- Joined
- Aug 10, 2020
- Messages
- 29,517
- Likes
- 113,418
Ya'll Nibbiars The Vasai creek/Versiva creek bridge at Fountain hotel. And The Work was seen happening throughout the flyover. The Vaiduct work is almost complete,wings are being joined. The Ramp work on both sides are happening. The torturous road in and around Fountain hotel is taken up starting with SWDs.