- Joined
- Aug 17, 2017
- Messages
- 1,537
- Likes
- 2,417
Well a foreign company won't be investing on an Scrapped project of a 3rd word country. So FDI has come on ongoing project not on Scrapped project. Saras was Scrapped and revived, none of the foreign giants came aid despite knowing that such aircrafts will be high on demand for city to city connectivities in India.
Again wrong, because the development was with AB, while the proposition to use it without AB was just one of the options to use the available engine on a different platform. DRDO also proposed to use it in different form for naval vessels or trains. The fighter version with AB however was scrapped as the DRDO chief confirmed and got revived only by the French.
Read the reports I gave of the IAF committee, or the Safran Chief, which makes it clear that the aim is on using the M88 core, which means it's not fine tuning at all, but transfering a foreign heart into our base engine. And even the M88 ECO core was aimed only at 90kN thrust, which actually would be lower than required for LCA, while the 110kN for AMCA would require a further developed core as well. So still a lot of work to be done, with dedicated test and certifications, while the outcome is uncertain so far.
Sent from my Aqua Ace II using Tapatalk