keep on fighting on names..........
this class of Destroyers have been delays for so long, why can't govt impose fines if a project gets delayed?
Why not, Barak 2 contract was with israel, at least we can fine them for delay in development of missiles...
and no way these ships looks 99% complete, they only lack barak 2 missiles then they could be launched without they missiles.
and missiles could be integrated as part of refit later on.
Ships needs to be made in modular form..
Indian shipyards are great at pumping out hulls, but when it comes to fitting them it is a totally different story.
Indigenous starts and ends there.Indian shipyards are great at pumping out hulls, but when it comes to fitting them it is a totally different story.
So what if this is the INS Kochi or the INS Chennai?
One of the Kolkota Class Destroyers --- March 2013
From the time INS Kolkata was laid down to date, the JN shipyard in Shanghai has produced and completed 4 type 052C's, with 2 more to begin sea trials before year end and has 4 examples of its next generation destroyer the 052D under varying stages of completion in its building halls and waters. I'd post pics if it wasn't OT. All this despite Jiangnan taking a 4 year break from building destroyers when it moved and upgraded its facilities.1st pic is Kolkata class destroyer... everything completed except barak 8 fitment.
2nd pic is IAC... yes, there has been project delays due to babudom. Even the hull construction is not finished.
3rd pic is Scorpene subs... delay result of lacklusture French supervision... This laid back attitude of the French led to Dassault being made responsible for HAL manufactured Rafales.
So, still waiting for you to share reasons for "Indian shipyards are great at pumping out hulls, but when it comes to fitting them it is a totally different story".
The problem came with MoD bungling and DRDO's wrangling. DRDO took its own sweet time terming Trishul as a failure which forced IN to look at Israeli options. MoD took its own sweet time clearing the Barak deal. Now it seems there will be delays from the Israelis in delivering the system.From the time INS Kolkata was laid down to date, the JN shipyard in Shanghai has produced and completed 4 type 052C's, with 2 more to begin sea trials before year end and has 4 examples of its next generation destroyer the 052D under varying stages of completion in its building halls and waters. I'd post pics if it wasn't OT. All this despite Jiangnan taking a 4 year break from building destroyers when it moved and upgraded its facilities.
I wouldn't be surprised if the first 052D started sea trials before INS Kolkata leaves its shipyard's waters. These destroyers are being built at a snails pace regardless of which shipbuilding industry their measured up against.
PS. I'm just making a point here, put the nationalism away before replying...
From the time INS Kolkata was laid down to date, the JN shipyard in Shanghai has produced and completed 4 type 052C's, with 2 more to begin sea trials before year end and has 4 examples of its next generation destroyer the 052D under varying stages of completion in its building halls and waters. I'd post pics if it wasn't OT. All this despite Jiangnan taking a 4 year break from building destroyers when it moved and upgraded its facilities.
I wouldn't be surprised if the first 052D started sea trials before INS Kolkata leaves its shipyard's waters. These destroyers are being built at a snails pace regardless of which shipbuilding industry their measured up against.
PS. I'm just making a point here, put the nationalism away before replying...
None of the combat systems have been installed, it isn't even finished being painted.1st pic is Kolkata class destroyer... everything completed except barak 8 fitment.
Yeah, you can build it, but you can't fit it out.2nd pic is IAC... yes, there has been project delays due to babudom. Even the hull construction is not finished.
Delay result of babus not contracting or budgeting for subsystems... again shipyards unable to fit them out.3rd pic is Scorpene subs... delay result of lacklusture French supervision...
Three examples of inability to indigenously fit out hulls you build.So, still waiting for you to share reasons for "Indian shipyards are great at pumping out hulls, but when it comes to fitting them it is a totally different story".
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
A | First Complete Rendering of Kolkata Class | Indian Navy | 25 | |
P | INS Kolkata, Kochi and Chennai are more than enough to wipe out the entire Pak Navy | Indian Navy | 10 | |
Kolkata walks for Indian Armed Forces | Military History | 8 | ||
ISI agent held in Kolkata | Internal Security | 7 |