indian_blues
New Member
- Joined
- Apr 18, 2009
- Messages
- 498
- Likes
- 1,278
How they have planned to recover the boosters?Many changes as compared to last presentation.
View attachment 88754
How they have planned to recover the boosters?Many changes as compared to last presentation.
View attachment 88754
How is it fully reusable when the second stage is expendable ??Fully reusable Air - breathing TSTO , it needs a turbofan engine to take-off from runway.
View attachment 88752
Booster ,more use of composite , better fuel ???View attachment 88765
How is LVM3 different from GSLV Mk-III?
Semi cryogenic engine and more propellant in cryogenic stage.View attachment 88765
How is LVM3 different from GSLV Mk-III?
First flight of GSLV Mk III was known as lvm 3 which was loaded with liquid nitrogen in cryogenic tank.View attachment 88765
How is LVM3 different from GSLV Mk-III?
When will it be launchedFirst flight of GSLV Mk III was known as lvm 3 which was loaded with liquid nitrogen in cryogenic tank.
Next version of GSLV Mk III will have semi cryogenic engine sce 200 replacing Vikas engine.
sce 200 engine still under developmentWhen will it be launched
Isn't it planned only after gaganyaansce 200 engine still under development
Hmmm...there is a lot riding on the 110KN AMCA engine
Maybe, but we need Jet Engine technology so bad.Hmmm...there is a lot riding on the 110KN AMCA engine
Hope it comes on time
Isro is also developing a new Nano-Satellite launch vehicle (NSLV) apart from SSLV.
View attachment 88747
ISRO also got approval to develop fully reusable TSTO
View attachment 88748
View attachment 88749
HAVA.
View attachment 88750
View attachment 88751
Fully reusable Air - breathing TSTO , it needs a turbofan engine to take-off from runway.
View attachment 88752
View attachment 88753
Umm, most of these are just old stuff but slight changes. Now just one query, in this particular slide you can see that for RLV they are aiming to get a VL config of the booster by 2024 so does that mean both Booster and that RLV both will be reusable and can they really pull off something like that by that time if that's the case? I mean even Space X is still trying out that with starship and they have a long way to go.Govt already gave approval for it. We can see it by 2030 atleast ,if not earlier.View attachment 88756
VL of booster is Technology demonstration by 2024 using ADMIRE .Fully reusable TSTO with VL booster and winged RLV is by 2030.Umm, most of these are just old stuff but slight changes. Now just one query, in this particular slide you can see that for RLV they are aiming to get a VL config of the booster by 2024 so does that mean both Booster and that RLV both will be reusable and can they really pull off something like that by that time if that's the case? I mean even Space X is still trying out that with starship and they have a long way to go.
It should have been completed by now.Isn't it planned only after gaganyaan
We already did that to them with the Foxbats. They were brimming with impotent rage back then when one of the Foxbats did a sonic boom over Islamabad announcing to the Pakistani awaam that IAF is present and ghabrao bhosdiwalon. Similar to how they were brimming with impotent rage when we conducted the ASAT test.LMAO the TSTO would be hilarious.
Just imagine this thing hovering over Karachi and f16 can't do anything about it,not even lock their missles
First let it fly.LMAO the TSTO would be hilarious.
Just imagine this thing hovering over Karachi and f16 can't do anything about it,not even lock their missles