotes the amount of thrust in tonnes i.e 20 in CE-20 means 20 tons of thrust. So CE-20 means Cryo Engine - 20 tonnes of thrust. For Stages we use the following nomenclature with single letter denoting type of fuel and number denoting the amount of fuel in tonnes, for example S200 means Solid Fuel stage with 200 tonnes propellent ,L110 means earth storable liquid fuel 110 tonnes, C25 means Cryo stage with 25 tonne fuel. You are saying CE-27 , is it a new Cryo engine or new Cryo stage with 27 tonnes of fuel?So far as I know, CE 27 will replace CE25 with better specific impulse. L 110 will be replaced with Semi cryogenic engine. This will allow GSLV MK III to lift more weight by 50% to 60%.
I don't know anything like CE 20. It is CE25. 25 denotes 25 tons fuel and not 25 kn thrust so far as I know. S200 means solid fuel motor with 200 ton propzlant. L110 heans Liquid fuel motor with 110 ton ptopalant. CE25 means Cryogenic engine with 25 ton fuel. Please check and let me know whether am I right or wrong.Sir, ur terminology kinda confusing, CE term in CE-20 is means Cryo Engine and SCE in SCE-200 means Semi Cryo Engine, the number denotes the amount of thrust in tonnes i.e 20 in CE-20 means 20 tons of thrust. So CE-20 means Cryo Engine - 20 tonnes of thrust. For Stages we use the following nomenclature with single letter denoting type of fuel and number denoting the amount of fuel in tonnes, for example S200 means Solid Fuel stage with 200 tonnes propellent ,L110 means earth storable liquid fuel 110 tonnes, C25 means Cryo stage with 25 tonne fuel. You are saying CE-27 , is it a new Cryo engine or new Cryo stage with 27 tonnes of fuel?
That's C-25 stage sir , CE-20 is the name of engineI don't know anything like CE 20. It is CE25. 25 denotes 25 tons fuel and not 25 kn thrust so far as I know. S200 means solid fuel motor with 200 ton propzlant. L110 heans Liquid fuel motor with 110 ton ptopalant. CE25 means Cryogenic engine with 25 ton fuel. Please check and let me know whether am I right or wrong.
It is a new proposed cryo stage to replace CE25 to carry more fuel, give higher thrust and specific impulse and longer burn time to lift havier payload.Sir, ur terminology kinda confusing, CE term in CE-20 is means Cryo Engine and SCE in SCE-200 means Semi Cryo Engine, the number denotes the amount of thrust in tonnes i.e 20 in CE-20 means 20 tons of thrust. So CE-20 means Cryo Engine - 20 tonnes of thrust. For Stages we use the following nomenclature with single letter denoting type of fuel and number denoting the amount of fuel in tonnes, for example S200 means Solid Fuel stage with 200 tonnes propellent ,L110 means earth storable liquid fuel 110 tonnes, C25 means Cryo stage with 25 tonne fuel. You are saying CE-27 , is it a new Cryo engine or new Cryo stage with 27 tonnes of fuel?
Lots of capabilities are dual purpose and they can apply the discretion but can release a highlevel analysis, may be they are still looking into it.....remember this is still very new for ISROThey are not releasing Failure Analysis Committee Report, when asked for it in a RTI , they replied that they cannot disclose the FAC report because of National Security reason. I don't understand what National Security issue is involved in FAC report for a civilian project,we are not asking the report of a military project
Ok I don’t know that.That's C-25 stage sir , CE-20 is the name of engine
Since countries have been failing to land on different celestial bodies for ages now, there was no harm in sharing correct information. Even our RW crowd was like "Nothing happened to Lander, Its JUST LYING TO ITS SIDE!" like they don't know how fast it impacted the surface!Yup, that was bad PR. They should have disclosed the information. I don't think we were searching for transformers there.
only God knowsWhat happened to RLV landing experiment(LEX)?
Pushed 1-1.5 years ahead.What happened to RLV landing experiment(LEX)?
Launch frequency is related to production and not learning curve. India has only one major spaceport with two launch pads (third in construction).I have been giving fair chances to ISRO for last 10 years for their launch targets in a year. They have never achieved that and the timeline for most of the satellite launch is delayed and keeps on pushing quarter by quarter, year by year.
Is there no concept of learning curve? I do understand the inherent challenges and engineering issues in space tech. I have followed it for a long time. But if other space faring countries are able to demonstrate a consistency in launches and incremental improvements, what is the thing with ISRO that they are just not there.
So much delay for a landingPushed 1-1.5 years ahead.
They earlier had planned a landing experience and a return flight one this year in October
Gaganyaan, Chandrayaan-3 and Aditya L1 are priorities.So much delay for a landing
I think it's equally important.Gaganyaan, Chandrayaan-3 and Aditya L1 are priorities.
It's yet in nascent stages overall. So, one experiment this year or two at once next year won't make any difference IMO.I think it's equally important.
This further delays the must important scramjet propulsion experiment which RLV would demonstrate,utmost needed for HAVA
Not to forget military POV,can place sattelites easier way and would be ready always.
Sir,I think the prototype for RLV-LEX is ready, they were waiting for Air Force helo, bureaucratic hurdles may be?It's yet in nascent stages overall. So, one experiment this year or two at once next year won't make any difference IMO.